THE IMPLICATION AND BENEFIT OF THE USE OF SOFTWARES IN BUILDING PROJECT CONSTRUCTION
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 50 pages | 1-5 chapters | Amount: ₦3,000 | 7 orders. | Marked useful: 4,422 times
INSTANT PROJECT MATERIAL DOWNLOADAbstract
Software is any set of machine-readable instruction that directs a computer processor to perform specific operations. Microsoft project software (MS Project) is one of such software that is a program developed and sold by Microsoft which is designed to assist a project manager in developing a plan, assigning resources to task tracking work progress, managing the budget ,analyzing work load schedule, upgrade information and communication status in building project construction. Although this software use in our country Nigeria is still little but for those firms project Team/manager who uses it have seen it important to the project (building project). Microsoft project offers easy productivity in building project construction like WBS, outline tasks assign resources/cost, tracking and reporting, collaborating information with project managers if any. Every about scheduling and management of building project are in place in this software and it allows one to choose from different alternative view point (Garth chart, Bar chart, pert and network diagram etc) it also help users “project team” to reselect, remove, correct and upgrade current or future information if any. Most managers or users are ignorant of what ms project does, it will be difficult for them to know its functions and understand them. Due to the fact our country Nigeria lags behind in meeting up with the standard of the world globalization system technology.
Tags: Implication of software Benefit of software Use of software Building project construction Evaluation of building project construction Assessment of building project construction
This material content is developed to serve as a GUIDE for students to conduct academic research
Get Complete Project Material File(s) Now! »
DOWNLOAD THIS PROJECT MATERIAL NOW!Advertise Here
Not what you were looking for? Perform a search
Comment on Facebook:
Related Project Materials
- 1.
ASSESSING THE PERCEPTION OF QUANTITY SURVEYOR ON ADOPTION OF E-PROCUREMENT TO MITIGATE CORRUPT PRACT...
ABSTRACT This study was carried out to to assess the perception of quantity surveyors on adoption of E procurement to mitigate corrupt practices in pu...More »
Item Type: Project Material | 65 pages | 2,807 engagements |
- 2.
THE IMPACT OF MANAGEMENT CHALLENGES ON THE PRODUCTIVITY OF INTERGRATED BUILDING TECHNOLOGY AND SERVI...
CHAPTER ONE INTRODUCTION 1.1 BACK GROUND OF THE STUDY Modern man’s aims and aspirations call for unprecedented co operative eff...More »
Item Type: Project Material | 50 pages | 5,263 engagements |
- 3.
MAKING HIGH CONCRETE STRENGTH FROM GRANULATED CALCINED CLAY
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Cement is a significant source of anthropogenic release of c...More »
Item Type: Project Material | 50 pages | 4,157 engagements |
- 4.
APPRAISAL OF BUILDING MAINTENANCE PRACTICE AMONG LANDLORDS
Abstract The study is appraisal of building maintenance practice among landlords in Niger central senatorial zone of Niger state. The specific purp...More »
Item Type: Project Material | 50 pages | 5,065 engagements |
- 5.
STRATEGIES FOR CONTROLLING CRACKS IN RESIDENTIAL BUILDINGS
Abstract The study was designed to find out strategies for controlling cracks in residential building, in Niger south senatorial district. Among...More »
Item Type: Project Material | 50 pages | 7,529 engagements |
- 6.
ANALYSIS OF FACTORS INFLUENCING MATERIAL WASTAGE ON BUILDING SITE IN NIGERIA
ABSTRACT The study was carried to critically investigate the analysis of factors influencing material wastage on building sites in Kaduna State....More »
Item Type: Project Material | 50 pages | 5,100 engagements |