Home » Building » AN APPRAISAL OF CONSTRUCTION PROJECT PLANNING IN NIGERIAN INDIGENOUS CONSTRUCTIO...
AN APPRAISAL OF CONSTRUCTION PROJECT PLANNING IN NIGERIAN INDIGENOUS CONSTRUCTION COMPANIES
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | Marked useful: 4,908 times
Delivery: Within 24 hoursABSTRACT
Planning in construction involve defining the activities, actions, time, cost, durations and performance milestone which will result into successful completion of the project. Previous researches attributed insufficient construction planning to Nigerian indigenous construction companies, this insufficiency in construction planning was found to contribute to their low productivity, profitability, time overrun and cost overrun. This study was carried out to assess construction project planning of indigenous contractors with a view to enhance their performance. The objectives of the research were to assess contractors’ perception of construction project planning, articulation of contractors’ current method of construction project planning and assessing the efficiency of each contractor’s method of planning construction projects. The methodology of the research involve use of purposive sampling technique, sample size of 50 companies was determined using 90% confidence level from a population size of 1920 calculated with sample size table and formula. Questionnaire was self-administered to respondents, questionnaire (A) was administered to project managers of the organizations which contains questions that aim at assessing how organizations plan and what planning entails in their organizations, this questionnaire record 83% response rate. Questionnaire (B) was administered to professionals in the organizations who manage construction on site, questionnaire (B) aim at assessing the effectiveness of construction planning, problems associated with construction planning and how to improve construction planning, questionnaire (B) records 88% response rate. Questionnaires were analyzed and results was presented in tables and bar charts. Findings from the research revealed that construction project planning is insufficient and requires improvement. Cost overrun, time overrun, poor scope control and reduction in profit are problems experienced by contractors. The failure of construction project planning was attributed to client unethical dealings, lack of integrity in financial dealings of client and poor communication among project members. In order to improve planning of construction project, the research recommends contractors to perform financial and ethical check on client, employ distinct project manager to each project, employ the use of computerised systems and experience in planning construction projects. The research also recommend contractors to improve communication among project team through establishment of reliable and accessible communication channel.
CHAPTER ONE
1.0 INTRODUCTION
1.1 Background of the Study
The guide to the Project Management Body of Knowledge PM BOK (2004) defined project to be a temporary human effort which has definite start and finishing date and also has clear objectives. Henry (2006) identified project to be made up of group of interrelated activities constrained by specific scope, budget and time to deliver specified product or service. Example of projects are construction of a house, building a software and accomplishing a space mission. Hence, a project is characterized by time, scope and objectives.
Construction activities also shares features of a project, this is because construction involve transforming raw materials, finished or semi-finished goods using management, manpower and technology with in an agreed specification of time, quality into a facility. Abimbola (2013) defined construction as series of actions undertaken by an entity which produce, modify or altar building or infrastructure.
Regardless of the nomenclature, every project involve accomplishment of distinct or interconnected stages, these stages are conceptualization, planning execution and completion, and they are termed the project life cycle. For a project to be successful, every aspect of it needs to be prepared or planned. Project planning was defined by PM BOK (2000) as that stage of a project which identify the project activities and how each of the activities will be accomplished. The purpose of planning project is to identify each major task, estimate time and resources required, and provide a frame work for management or owners to review and control its progress.
This material content is developed to serve as a GUIDE for students to conduct academic research
Find What You Want By Category:
Delivery: Within 24 hours
Advertise Here
For advertisement, call 08168958821
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
FACTORS AFFECTING THE COMPETENCE AND PROJECT DELIVERY OF SMALL INDEGENIOUS CONSTRUCTION FIRMS
CHAPTER ONE INTRODUCTION 1.1 Background Of Study Building construction is the process of assembling materials to form a building; it is generally p...More »
Item Type: Project Material | 54 pages | 737 engagements |
- 2.
AN INVESTIGATION INTO THE CAUSES AND ENVIRONMENTAL EFFECT OF FIRE OUTBREAK IN NIGERIA
. CHAPTER ONE INTRODUCTION Background of the study From the earliest period, the fire that allowed man to prepare food, fight off predators, forge ...More »
Item Type: Project Material | 54 pages | 1,301 engagements |
- 3.
ANALYSIS ON THE SAFETY AND MANAGEMENT METHOD OF FIRE FIGHTERS IN MANAGING FIRE OUTBREAK IN NIGERIA
CHAPTER ONE INTRODUCTION Background of the study There is a significant danger posed to people, animals, and even property by fires that originate ...More »
Item Type: Project Material | 57 pages | 1,109 engagements |
- 4.
A CRITICAL INVESTIGATION ON SAFETY PRACTICE AMONG CONSTRUCTION BASED COMPANIES IN KANO STATE
ABSTRACT This study was carried out to investigate on safety practice among construction based companies using Dantata & Sawoe Construction Compan...More »
Item Type: Project Material | 63 pages | 1,234 engagements |
- 5.
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY-CONTRACTORS’...
AN INVESTIGATION OF LATE AND NON PAYMENT ISSUES IN THE NIGERIAN CONSTRUCTION INDUSTRY CONTRACTORS’ PERSPECTIVE IN AKWA IBOM STATE CHAPTER ONE INT...More »
Item Type: Project Material | 60 pages | 2,005 engagements |
- 6.
ASSESSING THE PERCEPTION OF QUANTITY SURVEYOR ON ADOPTION OF E-PROCUREMENT TO MITIGATE CORRUPT PRACT...
ABSTRACT This study was carried out to to assess the perception of quantity surveyors on adoption of E procurement to mitigate corrupt practices in pu...More »
Item Type: Project Material | 65 pages | 6,076 engagements |