CHAPTER ONE
1.0 INTRODUCTION
The construction of structure on weak ground often requires the soil to be improved in order to ensure the safety and the stability of surrounding buildings. The ground improvement in granular soils can be achieved by different methods such as vibro-floatation, compaction piles, and compaction with explosives, excavation and replacement, grouting e.t.c. The selective of the most suitable method depend on a variety of factors, such as: soil conditions, required degree of compaction, types of structure to be supported, as well as site specific considerations available time for completion of the project, availability of equipment and materials e.t.c. Soil compaction can offer effective solutions for many foundation problems and his especially useful for reducing total settlement in sand. Sandy soil means most of the soil particles are bigger than 2mm in diameter. It gives good water drainage and has a low capacity to hold nutrients. Sandy soil does not hold moisture very well. It is granular and consists of rock and mineral particle that are very small. Therefore, the texture is gritty and is formed by the disintegration and weathering of rocks such as limestone, granite, quartz and shale. Is also easier to cultivate it if it is rich in organic materials but then it allows drainage more than needed. This results in over drainage and dehydration of the plant in summer. It warms very fast in the spring season. Grouting on the other hand is a process whereby stabilizes either in the form of suspension or solution is injected into sub surface soil. Sandy soil is the largest particle in the soil when you rub it, if feels rough. This is because it has sharp edges and it does not hold many nutrients.
1.1 HISTORICAL BACKGROUND OF GROUTING
The development and history of compaction grouting over the last 30-40 years as been established by many distinguished researcher, design engineer and design contractor. Many technical papers are been published dealing physically with the issues surround compaction grouting design such as: “compaction grouting, 1973”, “planning and performing compaction grouting” 1974. These and other important reference are the main stream basis of knowledge for the highly specialize engineering and construction technique know as compaction grouting. The compaction grout method as some unique features which allow distinct advantages over other remedial method of geo-technical construction. In many distances growth is the only viable solution. Some of the advantages include: Economic: Many time compaction grouting is the only feasible solution to foundation settlement problems, other than demolishing the structure and re-building with expensive deep foundation technique. Minimal disturbance: During the grouting operation, destructure may remain occupied and in service. Minimal risk: Compaction grouting offers minimal risk of catastrophic structural failure while re-leveling structure. Other are: Minimal geotechnical exploration, provide greater support for structures, cost factor e.t.c.
1.2 AIM AND OBJECTIVE
1. To determine the nature of the sandy soil particles.
2. To determine the degree of the sandy soil compatibility.
3. To carry out the improvement of sandy soil through grouting.
4. To carryout some laboratory test on sandy soil such as compaction test California bearing ration (CBR) test, atterberg LIMIT test, liquid limit test, Plastic limit test, sieve analysis test in comparing the effectiveness of grouting system.
1.3 SCOPE OF THE STUDY This research is focused on the quality and improvement of bearing capacity of sandy soil by grouting.
1.4 LIMITATIONS OF THE STUDY The limitations of this study are:
TIME FACTOR: Limited time that does not permit to carryout many practical.
AREA OF STUDY: This project is limited the technical study of sandy soil properties.
IMPROVEMENT OF BEARING CAPACITY OF SANDY SOIL BY GROUTING
Chapters 1–5 | ₦5,000
Download Complete Project NowThis Project is for You If:
- You are writing your final year project for the first time and don't want to make costly mistakes
- This is your exact topic, or very close to what your supervisor gave you
- Your supervisor has rejected one or more chapters and you don't know what to fix
- You are stuck on Chapter 3 or data analysis and nothing is making sense
- Your deadline is close and you are still far behind
- You can't find enough materials anywhere for your topic
Here's everything you get with the complete project package:
See Our Conversations With Students on WhatsApp
Students sharing their experience after using our service





What Other Students Are Saying
Can't find what you're looking for?
Search thousands of project topics across every department.
Related Project Materials
COMPARATIVE ANALYSIS OF THE STRENGTH OF CONCRETES MADE FROM VARIOUS AGGREGATE
COMPARATIVE ANALYSIS OF THE STRENGTH OF CONCRETE MADE FROM VARIOUS AGGREGATE CHAPTER ONE INTRODUCTION This work was to present in one weight, the fundamental and practical informat…
📄 Project Material📋 52 pages👁 12,574 viewsBUILDING COST MANAGEMENTS
CHAPTER ONE INTRODUCTION 1.1 Background to the Study Approaches to the total cost management of construction works are now changing rapidly. The change imposes the necessity to cha…
📄 Project Material📋 53 pages👁 12,272 viewsAWARENESS AND PRACTICES OF GREEN CONSTRUCTION
AWARENESS AND PRACTICE OF GREEN CONSTRUCTION CHAPTER ONE INTRODUCTION 1.1 Background to study. Green or Sustainable buildings are the future and will over the next few decades be m…
📄 Project Material📋 60 pages👁 11,917 viewsEFFECT OF THE USE OF SUB-STANDARD MATERIALS ON BUILDING CONSTRUCTION (CASE STUDY OF MINISTRY OF HOUSING, LAGOS STATE)
EFFECT OF THE USE OF SUB STANDARD MATERIALS ON BUILDING CONSTRUCTION (CASE STUDY OF MINISTRY OF HOUSING, LAGOS STATE) CHAPTER ONE INTRODUCTION 1.1 Background of the study Buildings…
📄 Project Material📋 53 pages👁 14,323 viewsBUILDING COLLAPSE : A CHALLENGE FOR THE REAL ESTATE INDUSTRY AND CONSTRUCTION COMPANIES IN NIGERIA
CHAPTER ONE INTRODUCTION 1.1 Background of the study Incidences of the fall of buildings in Nigeria are posing major concerns and challenge to all the players in the construction i…
📄 Project Material📋 53 pages👁 11,638 views