ENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 75 pages | 1-5 chapters | Amount: ₦5,000 | 1 order. | Marked useful: 5,330 times
INSTANT PROJECT MATERIAL DOWNLOADENVIRONMENTAL FACTORS INFLUENCING CONSTRUCTION TIME AND COST OVERRUNS ON HIGH-RISE PROJECT IN NIGERIA
Introduction
Construction time: The Nigerian construction industry contributes less to the country’s economy than do manufacturing or other service industries. Of®cially, construction accounted for only 5.5% of the annual gross domestic product (GDP) in 1993 (Langdon, 1994). However, the growth of the Indonesian construction industry has greatly in¯ uenced the country’s economic development. As de®ned in developed countries (Hillebrandt, 1985), con- struction is considered unique in that it can stimulate the growth of other industrial sectors. Hence to consider growth of the construction industry in terms of its contribution to GDP in isolation is somewhat misleading: that is, to do so understates the crucial role played by construction. Therefore, improving construction ef®- ciency by means of cost-effectiveness and timeliness would certainly contribute to cost savings for the country as a whole. Effort directed to cost and time- effectiveness were associated with managing time and cost, which in this study was approached via investigating time and cost overruns of high-rise construction in Nigeria.
Like developing countries, such as Nigeria (Okpala and Aniekwu, 1988; Elinwa and Buba, 1993;
Mans®eld et al., 1994), Saudi Arabia (Assaf et al., 1995) and Malaysia (Yong, 1988), Indonesia suffers from construction time and cost overruns. The intentions
of this paper therefore are:
1. to identify variables in¯ uencing construction time and cost overruns;
2. to group these variables into factors;
3. to analyse the relationship of these factors and thereby enhance understanding of construction delays and cost overruns. Although the research concentrates on Nigeria, the ®ndings should be relevant to all developing countries, as they face similar problems in terms of time and cost overruns on construction and infrastructural development projects (Morris and Hough, 1987). Construction Management and Economics (1997) 15, 83±94 Factors in¯ uencing construction time and cost overruns on high-rise projects in Nigeria
Causes of time and cost overruns
According to Antill and Wood head (1989), time over runs
(delays) can be divided into three categories:
1. those over which neither party to the contract has any control;
2. those over which the construction owner (or his/her representative) has control;
3. those over which the contractor (or any subcontractor) has control.
It is generally recognized that delays of type 1 are part of the contractor’s normal and legitimate monetary
risk, and hence should give neither party grounds for monetary recompense, but that the contract com- pletion date should be extended in order to protect contractors from liquidated damages claims for late completion. Alternatively, in the extreme a contract may be repudiated due to `frustration’. It is also recog- nized that for delays of type 2 the contractor should receive fair and reasonable recompense (cost and time), whereas for type 3 delays the contractor must bear full responsibility.
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN EXAMINATION ON THE CAUSES AND MANAGEMENT OF FLOOD IN RESIDENTIAL AREAS IN KENYA
CHAPTER ONE INTRODUCTION 1.1 Background of the Study One type of calamity that occurs globally on a variety of scales and in various locations each ye...More »
Item Type: Project Material | 67 pages | 944 engagements |
- 2.
AN INVESTIGATION ON FLOOD OCCURRENCE AND ITS CONSEQUENCES IN NAIROBI, KENYA
CHAPTER ONE INTRODUCTION 1.1 Background of the Study Nairobi, the capital city of Kenya, holds a significant role in the nation's commerce, industry, ...More »
Item Type: Project Material | 55 pages | 786 engagements |
- 3.
AN ASSESSMENT OF PUBLIC PERCEPTION OF FLOOD RISK IN MOMBASA, KENYA
CHAPTER ONE INTRODUCTION 1.1 Background of the Study The increasing frequency of flooding worldwide is attributed to climate change and various human ...More »
Item Type: Project Material | 54 pages | 690 engagements |
- 4.
AN EXAMINATION OF INDIGENOUS METHOD OF CONFLICT MANAGEMENT IN OKABISI, ENUGU STATE
CHAPTER ONE INTRODUCTION Background of Study The destabilising character of community conflict is one of the distinguishing elements of socio...More »
Item Type: Project Material | 57 pages | 1,267 engagements |
- 5.
ANALYSIS OF THE TOILET SYSTEM EFFECT ON THE SANITATION LEVEL IN KPAKUNGU, MINNA NIGER STATE.
CHAPTER ONE INTRODUCTION Background of the Study [Alexandar, 2017] The World Health Organization (WHO) defines sanitation as the provision of facil...More »
Item Type: Project Material | 54 pages | 1,384 engagements |
- 6.
ASSESSMENT ON THE HEALTH IMPLICATION OF FLOOD IN RURAL COMMUNITIES
CHAPTER ONE INTRODUCTION Background of the Study Flood disaster is not a recent phenomenon in Nigeria and its destructive tendencies are some...More »
Item Type: Project Material | 67 pages | 1,397 engagements |