iProject

AN INVESTIGATION INTO QUALITY OF AGGREGATE IN ROAD CONSTRUCTION

📄 Project Material📋 65 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

ABSTRACT

The current extensive use of low quality aggregate in Nigerian road for engineering applications is of concern because their appear to be a level of ignorance surrounding their existing properties and implications. This project was conceived for the purpose of comparing the crushed aggregate deposits in Isi-Agu Abia State and mac-Daniels Abakiliki. One sample each were obtained from different location mentioned above and transported to ministry of works laboratory Enugu, Enugu State. These two aggregate samples were tested for sieve analysis test, relative density test, water absorption test,  ten percent fine test, aggregate crushing value test (ACV), Aggregate impact value test (AIV), and Abrasion value test. Findings revealed that the best aggregate for road construction is the aggregate from Isi-Agu. It also revealed that the standard strength for Abrasion is between 20 – 30 percent comparison were made between the results, precautions, procedures and observations. And this coarse aggregate should be tested and analyzed before using in any constructional purposes to ensure durability of engineering products.

 

CHAPTER ONE

INTRODUCTION

The basic thing in investigation into the quality of aggregate in road construction is that aggregates serves as reinforcement to add strength to the overall composite material. Due to the relatively high hydraulic conductivity value as compared to most soils, aggregates are widely used in drainage application such as foundation and French drains, septic drain fields, retaining wall drains and road side edge drains. Also the quality of aggregates helps to prevent differential setting under the road that binds with more expensive asphalt. Furthermore, aggregates feature at all levels of road construction up to the surface which includes aggregates resistant to polishing, ensuring skid resistance. The quality plan or system should cover all quality aspect of source material handling aggregate processing, stockpiling and transportation including methods and frequency of sampling and testing to be used, and should also identify key responsibilities.

 

1.6      BACKGROUND OF THE STUDY

It involves the analysis of the quality of Aggregates used in road construction in respect to its strength, properties of aggregates and application of aggregates in construction field. Also it explained why Aggregates can be defined as Natural aggregates, manufactured aggregates and Recycled aggregates. It reveals the difference between primary aggregates and secondary aggregates during the study. This study examines the practical uses and laboratory testing of the aggregates using different methods and the problem arising during the research. Also recommendation for developing and implementing a quality plan or system are covered during the research.

 

 

1.7      AIM AND OBJECTIVES OF THIS STUDY

THE GENERAL AIM AND OBJECTIVES OF THIS STUDY IS AS FOLLOWS

1.  To identify the key factors affecting the strength of aggregate structure which are aggregate shape, angularity and texture?

2.  To ensure that the specifications for aggregates angularity are included in the super pave mixture design system.

3.  To obtain a material sufficiently durable to last the design life of the road in order that its performance is not affected by deterioration or degradation of the material.

4.  To determine the aggregate abrasion resistance and breakdown of particles and tests that address aggregate weathering when exposed to freezing and thawing.

5.  To determine the different properties of aggregates

6.  To examine the different quality plan or system to controlling the sources of aggregate

 

1.8      SCOPE OF THE STUDY

 

It covers the systems and procedures recommended by Roading New Zealand (RNZ) for the quality assurance of aggregates for roads. The guideline was developed by quality Association of New Zealand. It reveals that the aggregate producer should have a formal quality plan system in operation in each quarry detailing the quality control producers to be used for sourcing rock and for controlling quality of each of the aggregate produced. Also the quality plan or system should cover all quality aspects of source material handling aggregate processing, stock pilling and transportation, including methods and frequency of sampling of sampling and testing to be used.

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Civil Engineering Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us