iProject

ROUTE SURVEY OF ROAD AND PAVEMENT DESIGN (REHABILITATION/MODERNIZATION)

๐Ÿ“„ Project Material๐Ÿ“‹ 65 pages๐Ÿ“š Chapters 1โ€“5๐Ÿ’พ MS-Word & PDF

Chapters 1โ€“5 ย |ย  โ‚ฆ5,000

Download Complete Project Now
ABSTRACT

The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions.
The need for easing the flow of traffic on this access road shall rise, since it s a commercial center in the institution. It is required that the toad be revamped and generally upgraded. The existing road is no longer in peak condition and a result of traffic growth.
The study modification therefore involves the assessment of the roads present condition, involving carrying out side test, and surveys etc, as to what could be done and how best to enhance traffic flow.

TABLE CONTENTS

Certification
Dedication 
Abstract
Acknowledgement
Table of content

CHAPTER ONE

General introduction
Design application
Aim and objective
Advantages of road
Reconnaissance survey
Route survey

CHAPTER TWO
Theodolite transversing of the road control
Importance of theodoversing 
Equipment used on traversing
Procedure
Conversion of angles to bearing  (whole area bearing
Rectangular co-ordinate

CHAPTER THREE
Field leveling work general survey
Need for preliminary survey leveling work
Technical term used in leveling 
Aim
Application of leveling
Instrument in leveling’
Operation condition’’
Leveling of the road
Reduction of filed data
Brief description on profile and cross sectional leveling
Uses of profile plot
Leveling tabulating
Earth work computation

CHAPTER FOUR
Soil identification/laboratory test
Soil identification
Laboratory test performed in soil
Test to be carried out
Soil sampling
Sieve/particles size analysis
Aim and scope
Material and equipment
Test producers
Constancy limits
Liquid limit of soil
Objective and scope
Material and  equipment
Test procedure
Plasticity index
Soil classification based in plasticity
Significance fo the study
Compaction
Objective and scope
Materials and equipment
Test procedure
California bearing ratio (cbr)
Objective scope
Material and equipment
Test procedure
Borrow materials for sub-base
Laboratory test on the borrowed materials
Cbr rating
Tabulation for mechanical analysis

CHAPTER FIVE
Design vehicles
Design speed 
Highway capacity
Deign guide
Design period
Basic design element horizontal alignment
Vertical alignment
Vertical curvature
Standard for grade
Co-ordination of vertical and horizontal alignment
Deign of curves
Pavement layers
Pavement design
Design facts the engineer should know for design 
Preparation
Pavement widening
Pavement material
Component pavement and their functions
Design of road pavement
Calculation of cbr value
Vertical and horizontal curve design
Design procedure
Services life of pavement
Drainage design
Basic policy on drainage design
Road side drainage channels
Erosion protection
Conclusion and recommendation
Reference

This Project is for You If:

Yes, This Is My Situation โ€” Send Me the Complete Material

Here's everything you get with the complete project package:

โœ”Chapters 1โ€“5 (Word & PDF)
โœ”Abstract & Table of Contents
โœ”References, Citation & Bibliography
โœ”Fully Editable Microsoft Word Format
โœ”Original, Plagiarism-Free Content
โœ”Instant Email Delivery
Complete package โ€”โ‚ฆ10,000โ‚ฆ5,000
Price may return to โ‚ฆ10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
Iโ€™ve Seen Enough โ€” Get Me This Project Material

What Other Students Are Saying

โ€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.โ€
Zina
Kenpoly
โ€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.โ€
Favour
Nekede
โ€œMy supervisor almost finished me ๐Ÿ˜ญ He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.โ€
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Civil Engineering Final Year Research Project Topics & Materials ยป

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered โ€” Download the Complete Project
Message us