iProject

EVALUATION OF SAW DUST ASH AS MINERAL FILLER IN ASPHALT MIXTURE

πŸ“„ Project MaterialπŸ“‹ 65 pagesπŸ“š Chapters 1–5πŸ’Ύ MS-Word & PDF

Chapters 1–5 Β |Β  ₦5,000

Download Complete Project Now
ABSTRACT
Β 
The quest for economy in asphalt production using locally available materials necessitated this research which is aimed at evaluating the suitability of Saw Dust Ash (SDA) as mineral filler in asphalt mixture.Chemical analysis, sieve analysis, specific gravity and plasticity index tests were performed on SDA. Asphalt briquettes prepared using Ordinary Portland Cement (OPC) without saw dust as filler serve as the control. SDA was used to replace the Portland cement at 0% to 100% at an interval of 10% by weight. Marshall Test was conducted on all briquettes produced with SDA and OPC. Results of tests show that increase in SDA resulted in reduction in the value of bulk density. It was also observed that the total voids in the mix increased with SDA content, while the values of stability and flow decreased with SDA. The optimum bitumen content of 6.0% was used to prepare specimens. The flow value of asphalt decreased from 2.0mm when only the cement was used as filler to 1.0mm when the cement was completely replaced with 100% SDA. Voids in mineral aggregate increased from 18.28% when 100 % cement was used as filler to 26.32% when cement was completely replaced with SDA. Based on results of tests, the use of cement partially replaced with 10% SDA at 6% bitumen content is recommended for use in asphalt production.





CHAPTER ONE
Β 
INTRODUCTION
Β 
Β 
1.1Β Β Β Β Β Β Β Β Β Β Β Β Β Β Preamble
Β 
Β 
Continuous generation of wastes arising from industrial by-products and agricultural residue, create acute environmental problems both in terms of their treatment and disposal. The construction industry has been identified as one of the areas where the waste can be absorbed, with the majority of such materials used as filler in concrete (AntihosΒ et al.,Β 2005). If these fillers have pozzolanic properties, they impart technical advantages to the resulting concrete and also enable larger quantities of cement replacement to be achieved (Hossain, 2003). Approximate utilization of these materials brings ecological and economic benefits. Waste material recycling into useful products has been the current method of solving waste problems (Ahmed, 2006). Material recycling has been a common practice for most of human history with record as far back as Plato in 400 BC (Grosse, 2010). Recycling is a process to change waste materials into new products to prevent hazards associated with waste, reduces the consumption of fresh raw materials, and it also reduces greenhouse gas emissions arising from the conventional method of disposing such wastes (Grosse, 2010).

This Project is for You If:

Yes, This Is My Situation β€” Send Me the Complete Material

Here's everything you get with the complete project package:

βœ”Chapters 1–5 (Word & PDF)
βœ”Abstract & Table of Contents
βœ”References, Citation & Bibliography
βœ”Fully Editable Microsoft Word Format
βœ”Original, Plagiarism-Free Content
βœ”Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough β€” Get Me This Project Material

What Other Students Are Saying

β€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
β€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
β€œMy supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Civil Engineering Final Year Research Project Topics & Materials Β»

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered β€” Download the Complete Project
Message us