THE EFFECT ABANDONED BUILDINGS: MAGNETS FOR CRIME
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 85 pages | 1-5 chapters | Amount: ₦5,000 | 1 order. | Marked useful: 6,376 times
Delivery: Within 24 hoursTHE EFFECT ABANDONED BUILDINGS: MAGNETS FOR CRIME
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND TO THE STUDY
Abandoned projects and construction failure including building and other civil engineering infrastructure development project like houses, churches, schools, roads, bridges, dams, tunnels, air port, sea port etc. litter the whole Nigeria. Osemenan (1987) reported that Nigeria has become the “world’s junk-yard of abandoned and failed projects worth billions of naira and it is greatly unthinkable that Nigeria blessed with so great potentials in the building and construction industry can experience such magnitude of project failure and abandonment. According to another report by
Kotangora (1993) there are about 4000 uncompleted or abandoned project belonging to the Federal Government of Nigeria with an estimated cost of above N 300 billion which will take 30 years to complete at the present execution capacity of government, also according to him this issue of abandonment and construction project failure is been left without adequate attention for too long which is now having a multiplier effect on the construction industry in particular and the national economy as a whole. The building and construction industry plays a very dominant role in the economy of any nation. A healthy economy usually experience an increase in building and construction activities, but in a depressed economy, the incidence of project abandonment and construction failures tends to be more prevalent. Akindoyeni (1989) qualitatively reasoned that some of the causes of project abandonment and construction failure in Nigeria are deaths of client, inability of client to attract fund and lack of good planning. abandoned buildings
The abandonment of development projects is the act of discontinuing any activities or maintenance works on such development project within a time frame of the contract agreement and with no intention of returning back to the development (Spelman, 1993). Similarly, O’Flaherty (1993) while reflecting on property development projects suggest that it is when an owner or developer is ceasing to provide the required maintenance management to a developed property. There could also be construction failure due to improper planning.
However, real property development projects being a capital intensive undertaking should be critically analyzed to ascertain its feasibility and viability before embarking on it. But, on several occasions and as it had been observed, governments, contractors and agencies have abandoned development projects mid-way into construction and completion. abandoned buildings
The causes and effects of these development projects abandonments and construction failure are not just peculiar to a particular reason rather cut across several reasons (Ayodele and Alabi, 2011), and as well as creating a total dwindling effects on the values of developed properties located close and within the vicinity. The expected prominence of any earmarked development projects is to be completed, while at the same time, adding values to the built environment aesthetics. Although, development projects are temporary endeavors undertaken to create a unique product and services with a defined beginning and ending date (Gardner, 2005). The accomplishment of such purposes should be realized at all times otherwise needless of such development (Gardner, 2005). The development projects specific in the study framework is infrastructural projects (such as; house, electricity, road, schools, and drainage). However, the study purpose is to investigate and assess the causes and effects of development projects abandonment and construction failure in Nigeria. abandoned buildings
l. 21, National Vacant Properties Campaign. abandond buildings
This material content is developed to serve as a GUIDE for students to conduct academic research
Delivery: Within 24 hours
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
THE ROLE OF SOCIAL MEDIA IN RAISING AWARENESS AND CHANGING BEHAVIORS TOWARDS SOLID WASTE MANAGEMENT ...
THE ROLE OF SOCIAL MEDIA IN RAISING AWARENESS AND CHANGING BEHAVIORS TOWARDS SOLID WASTE MANAGEMENT IN CAMEROON CHAPTER ONE INTRODUCTION Backg...More »
Item Type: Project Material | 54 pages | 1,896 engagements |
- 2.
THE INFLUENCE OF SOCIOECONOMIC FACTORS ON SEWAGE DISPOSAL PRACTICES IN DOUALA, CAMEROON
CHAPTER ONE INTRODUCTION Background of the Study Sewage is the term used to describe the water that has been utilised by a community or industry...More »
Item Type: Project Material | 54 pages | 48,674 engagements |
- 3.
EVALUATING THE EFFECTIVENESS OF SEWAGE TREATMENT PLANTS IN PREVENTING ENVIRONMENTAL POLLUTION IN YAO...
CHAPTER ONE INTRODUCTION Background of the Study Globally, the rapid increase in urbanization, driven by the migration of people from rural and semi u...More »
Item Type: Project Material | 54 pages | 568 engagements |
- 4.
ASSESSMENT OF THE IMPACT OF SEWAGE DISPOSAL PRACTICES ON WATER QUALITY IN URBAN AREAS OF CAMEROON: A...
CHAPTER ONE INTRODUCTION Background of the Study In developed and developing nations, dues to human activities, residences, institutions, hospitals...More »
Item Type: Project Material | 54 pages | 619 engagements |
- 5.
ASSESSMENT OF THE ENVIRONMENTAL IMPACT OF INDUSTRIAL WASTEWATER DISPOSAL IN THE EAST REGION OF CAMER...
CHAPTER ONE INTRODUCTION Background of the Study Worldwide, many manufacturing industries depend on water for many uses such as manufacturing processe...More »
Item Type: Project Material | 54 pages | 639 engagements |
- 6.
ASSESSMENT OF THE CHALLENGES IN IMPLEMENTING SOLID WASTE MANAGEMENT POLICIES IN CAMEROON
CHAPTER ONE INTRODUCTION Background of the Study Globally, designing effective waste management policies and procedures has become the task of environ...More »
Item Type: Project Material | 54 pages | 608 engagements |