Home » Building » AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBL...
AN EVALUATION OF HOUSING AFFORDABILITY FOR NIGER STATE CIVIL SERVANTS UNDER PUBLIC-PRIVATE PARTNERSHIP (PPP) HOUSING DEVELOPMENT
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | Marked useful: 5,034 times
INSTANT PROJECT MATERIAL DOWNLOADABSTRACT
Niger state government achievement in Public housing delivery for its citizen since its creation in 1976 has been very minimal–with just 3,000 houses provided for a population of 3,954,772 so far. Changing its delivery strategy from being the sole provider of housing, the government in 2007 opted for a new strategy of Public-Private Partnership (PPP) which was to provide affordable housing for all workers under a private sector driven mechanism. Since 2007, some houses have so far been allocated to the planned beneficiaries–mostly state civil servants. However, the challenge has been to ascertain how affordable the provided houses were to the state civil servants who are earning various salaries within the state‟s wage system. The study conducted affordability analysis of the housing products for the various levels of civil servants allotees. Data used for the analysis were sourced from the project record files, government approved wage table and a questionnaire survey. The purposive sampling technique was employed in administering the questionnaire to a sample of 187 beneficiaries. The analysis revealed that applying the standard housing affordability yardstick of not more than 30 percent of gross household income, only civil servant allotees from level 10 to 16 can afford the 2-bedroom housing at a total cost of N1.9M and a monthly repayment amount of N10,000.00 while 3-bedroom houses were not affordable to any of the allotees at a total cost of N2.9M and a monthly repayment amount of N19,000.00.This probably explains why 44 percent were partially satisfied while 68 percent respondents stated that their dissatisfaction was due to the monthly repayment amount. The study by way of sensitivity analysis was able to recommend that if the cost of 2-bedroom house is reduced to N1.2M and mortgage repayment interest rate reduced to 3 percent for an extended period of 25 years every workers from level 1 to 16 could afford the houses in such modified scheme.
CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
Housing is an integral element of a nation‟s economy and its backward and forward linkages with other parts of the economy closely bond people‟s needs, demands and social processes. These linkages allow housing to act as an important engine for sustainable development and poverty reduction in both society and the economy, and without a functioning housing sector, urban centers cannot be established or developed. A functioning housing sector offers appropriate, affordable housing and sustainable patterns of urbanization which are critical for the future of our ever-urbanizing planet (Arias, 1993).
Public housing delivery for civil servants in Niger State started after the creation of the State in 1976 when some government quarters were constructed under the supervision of Niger State Ministry of Works, Transport and Housing. Later, Niger State Housing Corporation was created in 1979 for housing delivery in the state. However, between 1976 and 2007 less than 3,000 houses were developed by the public sector. Niger State Evolving Strategy for Sustainable Housing (NSESSH, 2007).
In order to improve on this, the government of Niger State in 2007 embraced the Public Private Partnership (PPP) as an alternative strategy for her housing delivery. This was a position response to the 2nd United Nation (UN) Conference on Human settlement (HABITAT II) in Istanbul, in June, 1996 which advocated the effective and affordable mass housing delivery through Public-Private Partnership (NSESSH, 2007).
This material content is developed to serve as a GUIDE for students to conduct academic research
Find What You Want By Category:
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
For advertisement, call 08168958821
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
AN EXAMINATION OF HEAVY DOWNPOUR AS A CAUSE OF BUILDING COLLAPSE IN LAGOS STATE (MUSHIN INCIDENCE, 2...
CHAPTER ONE INTRODUCTION Background of the Study Over the past few years, Nigeria has experienced a significant increase in construction failures, lea...More »
Item Type: Project Material | 54 pages | 793 engagements |
- 2.
FACTORS AFFECTING THE COMPETENCE AND PROJECT DELIVERY OF SMALL INDEGENIOUS CONSTRUCTION FIRMS
CHAPTER ONE INTRODUCTION 1.1 Background Of Study Building construction is the process of assembling materials to form a building; it is generally p...More »
Item Type: Project Material | 54 pages | 1,848 engagements |
- 3.
AN INVESTIGATION INTO THE CAUSES AND ENVIRONMENTAL EFFECT OF FIRE OUTBREAK IN NIGERIA
. CHAPTER ONE INTRODUCTION Background of the study From the earliest period, the fire that allowed man to prepare food, fight off predators, forge ...More »
Item Type: Project Material | 54 pages | 2,497 engagements |
- 4.
ANALYSIS ON THE SAFETY AND MANAGEMENT METHOD OF FIRE FIGHTERS IN MANAGING FIRE OUTBREAK IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the study There is a significant danger posed to people, animals, and even property by fires that originate ...More »
Item Type: Project Material | 57 pages | 2,229 engagements |
- 5.
A CRITICAL INVESTIGATION ON SAFETY PRACTICE AMONG CONSTRUCTION BASED COMPANIES IN KANO STATE
ABSTRACT This study was carried out to investigate on safety practice among construction based companies using Dantata & Sawoe Construction Compan...More »
Item Type: Project Material | 63 pages | 2,380 engagements |
- 6.
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY-CONTRACTORS’...
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY CONTRACTORS’ PERSPECTIVE IN AKWA IBOM STATE CHAPTER ONE INT...More »
Item Type: Project Material | 60 pages | 3,124 engagements |