What's your project topic?

| Back |

Items In Project Materials Listing | Final Year Research Project Topics & Materials In PDF & Doc | iproject

  • 1. AN APPROACH TO APPLICATION OF TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE O...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective interna...Continue Reading »

    Item Type: Project Material |  50 pages |  8,551 engagements | 

  • 2. EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,591 engagements | 

  • 3. A COMPARATIVE STUDY OF THE ENTREPRENEURIAL CHARACTERISTICS OF ARCHITECTURE AND ...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,349 engagements | 

  • 4. IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUST...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  6,635 engagements | 

  • 5. AN APPROACH TO APPLICATION OF TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE O...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,476 engagements | 

  • 6. PARADIGM FOR TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE OPERATION

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,503 engagements | 

  • 7. MANAGING RETENTION IN RESIDENTIAL BUILDING PROJECTS

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,592 engagements | 

  • 8. MULTI-PARAMETER OPTIMIZATION OF COST ENTROPY FOR REINFORCED CONCRETE OFFICE BUIL...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,174 engagements | 

  • 9. COMPARATIVE ANALYSIS OF INCENTIVES PROVISION IN FOREIGN AND INDIGENOUS FIRM AND ...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,694 engagements | 

  • 10. THE IMPACT OF CONSTRUCTION INDUSTRY IN THE DEVELOPMENT OF NIGERIA

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  6,078 engagements | 

  • 11. FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  6,666 engagements | 

  • 12. EFFECTIVE MATERIAL MANAGEMENT IN BUILDING CONSTRUCTION SITE

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal...Continue Reading »

    Item Type: Project Material |  50 pages |  7,280 engagements | 

  • 13. PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  6,634 engagements | 

  • 14. SAFETY MANAGEMENT IN BUILDING CONSTRUCTION SITE

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  6,165 engagements | 

  • 15. PLANT RESOURCE CONTROL AS AN EFFECTIVE TOOL TO PROJECT DELIVERY IN BUILDING INDU...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,951 engagements | 

  • 16. IMPORTANCE OF INCENTIVES AND MOTIVATION OF HUMAN ELEMENT IN CONSTRUCTION INDUSTR...

    » Abstract This work examine the importance of incentives and motivation of human element in construction industry, a case study of construction industries in Abuja, Nigeria. The research objective and question were formulated to guide this work, descriptive research design was adopted and the five construction industries in Abuja were randomly selected for this research work and appropriate questio...Continue Reading »

    Item Type: Project Material |  50 pages |  5,986 engagements | 

  • 17. LABOUR PRODUCTIVITY ANALYSIS USING MULTI-VARIABLE LINEAR REGRESSION TECHNIQUE

    » TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1 Relevance of project 1.2 Site inspection 1.3 Evolution of road network in nigeria 1.4 Motor vehicle characteristic that affects road design data 1.5 Drivers and their characteristics 1.6 Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7 Factors Affecting Choice Of Station C...Continue Reading »

    Item Type: Project Material |  50 pages |  4,978 engagements | 

  • 18. RISK MANAGEMENT IN MEDIUM SIZED COMMERCIAL BUILDINGS

    » TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choi...Continue Reading »

    Item Type: Project Material |  50 pages |  5,593 engagements | 

  • 19. A REVIEW ON QUANTIFIED IMPACTS OF CONSTRUCTION LABOUR PRODUCTIVITY TOWARDS PROJE...

    » TABLE OF CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Ch...Continue Reading »

    Item Type: Project Material |  50 pages |  5,605 engagements | 

  • 20. EFFECTIVENESS OF NON-FINANCIAL MOTIVATIONAL SCHEMES ON CONSTRUCTION WORKERS OUTP...

    » TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choic...Continue Reading »

    Item Type: Project Material |  50 pages |  5,322 engagements | 

  • 21. A CRITICAL REVIEW OF THE CAUSES OF COST OVERRUN IN CONSTRUCTION INDUSTRIES IN DE...

    » TABLE OF CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Ch...Continue Reading »

    Item Type: Project Material |  50 pages |  5,170 engagements | 

  • 22. THE IMPACT OF NON-FINANCIAL INCENTIVES ON BRICKLAYERS PRODUCTIVITY IN NIGERIA

    » TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1 Relevance of project 1.2 Site inspection 1.3 Evolution of road network in nigeria 1.4 Motor vehicle characteristic that affects road design data 1.5 Drivers and their characteristics 1.6 Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7 Factors Affecting Choice Of Station C...Continue Reading »

    Item Type: Project Material |  50 pages |  7,107 engagements | 

  • 23. EXPLORING THE INFLUENCE OF WORKPLACE TRUST OVER HEALTH WORKERS PERFORMANCE

    » TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choic...Continue Reading »

    Item Type: Project Material |  50 pages |  5,013 engagements | 

  • 24. INCENTIVES AND DISINCENTIVE GUIDELINE FOR CONTRACTS IN NIGERIA

    » CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in Nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choice Of Station CHAPTER TWO THEODOLITE TRANSVERSING OF THE ROAD CONTROL 2.1  Definit...Continue Reading »

    Item Type: Project Material |  50 pages |  5,196 engagements | 

  • 25. EVALUATION OF INCENTIVE SCHEMES ON LABOUR PRODUCTION IN NIGERIA CONSTRUCTION IN...

    » CHAPTER ONE INTRODUCTION 1.1 Relevance of project 1.2 Site inspection 1.3 Evolution of road network in nigeria 1.4 Motor vehicle characteristic that affects road design data 1.5 Drivers and their characteristics 1.6 Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7 Factors Affecting Choice Of Station CHAPTER TWO THEODOLITE TRANSVERSING OF THE ROAD CONTROL 2.1 Definitions 2.2 Thetheo...Continue Reading »

    Item Type: Project Material |  50 pages |  5,656 engagements | 


Searching makes things a lot easier.. Search for what you are looking for

What's your project topic?