Home » Electrical Engineering » DESIGN AND CONSTRUCTION OF CONTROL SYSTEM FOR DIRECT-ON-LINE STARTING OF INDUCTI...
DESIGN AND CONSTRUCTION OF CONTROL SYSTEM FOR DIRECT-ON-LINE STARTING OF INDUCTION MACHINE
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | 2 orders. | Marked useful: 4,948 times
Delivery: Within 24 hoursABSTRACT
This project describes the methodical approach to the design and construction of control system for direct-on-line starting of induction machine. The procedures developed covers the construction of D.O.L stated for lower horse power motors. The prototype of this direct-on-Line starting of induction machine has been implemented following the methodical approach outlined in this project and its operational test and result are quite satisfactory. Adequate care has been taken in the design and construction of this project to ensure reliability. Therefore, the project is aimed at controlling the operation of single phase and three phase motors in industrial drive, companies, homes, laboratories and hospitals thereby reducing economic waste.
CHAPTER ONE
1.0 INTRODUCTION
Design and construction of control system for direct-on-line starting of induction machine: This is a control system that can control a single phase (1Ø) motors and three phase (3Ø) by making use of the components such as contactors, over current relay, start button, stop button etc. the contactors provides switching devices while over current relay is positioned to render protection to the machines in case of over current surge, the start and stop buttons called push buttons are used to start and stop the control contactor system. Again, there are pivot or indicator lamps which are controlled by normally open and normally closed of the auxiliary contacts incorporated to indicate when there is voltage supply to the three phase (3Ø) or single phase (1Ø) or both phases. However, the whole control system is controlled by mechanically pressing the push button ON and OFF when the circuit breaker has been switched ON.
The energy needed for the operation of the control system is three phase and one neutral through the input to produce single and three phase at the output terminal.
Finally the mode of operation is shown on the circuit diagram of the control system.
Organizational report: In chapter, 1 discussed about the background, aim, scope and limitation of the project.
In chapter two, literature review of the project is discussed and elaborated.
In chapter three, the design methodology (design Analysis, investigation and data) is discussed.
In chapter four, construction, testing and packaging is described.
In chapter five, Bill of Engineering measurement and evaluation (BEME) are stated.
In chapter six, this is where the summary, conclusion and recommendation, reference and Appendices are stated.
1.1 AIMS/OBJECTIVE OF THE STUDY
The aims/object of embarking on the project are:
1) To produce a system that will protect electric motor.
2) To design a control system that will start induction machines without causing damage to the equipment.
This material content is developed to serve as a GUIDE for students to conduct academic research
Delivery: Within 24 hours
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN INVESTIGATION INTO THE CONSEQUENCES OF OVER LOADING A TRANSFORMER
AN INVESTIGATION INTO THE CONSEQUENCES OF OVER LOADING A TRANSFORMER CHAPTER ONE INTRODUCTION Background of the study Transformers play a crucial r...More »
Item Type: Project Material | 54 pages | 1,938 engagements |
- 2.
THE ROLE OF ELECTRICITY TARIFF HIKES IN PROMOTING RENEWABLE ENERGY ADOPTION IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the Study Renewable energy is energy derived from natural sources that are replenished at a higher rate than...More »
Item Type: Project Material | 54 pages | 1,454 engagements |
- 3.
AN ASSESMENT OF THE NATIONAL GRID FAILURES AND THE WAY FORWARD
CHAPTER ONE INTRODUCTION 1.1 Background of the study Electricity has become an essential element of contemporary life worldwide, serving various purpo...More »
Item Type: Project Material | 54 pages | 1,587 engagements |
- 4.
IMPACT OF FORMAL EDUCATION ON COMMUNITY DEVELOPMENT IN OREDO LOCAL GOVERNMENT, EDO STATE
ABSTRACT The broad objective of this study is to examine the impact of formal education on community development in Oredo Local Government, Edo State....More »
Item Type: Project Material | 54 pages | 7,116 engagements |
- 5.
CONSTRUCTION OF CRITICAL TEMPERATURE ALARM SYSTEM
ABSTRACT The term “critical point” is sometimes used to denote specifically the vapour liquid critical point of a material. The vapour liquid ...More »
Item Type: Project Material | 46 pages | 13,154 engagements |
- 6.
THE CONSTRUCTION OF LABORATORY EQUIPMENT FOR THE DETERMINATION / INVESTIGATION OF ELECTRICAL INSULAT...
ABSTRACT Insulation deterioration occurs on power system when insulators are subjected to abnormal stresses. Since insulators cannot resist indefinite...More »
Item Type: Project Material | 31 pages | 9,010 engagements |