Home » Building » MULTI-PARAMETER OPTIMIZATION OF COST ENTROPY FOR REINFORCED CONCRETE OFFICE BUIL...

MULTI-PARAMETER OPTIMIZATION OF COST ENTROPY FOR REINFORCED CONCRETE OFFICE BUILDING PROJECTS USING ANT COLONY OPTIMIZATION

Sold By: Joe Project Store | Item Type: Project Material | Report this?  |  Attributes: 50 pages | 1-5 chapters | Amount: ₦5,000 | Marked useful: 5,069 times

Delivery: Within 24 hours

CHAPTER ONE:
1.0 INTRODUCTION

1.1 Background of the study
1.2 Statement of the problem
1.3 Statement of the objectives
1.4 Research questions
1.5 Research hypotheses
1.6 Significance of the study
1.7 Scope of the study
1.8 Limitations of the study
1.9 Definition of terms

CHAPTER TWO:
2.0 REVIEW OF RELATED LITERATURE

2.1 Concept of internal control
2.2 Factors that characterize effective internal control
2.3 Classes of internal control
2.4 Limitations of internal control
2.5 Evaluations of internal control
2.6 Internal control and the auditor
2.7 Public accountability
2.8 Historical overview of the case study
2.9 Internal control and accountability

CHAPTER THREE:
3.0 RESEARCH METHODOLOGY

3.1 Research design
3.2 Sources of data
3.3 Area of study
3.4 Population of the study
3.5 Determination of sample size
3.6 Reliability of the instrument
3.7 Validity of the instrument
3.8 Method of data analysis

CHAPTER FOUR:
4.0 PRESENTATION OF DATA

4.1 Presentation of data
4.2 Test of hypotheses

CHAPTER FIVE:
5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS

5.1 Summary of findings
5.2 Conclusions
5.3 Recommendations
Bibliography


This material content is developed to serve as a GUIDE for students to conduct academic research



Delivery: Within 24 hours

Advertise Here

For advertisement, call 08168958821

Not what you were looking for? Perform a search

What's your project topic?


Comment on Facebook: