AN IMPROVED METHOD TO DETERMINE HORIZONTAL WELL PRODUCTIVITY AT STEADY STATE
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 59 pages | 1-5 chapters | Amount: ₦5,000 | 2 orders. | Marked useful: 7,829 times
INSTANT PROJECT MATERIAL DOWNLOADAN IMPROVED METHOD TO DETERMINE HORIZONTAL WELL PRODUCTIVITY AT STEADY STATE
TABLE OF CONTENTS
TITLE PAGE...........................................................................................................I
CERTIFICATION.......................................................................................II
DEDICATION ..........................................................................................III
TABLE OF CONTENT..............................................................................IV
LIST OF TABLES.....................................................................................VII
LIST OF FIGURES...................................................................................VIII
ACKNOWLEDGEMEENT ......................................................................X
ABSTRACT...............................................................................................XI
NOMENCLATURE ..................................................................................XII
CHAPTER ONE
1.1 INTRODUCTION ................................................................................1
1.2 BACKGROUND OF STUDY ………………………………………..3
1.2.1 APPLICATIONS OF HORIZONTAL WELLS……………………4
1.2.2 ADVANTAGES OF HORIZONTAL WELLS.….………………...5
1.2.3 DISADVANTAGES OF HORIZONTAL WELLS……………..…..5
1.2.4 INFLOW PERFORMANCE RELATIONSHIP………………….…5
1.3 PROBLEM STATEMENT……….………………..………………..5
1.4 RESEARCH OBJECTIVE………….……………………………..….6
1.5 RESEARCH QUESTION….…..…………………………...………...6
1.6 JUSTIFICATION OF THIS STUDY……………..………………….7
1.7 SCOPE OF STUDY…………………………………………………..8
1.8 AIMS/OBJECTIVES…………………………………………..........14
CHAPTER TWO…………………………………………………..…………15
2.1 LITERATURE REVIEW…………………….……………………….…15
2.2 PRODUCTIVITY INDEX………………………………………….…...18
2.3 HORIZONTAL WELL PRODUCTIVITY……………………………...19
2.3.1 BORISOV’S MODEL………………………………………...….…….20
2.3.2 GIGER’S MODEL……………………………………………………...21
2.3.3 JOSHI’S MODEL…………………………………………………….22
2.3.4 RENARD AND DUPUY MODEL……………….…………………..23
2.3.5 ELGAGHAD, OSISANYA AND TIAB MODEL……………………..24
2.3.6 BABU AND ODEH (PSEUDO-STEADY STATE) MODEL…………25
CHAPTER THREE…………………………………………….….…………23
3.1 MODEL DESCRIPTION………………………………………..…….…23
3.2 INDIVIDUAL LAYER AND BOUNDARY CHARACTERIZATION…27
CHAPTER FOUR…………………………………………………………....31
4.1 ANALYSIS OF RESULT………………………………………....31
4.2 PERCENTAGE DEVIATION OF RESULTS…………….……...32
4.3 DISCUSSION……………………………………………………..32
CHAPTER FIVE…………………………………………...…………….….55
5.1 CONCLUSION………………………………….………….……55
5.2 RECOMMENDATION………………………………………….73
REFERENCES………………………………….…………………...56
APPENDIX……………………………………….………………....59
LIST OF TABLES
Table 4- SEQ Table \* ARABIC 1: Comparison of Productivity index Result
Table 1A: Variation of Productivity Index with Changing Well Length
Table 1B: Comparison of Vertical and Horizontal Well Productivity at Various Reservoir Thickness
LIST OF FIGURES
Figure1-1: A schematic of a vertical well drilled perpendicular to the bedding plane, and a horizontal well drilled parallel to the bedding plane.
Figure 1-2: Horizontal well following thin bed formation.
Figure 1-3: use of horizontal well to minimize Water and/or Gas coning
Figure 1-4: Intersection of Fractures
Figure SEQ Figure \* ARABIC 1-1: Division of 3D horizontal well problem into 2D problems
Figure 2-2: Transformation of Eclipse into Unit Circle
Figure 2-3: Babu and Odeh Physical Model
Figure 3-1: Reservoir Model with fully penetrating well
Figure 3-2: Model Boundaries conditions
Figure 3-3: Flow Geometry in the Reservoir
Figure 4-1: Plot of Productivity Index against Well Length
Figure 4-2: Plots of Productivity Index against Reservoir Thickness
Figure 4-3: The effect of Reservoir Thickness on Productivity Ratio
NOMENCLATURE
A, drainage area of horizontal well, ft2
a, reservoir width
a = half major axis of drainage ellipse, ft
Bo, oil formation volume factor, rb/STB
b, extension of drainage volume of horizontal well in y-direction,ft
C, unit conversion factor
CH, geometric factor in Babu and Odeh’s model
D, wellbore diameter
h, reservoir thickness, ft
Iani, permeability anisotropy, dimensionless
J, productivity index, STB/day/psi
k, effective permeability, md
kH, horizontal permeability, md
kV, vertical permeability, md
L, horizontal wellbore length, ft
L1/2, half length of horizontal wellbore, ft
p, reservoir pressure, psi
pe, reservoir pressure at boundary, psi
pi, initial pressure, psi
pwf, bottomholeflowing pressure, psi
qo, oil production rate, STB/day
re, radius of outer boundary of the reservoir, ft
rw, wellbore radius, ft
s, skin factor, dimensionless
sR, partial penetration skin factor, dimensionless
Greek symbol
ε, relative pipe roughness
Φ, flow potential
ϕ, porosity
θ,wellbore inclination
µ, viscosity
ρ, density
ABSTRACT
As the petroleum industry continues to experience advances and progress in drilling techniques, the use of horizontal well in field development has been increasing very rapidly throughout the oil industry. It becomes therefore important to adequately determine the performance of horizontal wells.
The existing methods available to determine horizontal well productivity at steady state requires complex mathematical analysis and are difficult to develop. In the course of this work, a new method was developed using simple analytical methods. Results obtained by this new method were compared to that gotten from already established methods of Borisov (1964), Giger (1984) and Joshi (1988). The major objective of this work is to present a simple and effective means to estimate the performance of horizontal wells. An excel sheet was also created in the course of this project to calculate and compare productivity index gotten from the various method. The spread sheet also enable me carry out sensitivity analysis of the results gotten by varying key parameters.
CHAPTER 1
1.1 INTRODUCTION
The major purpose of a horizontal well is to enhance reservoir contact and thereby enhance well productivity. A horizontal well is drilled parallel to the reservoir bedding plane. In other words, a vertical well is drilled perpendicular to the bedding plane (see fig1.1).
Figure 1-1
If the reservoir bedding plane is vertical, then a conventional vertical well will be drilled parallel to the bedding plane and in the theoretical sense it would be horizontal well. The objective here is to intersect multiple pay zones Horizontal wells have become popular for producing oil and gas reservoirs in many regions around the world. The objectives of horizontal wells include increasing oil and gas production, turning a non-commercial oil or gas reservoir into a commercial reservoir and controlling severe coning problems. Due to the fact that horizontal wells can enhance reservoir recovery, they should be taken into consideration when planning a field development. While horizontal wells are generally more expensive to drill than vertical wells, they often reduce the total number of wells required in a reservoir development. As an increasing number of horizontal gas wells are drilled, the need for a quick and reliable method to estimate the pressure-rate behavior of these wells is important to optimize well performance and make operational decisions. A reliable and simple analytical and empirical relationship will provide engineers a technique to assess the performance of horizontal wells prior to undertaking extensive and often time-consuming simulation studies to model the well behavior.
Inflow performance relationship (IPR) is a pressure-rate relationships used to predict performance of oil and gas wells. There is a linear relationship when the reservoir is producing at pressure above bubble point pressure i.e. when Pwf is greater or equal to bubble point pressure. A curve is obtained at Pwf less than bubble point pressure. The linear form of an IPR represents the Productivity Index (PI) which is the inverse of the slope of the IPR. Horizontal oil well IPR also depends on the flow condition that is whether it is transient, steady or pseudo-steady state flow, which is determined by reservoir boundary condition. As the use of horizontal and multilateral wells is increasing in modern exploitation strategies, inflow performance relationships for horizontal wells are needed. The objective of this work is to develop analytical equation and IPRs for horizontal oil wells in steady state conditions that are easy to apply.
1.2 BACKGROUND OF STUDY
Horizontal wells are high-angle wells (with an inclination of generally greater than 85ᵒ) drilled to enhance reservoir performance by placing a long wellbore section within the reservoir. There was relatively little horizontal drilling activity before 1985. A variety of configurations of drilled wells have come to be characterized as horizontal wells or drainholes. Drainholes are short length wellbores drilled pre-existing vertical wells in order to enhance production. These extend between 100 and 500 ft. in either direction. Horizontal wells on the other hand, involve the drilling of new wells and are usually 1000ft or more in length.
The use of horizontal wells to increase the area of contacted reservoir dates back to the early 1940’s. Feasibility of creating such architecture to drain a reservoir better, has been proven for a long time but the economic viability of such a process did not establish itself until recent years. This has been largely due to titanic advances in drilling, surveying and interpretation technologies.
The following are fields around the world that have been successfully drilled and are producing through horizontal wells:
Austin Chalk Formation Texas
Spraberry Tread West Texas
Pearsall Field South Texas
Okoro Oilfield Niger Delta, Nigeria
1.2.1 APPLICATIONS OF HORIZONTAL WELL
Horizontal wells are mostly applied in the following areas;
1. To Exploit Thin Oil and Gas Zone Reservoirs: A horizontal wells reflects an increased area of contact of the well with the reservoir when compare to vertical wells in a thin pay zone. As a result of this increased area of contact, there is an increase in production from horizontal wells.
Figure 1-2: Horizontal well following thin bed formation
2. Reduction of Coning: A horizontal well is expected to have a reduced pressure drawdown when compared to a vertical well for a similar production level. This reduced drawdown pressure is expected to delay the onset of water (gas) breakthrough. Oil recovery is expected to be high except in cases where the well intersects fractures or zones of high permeability which could result in early water (gas) breakthrough.
Figure 1-3: use of horizontal well to minimize Water and/or Gas coning
3. To intersect fracture in a naturally fractured reservoir in order to drain them effectively.
Figure 1-4: Intersection of Fractures
4. In Enhance Oil Recovery (EOR) applications, especially in thermal EOR. Horizontal well provides a large reservoir contact area and therefore enhances injectivity of an injection well. It also helps to increase the sweep efficiency.
1.2.2 ADVANTAGES OF HORIZONTAL WELLS
1. Improved sweep efficiency in pattern flood situations.
2. Reduction in coning. Lower drawdown for the same flow rate as vertical wells, causes stable interface movement delaying the breakthrough of unwanted fluids.
3. Reduced fluid velocities around wellbore thereby reducing the occurrence of turbulent flow.
4. Fewer number of wells is required for field development.
5. Better access to isolated zones and exploiting gravity drainage mechanism effectively.
6. Drilling relief wells for blow out prevention.
7. Accessing untapped portion of a reservoir under constrained drilling conditions (offshore platforms).
1.2.3 DISADVANTAGES OF HORIZONTAL WELLS
1. It is not suitable for thick reservoirs.
2. Completion and Stimulation technology has not been perfected yet.
3. If natural fractures connect the aquifer or gas cap, the breakthrough of unwanted fluids can be accelerated.
4. Not suitable in low vertical permeability situations.
5. Higher cost of drilling per well.
6. Hole problems encountered while drilling can be a serious drawback.
1.2.4 INFLOW PERFORMANCE RELATIONSHIP (IPR)
The relation between production rate (q) and flowing wellbore pressure (pwf) over the practical range of production conditions, this relation is commonly known as inflow performance relationship (IPR). Productivity index is a measure of the ability of a well to produce. It is the ratio of the liquid flow rate to the pressure drawdow
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
THE ACCESSIBILITY OR AVAILABILITY OF SUITABLE MATERIALS IS RESPONSIBLE FOR THE DEVELOPMENT OF CIVILI...
CHAPTER ONEINTRODUCTIONMaterial selection is a step in the process of designing any physical object. In the context of product design, the main goal o...More »
Item Type: Project Material | 78 pages | 7,323 engagements |
- 2.
DESIGN AND MANUFACTURE A NATURAL CONVECTION SOLAR DRYER WHICH REQUIRES LITTLE OR NO MAINTENANCE
CHAPTER ONEINTRODUCTION1.1 BACKGROUND TO THE STUDYDrying is one of the oldest methods of food preservation. For many years, people have been preservin...More »
Item Type: Project Material | 93 pages | 8,949 engagements |
- 3.
DESIGN AND IMPLEMENTATION OF LIGHTING SWITCHING CONTROL SYSTEM INTERFACE
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Traditionally, high control in home and office environments takes place through...More »
Item Type: Project Material | 57 pages | 1 engagements |
- 4.
FACTOR AFFECTING POWER OUTAGE IN NIGERIA
ABSTRACT This research work examines the factors affecting power outage in Nigeria. Constants Power supply is the hallmark of a develop economy. A...More »
Item Type: Project Material | 61 pages | 8,573 engagements |
- 5.
Design And Construction Of An Intelligent 250 Volts Battery Charger With Micro Processor Using Seven...
Design And Construction Of An Intelligent 250 Volts Battery Charger With Micro Processor Using Seven Segment Display TABLE OF CONTENTS Title page �...More »
Item Type: Project Material | 37 pages | 12,067 engagements |