QUANTITATIVE RELATIONSHIP BETWEEN MOTIVATIONAL FACTORS AND WORKERS’ PRODUCTIVITY IN CONSTRUCTION PROJECTS

📄 Item Type: Project Material| 📋 50 pages| 📚 1–5 chapters| Amount: ₦5,000

QUANTITATIVE RELATIONSHIP BETWEEN MOTIVATIONAL FACTORS AND WORKERS’ PRODUCTIVITY IN CONSTRUCTION PROJECTS

📄 Project Material 📋 50 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

ABSTRACT

The research work aimed at explaining vividly the quantitative relationship between motivational factors and workers’ productivity.

It introduces one to what construction projects are about, examines the need, purpose and effects of motivation and the use of incentives in the construction industry. Various works of renowned theorists of motivation had been reviewed in the course of the research.

Productivity as a concept was described in line with the important role motivation plays in enhancing productivity among other factors that may affect productivity. An attempt was also made at examining theoretically and analytically the possible relationship that exists between motivational factors and workers productivity in the construction in industry.

CHAPTER ONE

1.0       INTRDOUCTION

1.1   PREAMBLE

The construction industry, which is responsible for the provision of capital projects, comprising Building and Civil Engineering sub-sectors, contributes enormously to the national economy in form of Gross Domestic Product.       Andawei(2000).                                                          According to Arditi and Mochtar (2000), the output of the construction industry constitutes one-half of the gross capital and is 3-8% of the Gross Domestic Product (GDP) in most countries.

Despite the significant role the industry play in reshaping the  economy and its substantial work force, the performance has not been impressive. This low rating is as a result of the infinitesimal support the sector has received from the Government and the low morale of the construction worker both professional and non-professional alike. Andawei (1997).

It is therefore not only essential but also necessary to energize the teeming construction workers in order to maintain its leading role in both the developed and developing economies.

According to Andawei (2000)Motivation, which is the art of getting people to work willingly and more efficiently, is bound to positively affect the productivity of the work force. Berelson and Stenner (1964) and Flippo (1998) in their separate contributions viewed motivation as a human engineering approach being   triggered by individual needs.

1.2   STATEMENT OF THE PROBLEM

Motivational factors are veritable means of enhancing workers productivity in all fields of endeavour. The construction industry is not an exception. However, the extent of use of these motivation factors in the construction industry is suspect. This study therefore proposes to investigate the quantitative relationship between workers productivity and motivational factors on construction projects.

1.3STATEMENT OF SUB-PROBLEMS

After identifying the main problems, the following sub-problems were derived. To:

a)       Examine the effects of motivation on construction worker’ productivity.

b)      Investigate the motivational factors used in the construction industry.

c)       Determine the success rate(s) of the factors being used.

d)      Find out the problems associated with these factors.

e)       Prefer solutions to the above stated problems.

1.4    PURPOSE/SIGNIFICANCE OF THE STUDY.

The main purpose of this study is to maximize the productivity of construction workers using appropriate motivational factors. The study will therefore be of immense benefit to the contractors, client, the construction industry, and the national economy at large.

The benefits of increased productivity to contractors are as follows.

1.      It ensures stability and continuity of construction projects.

2.      It brings about more profit to the contractor.

3.      It provides overall prosperity and reputation of the construction firm.

4.      Higher productivity provides opportunity for expansion of the construction firm concerned.                

The benefits of increased productivity to construction workers are as follows.

1.      Higher productivity permits more wages

2.      More wages permits better standard of living of workers

3.      More productivity means better working conditions for workers, which also help in maintaining better health of the workers

4.      Higher productivity yields improved morale and greater satisfaction for workers.

The benefits to the nation at large are:

1.      It provides greater national wealth.

2.      It increases per capita income.

3.      It helps expansion of the construction industry.

4.      It improves standard of living.

5.      It helps better utilization of resources of the nation.

6.      Increased productivity provides more satisfaction to consumers.

1.6    AIMS AND OBJECTIVES

1.6.1 Aims:

The study proposes to examine how productivity can be increased through the motivation of construction workers.

1.6.2  OBJECTIVES:

1)      To determine the various motivational factors applicable in the construction industry.

2)      To examine how such motivational factors can be adopted in on-going construction projects.

3)      To determine the extent or level of motivation appropriate to result in increased productivity.

1.5    SCOPE AND DELIMITATION

The study was carried out in Lagos state due to time and cost constraint. Lagos State was chosen because of its political and economic status in Nigeria .In addition, majority of the study population either operate from Lagos or have their head office in Lagos. The study population includes masons, carpenters, electricians etc.

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Delivery Within 24 Hours
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

🏷 Tags: Workers productivity Impact of workers productivity Quantitative relationship Motivational factors Construction projects Relevance of quantitative relationship

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project