INVESTIGATING THE PROBLEMS FACING HOUSING SECTOR IN NIGERIA

📄 Item Type: Project Material| 📋 50 pages| 📚 1–5 chapters| Amount: ₦5,000

INVESTIGATING THE PROBLEMS FACING HOUSING SECTOR IN NIGERIA

📄 Project Material 📋 50 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

CHAPTER 1

  INTRODUCTION

1.1 Background of the Study

The dream of each Nigerian citizen is to own his own house (Alhwish, 2010). However, economic Problems began to arise in Nigeria some years ago that have made this dream very difficult to achieve. These problems are complicated, so each specialist in the field of housing and construction holds a unique opinion regarding the main causes of the problems. The main obstacle that consumers face at present is the drastic increase in housing and construction prices in the mega cities of Nigeria. The present study focuses specifically on housing and construction in Abuja.

Nigeria’s main source of revenue is the production of oil. Now that Nigeria’s federal capital territory is receiving a great influx of residents, construction and housing has become the country’s major field in the country’s economy after the oil field Badran (2012).

The growth of this field has come with a sudden rise in the prices of construction and housing, especially in Abuja. This increase has been so problematic that “The prices of construction materials are the next crisis of the Nigerian real estate market” (Alhwish, 2010). The causes of these high prices have yet to be investigated, and they could be numerous and intertwined.

1.2 STATEMENT OF THE PROBLEM

The demand for more construction of all types, coupled with a tight income supply has provided the construction industry with a big challenge to high cost of housing and building construction.This substantial increase has brought disinvestment in the construction industry and  added investment risks. One of the main problems of the construction and housing industry may be attributed to the influence of the country’s main industry, oil. Badran (2012) observed, “Expectations of rising prices of building materials are in line with the rise of oil.” As the oil price increases it creates more problems, and these problems, in turn, increase the construction and housing prices even more. Therefore, the relationship between high oil prices and problems in the housing and construction industry is positive (directly proportional).

Other challenges include the high demand for development of public works projects, such as schools, hospitals, and infrastructure, the high demand for housing and construction by Nigerian citizens, The Low supply of housing (Nigeria economic survey, 2012).The manipulation and monopoly of suppliers of cement, steel and other construction materials, Corruption in monitoring government projects, The existence of a black market ,The high inflation of rate, Contractors who are taking projects beyond their capacity, the Speculative purchase and corruption in selling undeveloped lands.

1.3 AIM AND OBJECTIVES

The aim of this study is investigate on the factor that leads to high cost of housing construction in Nigeria.

The objectives of the study are as follows:

  • To investigate the critical factors that leads to a drastic increase in housing and construction prices in F.C.T Abuja.
  • To determine the problems affecting construction cost in Nigeria.
  • To determine the factors that would help government in addressing the major

1.4 RESEARCH QUESTIONS                      

The following are the research Question that will guide the study:

  • What are the main factors that lead to high cost of housing construction in the Federal capital territory, Abuja?
  • What are the effects of the factors in housing construction industry?

1.5 SCOPE AND LIMITATION OF THE STUDY

The scope of this research is limited to investigation of essential factors that lead to high cost of housing construction and proffering solutions on how to reduce construction cost in Nigeria.

The study is limited to projects in the F.C.T Abuja Nigeria because there is easy access of information in the Abuja by the researcher.

Target respondents for this study are the principal actors in the construction industry namely: the Client, the Consultant and the Contractor.

The present study is about the current situation in Abuja, Nigeria. In addition, the study is focus only on residential buildings (houses and apartments).

1.6 PURPOSE OF THE STUDY

Nigeria suffers from deep problems that underlie housing and construction

Companies, so this thesis aspires to reveal the main hidden factors of these problems. One of the reasons is population growth. Specifically, the average age in Abuja is a mere 18years. Moreover, Nigeria’s population growth rate is 2.90 % (Central Department of Statistics and Information, 2012). Oil prices also seem to be an enormous factor, because a higher oil price will make everything else cost more, such as transportation of personnel, shipping of materials, manufacturing and so on. Another factor is the underlying economic problems, such as inflation. In addition, government projects, such as subsidized schools and hospitals that help to cover the high population growth, seem to be contributing to higher prices. Likewise, a greater number of projects for public works might be another factor.

The aforementioned factors, among others, have led to a 200% increase in the housing construction cost.

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Delivery Within 24 Hours
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project