DETERMINATION OF LABOUR OUTPUT ON WINDOWS AND DOORS FIXING
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 67 pages | 1-5 chapters | Amount: ₦3,000 | 1 order. | Marked useful: 4,924 times
INSTANT PROJECT MATERIAL DOWNLOADABSTRACT
A major element in the success of the construction industry is the accuracy in construction project estimates. Previous researches have shown that most of the output constants used by estimators in the Nigerian construction industry are either derived from experience or are remnants of British colonial heritage. Hence, non-uniform outputs are widely used. The research is aimed at using work study approach to empirically establish labour output for doors and windows fixing in the Nigerian construction industry. A total of 30 construction sites were observed, 15 each for Kano and Jigawa States for three sizes of doors and three sizes of windows. The data collected were analyzed using inferential statistical analysis. The results of the analysis carried out established general average output values per day of; 12.00 nr, 13.00 nr and 16.00 nr casement windows sizes 1500 x 1200mm, 1200 x 1200mm and 600 x 600mm respectively. While 11.00 nr, 10.00 nr and 11.00 nr steel doors were established for sizes 1200 x 2100mm, 900 x 2100mm and 750 x 2100mm respectively. A two-tailed t-test analysis was used in assessing the influence of the labour productivity factors on the output of the workers observed. The inferential analysis revealed that mode of employment and experience, significantly affected workers output. Also the findings should serve as an effective baseline for contractors to exploit the output figures extracted according to productivity factors in order to optimize the productivity of their workers and profitability.
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
The efficiency of the construction industry is heavily reliant on its level of productivity. As noted by Adnan et al(2007), until the productivity level of construction activities is improved, the nation’s economy will continue to suffer setbacks. Hence, improving productivity has become a major concern of every profit-oriented organisation (Adnan et al,
2007). An important component of the construction industry productivity is labour. Labour costs represent a considerable proportion of the final cost of a building, usually accounting for between 40 to 60% of the building cost (Butchan et al, 1993). In addition, labour is known to be the most important factor of production since it is the only factor that creates value and sets the general level of productivity (Ameh and Odusami, 2002). According to Yates and Guhathakurta (1993), labour productivity is the value of gross output per worker, referred to as man-hour or work-hour. It also could be referred to as the careful attempts to measure the physical output of labour taking into account the other factors that affect construction productivity.
Recognising its importance, several studies have focused on the factors that affect labour productivity (Oloko, 1983; Lema, 1995; Yagba and Ayandele, 1999; Ameh and Odusami, 2002; Adnan et al, 2007; Kane et al, 2007). However, none of these studies provides an empirical evaluation of the level and extent of influence of these factors on the productivity of the Nigerian construction labour. Given the importance of such an issue, this research seeks to examine the influence of some productivity factors on labour outputs that were empirically established by the authors for some selected trades, and published elsewhere.
This material content is developed to serve as a GUIDE for students to conduct academic research
Find What You Want By Category:
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
For advertisement, call 08168958821
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
EVALUATING THE ROLE OF QUANTITY SURVEYORS IN SUSTAINABLE INFRASTRUCTURES DEVELOPMENT
ABSTRACT The world over, a vast number of developing countries are trying to achieve sustainable economic growth in every sector and more equitable di...More »
Item Type: Project Material | 50 pages | 10,457 engagements |
- 2.
INFLUENCE OF ESTIMATING PRACTICE ON COST PERFORMANCE OF BUILDING PROJECTS
ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the esti...More »
Item Type: Project Material | 50 pages | 7,509 engagements |
- 3.
THE EFFECT OF CONTRACT PLANNING ON CONSTRUCTION PROJECT PERFORMANCE
ABSTRACT This study examines contract planning on construction projects from clients’ perspective and its effects on performance. The objectives are...More »
Item Type: Project Material | 50 pages | 9,417 engagements |
- 4.
ASSESSMENT OF THE SURVIVAL PRACTICES OF QUANTITY SURVEYING FIRMS IN A RECESSED ECONOMY
CHAPTER ONE INTRODUCTION 1.1 Background to the study The construction industry plays an important role in a nation’s economy and its activ...More »
Item Type: Project Material | 50 pages | 7,243 engagements |
- 5.
IMPACT OF CONSTRUCTION SKILLED LABOUR SHORTAGES ON THE COMPETITIVENESS OF BUILDING SECTOR IN NIGERIA
ABSTRACT Skilled workforce is critical to the socio economic development of a country and forms the backbone of the construction industry. This study ...More »
Item Type: Project Material | 50 pages | 6,601 engagements |
- 6.
EFFECT OF NATIONAL CULTURE ON ORGANISATIONAL LEARNING: PERSPECTIVE ON QUANTITY SURVEYING FIRMS
ABSTRACT Learning remains one of the significant tools for improving performance of the construction sector. Individual quantity surveyors practicing ...More »
Item Type: Project Material | 50 pages | 5,153 engagements |