iProject

QUANTITATIVE RELATIONSHIP BETWEEN MOTIVATIONAL FACTORS AND WORKERS’ PRODUCTIVITY IN CONSTRUCTION PROJECTS

📄 Project Material📋 50 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

ABSTRACT

 

The research work aimed at explaining vividly the quantitative relationship between motivational factors and workers’ productivity.

 

It introduces one to what construction projects are about, examines the need, purpose and effects of motivation and the use of incentives in the construction industry. Various works of renowned theorists of motivation had been reviewed in the course of the research.

 

Productivity as a concept was described in line with the important role motivation plays in enhancing productivity among other factors that may affect productivity. An attempt was also made at examining theoretically and analytically the possible relationship that exists between motivational factors and workers productivity in the construction in industry.

 

CHAPTER ONE

 

1.0       INTRDOUCTION

1.1   PREAMBLE

The construction industry, which is responsible for the provision of capital projects, comprising Building and Civil Engineering sub-sectors, contributes enormously to the national economy in form of Gross Domestic Product.       Andawei(2000).                                                          According to Arditi and Mochtar (2000), the output of the construction industry constitutes one-half of the gross capital and is 3-8% of the Gross Domestic Product (GDP) in most countries.

 

Despite the significant role the industry play in reshaping the  economy and its substantial work force, the performance has not been impressive. This low rating is as a result of the infinitesimal support the sector has received from the Government and the low morale of the construction worker both professional and non-professional alike. Andawei (1997).

 

It is therefore not only essential but also necessary to energize the teeming construction workers in order to maintain its leading role in both the developed and developing economies.

According to Andawei (2000)Motivation, which is the art of getting people to work willingly and more efficiently, is bound to positively affect the productivity of the work force. Berelson and Stenner (1964) and Flippo (1998) in their separate contributions viewed motivation as a human engineering approach being   triggered by individual needs.

 

1.2   STATEMENT OF THE PROBLEM

Motivational factors are veritable means of enhancing workers productivity in all fields of endeavour. The construction industry is not an exception. However, the extent of use of these motivation factors in the construction industry is suspect. This study therefore proposes to investigate the quantitative relationship between workers productivity and motivational factors on construction projects.

 

1.3       STATEMENT OF SUB-PROBLEMS

After identifying the main problems, the following sub-problems were derived. To:

a)       Examine the effects of motivation on construction worker’ productivity.

b)      Investigate the motivational factors used in the construction industry.

c)       Determine the success rate(s) of the factors being used.

d)      Find out the problems associated with these factors.

e)       Prefer solutions to the above stated problems.

 

1.4    PURPOSE/SIGNIFICANCE OF THE STUDY.

The main purpose of this study is to maximize the productivity of construction workers using appropriate motivational factors. The study will therefore be of immense benefit to the contractors, client, the construction industry, and the national economy at large.

The benefits of increased productivity to contractors are as follows.

1.      It ensures stability and continuity of construction projects.

2.      It brings about more profit to the contractor.

3.      It provides overall prosperity and reputation of the construction firm.

4.      Higher productivity provides opportunity for expansion of the construction firm concerned.                

 

The benefits of increased productivity to construction workers are as follows.

 

1.      Higher productivity permits more wages

2.      More wages permits better standard of living of workers

3.      More productivity means better working conditions for workers, which also help in maintaining better health of the workers

4.      Higher productivity yields improved morale and greater satisfaction for workers.

 

The benefits to the nation at large are:

1.      It provides greater national wealth.

2.      It increases per capita income.

3.      It helps expansion of the construction industry.

4.      It improves standard of living.

5.      It helps better utilization of resources of the nation.

6.      Increased productivity provides more satisfaction to consumers.

 

1.6    AIMS AND OBJECTIVES

1.6.1 Aims:

The study proposes to examine how productivity can be increased through the motivation of construction workers.

 

1.6.2  OBJECTIVES:

1)      To determine the various motivational factors applicable in the construction industry.

2)      To examine how such motivational factors can be adopted in on-going construction projects.

3)      To determine the extent or level of motivation appropriate to result in increased productivity.

 

1.5    SCOPE AND DELIMITATION

The study was carried out in Lagos state due to time and cost constraint. Lagos State was chosen because of its political and economic status in Nigeria .In addition, majority of the study population either operate from Lagos or have their head office in Lagos. The study population includes masons, carpenters, electricians etc.

 

 

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Business Admin. and Management Final Year Research Project Topics & Materials »

🏷 Tags:Workers productivityImpact of workers productivityQuantitative relationshipMotivational factorsConstruction projectsRelevance of quantitative relationship

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us