iProject

THE IMPACT OF MANAGEMENT CHALLENGES ON THE PRODUCTIVITY OF INTERGRATED BUILDING TECHNOLOGY AND SERVICES

📄 Project Material📋 50 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

 

CHAPTER ONE

 

INTRODUCTION

 

1.1    BACK GROUND OF THE STUDY

 

 

Modern man’s aims and aspirations call for unprecedented co-operative effort out capacity to build the slimes to criminate pollution, to give individuals an opportunity for self expression to raise the standard of living, and to achieve our many other social and personal objectives rest on joint activity if individuals or eventribes attempt to be self sufficient producing their own food, clothing and shelter subsistence is a meager at best. But when men join together in various enterprises, pooling their resources and exchanging their outputs with many other people or enterprises, the grap the means to flourish.

 

The job of management is to make such cooperatives endeavours function properly. Managers are needed to convert disorganized resources of men, machines, and money into useful enterprises can render mobilize the required means of production, and the outside would, and inspire people associated with the enterprise to work toward the common objective. The fact the government of Nigeria can not provide employment to its citizens makes it necessary for many people to come up with the idea of being self employed.

 

This trend is a welcome development in Nigeria considering the level of our population. Integrated building product and service limit Liability Company in 1988 with a 100% Nigeria participation. At inception it had a normal share capital of N 1000,000.00 (one million naira) the company was set up basically to produce building product and services that with industrialize the nation and create employment opportunity. The setting of the company in Kaduna was based on the need to establish it new Abuja the federal capital where lot of construction is going on. Beside for a growing the initial cash of setting up in Abuja was on  high side.

 

Kaduna right now is live a satellite town for many resident of Abuja especially those in the building industry and so marketing the organization product was done during the weekend when the professionals who serve as a link between the prospective client of the organization are around.

 

The organization started full operation in 1989 with an office accommodation on Ahmadu Bello way a factory accommodation in Sabo a suburb in Kaduna, three official car twelve permanent staff (which includes four management staff) and about thirty contract staff. The company act inception had an installed capacity to produce 160 windows and 78 doors in a week. The staff strength has also grown the 47 permanent staff and over 500 contract staff, the organization has also gone into consultancy construction (renovation, remodeling) wood and mental fabrication.

 

The product ranges of the organization are:

 

Integrated sliding windows

 

Integrated projected windows

 

Integrated sliding doors

 

Integrated curtain willing system

 

Integrated rooting system

 

Integrated sky lighting

 

Wood work and mental construction.

 

1.2  STATEMENT OF THE PROBLEM

 

Many organizations are faced with management challenges especially small and medium scale enterprises. These challenges are both form within and outside the organization. These are some of the problems to assume.

 

1.   People refuse to recognized such enterprises by not patronizing their product not because they are of less quality but because they are made by small or medium scale enterprises, considering brand names, and unacceptability of  the product in large market etc.

 

2.   The financial institutions are very weak in assisting small and medium scale enterprise challenges of  running the business.

 

1.3   OBJECTIVES OF THE STUDY

 

The researcher decided to write on this topic so as to determine particular problems facing productivity of integrated Building Technology and services limited.

 

Another objective is to determine various ways through which these challenges can be faced and checked.

 

Finally to recommend at the end of the study the best way to counter such challenges.

 

1.4   SIGNIFICANCE OF THE STUDY

 

The researcher decided to write on the subject because of its importance to the over all objectives of organizations, especially productivity of integrated Building technology and services Ltd particularly. Those ones that aims at encouraging the owners of such business not to relent.

 

 

 

 

 

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Building Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us