MODELLING OF COST OVERRUNS IN BUILDING PROJECTS

๐Ÿ“„ Project Material๐Ÿ“‹ 65 pages๐Ÿ“š Chapters 1โ€“5๐Ÿ’พ MS-Word & PDF

Chapters 1โ€“5 ย |ย  โ‚ฆ5,000

Download Complete Project Now

ABSTRACT

Construction of building projects is an endeavour that involves capital expenditure, which is either borrowed or self-financed by clients. The expected outcome of such expenditure is value for money, which is usually dictated by project objectives of cost, time and quality. Project cost, as a project objective, is a crucial determinant of project success in the prevailing economic challenges being experienced globally. Construction cost overrun has become a reoccurring phenomenon in the delivery of building projects. The major thrust of this study was to identify, analyse and model the factors that contribute to building construction cost overruns in Abuja. The study adopted a Monte-Carlo technique in simulating cost overrun using DiscoverSimยฎ version 1.1 (SigmaXL, 2013) simulation and RiskAmp Microsoft Excel add-in software to analyse data obtained from literature review, review of project documents with contract sum of over Five Million Naira executed within Abuja city in addition to interview sessions with construction professionals. The study revealed that significant cost overruns are mainly due to re-measurement and variation. The simulation result elucidated that less than 10% of building projects are completed below the initial contract sum in Abuja which could be due to the fact that projects tend to be initiated and executed without adequate project information such as client brief, design details and specifications. The study recommends the need for minimizing occurrence of re-measurement in building projects through provision of full design information prior to contract award, development of simulation model for specific project categories and establishment of a project cost overrun band that will enable a scientific measurement of projectโ€™s value for money benchmarked against initial cost estimate.

INTRODUCTION

Globally, the construction sector is inundated with cost overruns in the delivery of building projects. This experience has brought about loss of clientsโ€™ confidence in consultants, added investment risks, lack of ability to deliver value to clients, and disinvestment in the construction industry (Mbachu and Nkado, 2004).It is of essence that the objectives of a building contract are met to the contentment of the parties involved. Cost, time and quality are significant, interrelated and interdependent targets for achieving the objectives/goals expected of building contracts (Ashworth, 1999, Gould, 2002). Thus, it is crucial to keep up a proper balance between the three so that project outputs are realised on time, within the financial plan and with the requisite quality (Akinsola and Potts, 1998). However, it is an admitted fact that in Nigeria, the majority of contracts suffer undue time extensions and /or additional cost to the client and /or inadequate quality of work (Oluwole, 2008b).

Project cost overruns can be either avoidable or unavoidable. Overruns due to design plan or project management problems are avoidable because they could have reasonably been foreseen and prevented (Shanmugam et al., 2006). However, there are some unavoidable costs such as those due to unanticipated events which cannot reasonably be prevented. Cost overruns may add value to projects when extra work is done with the intention of producing a better output. Overruns may also add value when they involve work that was omitted from design plans but clearly needed to be done. However, some overruns may not add value and represent wasted money if they do not result in a better product.

Cost overrun of a project refers to the actual โ€˜cost increaseโ€™ to the client during construction of a building project (Janaka, 1992). It is merely the difference between the value originally envisaged for the project and the value reflected in the final certificate. Cost overruns occur from overspending the allowances, making changes and encountering unforeseen problems. Proper planning can greatly reduce cost overruns.

This Project is for You If:

Yes, This Is My Situation โ€” Send Me the Complete Material

Here's everything you get with the complete project package:

โœ”Chapters 1โ€“5 (Word & PDF)
โœ”Abstract & Table of Contents
โœ”References, Citation & Bibliography
โœ”Fully Editable Microsoft Word Format
โœ”Original, Plagiarism-Free Content
โœ”Instant Email Delivery
Complete package โ€”โ‚ฆ10,000โ‚ฆ5,000
Price may return to โ‚ฆ10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
Iโ€™ve Seen Enough โ€” Get Me This Project Material

What Other Students Are Saying

โ€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.โ€
Zina
Kenpoly
โ€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.โ€
Favour
Nekede
โ€œMy supervisor almost finished me ๐Ÿ˜ญ He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.โ€
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Building Final Year Research Project Topics & Materials ยป

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered โ€” Download the Complete Project
Message us