iProject

AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY

πŸ“„ Project MaterialπŸ“‹ 56 pagesπŸ“š Chapters 1–5πŸ’Ύ MS-Word & PDF

Chapters 1–5 Β |Β  ₦5,000

Get Complete Project Material Now

AN APPRAISAL OF FACTORS MILITATING AGAINST THE EFFECTIVE IMPLEMENTATION OF FORMAL RISK MANAGEMENT TECHNIQUES IN PROJECT DELIVERY

Β 

CHAPTER ONE

INTRODUCTION

1.1 Background Of The Study

Despite its numerous challenges, it is the Construction Industry that shapes the development parameters of any nation (Zeiss, 2007). So a firm grasp of the nature and effects of key issues affecting the Industry is always the beginning of developmental wisdom.

The construction industry is bedeviled with global climate change, aging infrastructure, shrinking workforce, declining productivity and information island (Akintoye and Macleod, 1997; El-sayeh, 2008; Smith, 1999 Zeiss, 2007; Hillson, 2002; Wang et al., 2004). Gandu and Musa-Haddary (2007) in their work mentioned high risks and uncertainties as additions to these problems.

In Nigeria, in particular, experts on management studies have lamented the complete neglect of formal risks management principles in the management of most construction projects (Akintoye and Macleod, 1997; Smith, 1999; Kartam and Kartam, 2001; Aina and wahab, 2011). Why most firms opt for the use of informal principle to the detriment of the formal and most beneficial ones is a puzzle that requires an organized study. In an assessment of some special challenges facing the Nigerian construction industry, Odonkor (2011) ranked poor risk understanding and management as the most unappreciated. The nature of this risk challenges as Odonkor (2011) partly observed lies in the failure to employ formal Risks Management Techniques available.Β 

Risk management is fundamental to accomplish those objectives, not only trying to keep away from bad results caused by some special events or uncertain conditions, but also acting as a guide in order to maximize the positive results. Risk Management refers to the culture, processes, and structures that are directed toward effective management of risks –including potential opportunities and threats to project objectives. Although risk is widely studied, it still lacks a clear and shared concept definition: risk is often only perceived as an unwanted, unfavorable consequence. Such a definition embodies two misleading concepts: first, among professionals there is an established consensus that risk needs to be viewed as having both negative and positive consequences. Second, risk is not only related to events, i.e. single points of action, but risk also relates to future project conditions. Conditions may turn out to be favorable or unfavorable. The point is that future project conditions are hard to predict in the early stages of the project life-cycle. In addition, conditions can change during the project lifecycle and the risk is that the conditions are different, and potentially more severe than was first estimated. Risks analyzed only as certain events are further criticized for not taking the degree of impact into consideration. Risks are seldom on-off-types, meaning that risks do not either happen or β€œnot-happen”, the impact of the risk varies greatly, depending on the conditions at the time of the possible occurrence (Finnerty, Floricel and Miller, in Klemetti 2006). Variability and the level of predictability (uncertainty) of the future scenarios determine the quality of risk analysis done today.

Managing risks in construction projects have been recognized as a very important process in order to achieve project objectives in terms of time, cost, quality, safety and environmental sustainability (Mills, 2001). Project risk management is an iterative process: the process is beneficial when is implemented in a systematic manner throughout the lifecycle of a construction project, from the planning stage to completion.

Risk management has become an integral process in managing construction projects. Construction project activities are to be well calculated in-order for the deliverable to be of great use and benefit to its stakeholders. To complete most construction projects on time, minimizing cost and wastages proper risk management techniques must be employed (Tchankova, 2002). According to Mills (2001), systematic risk management is expecting the unexpected or in other words it is a tool which helps control risks in construction projects and its objective is to introduce a simple, practical method of identifying, assessing, monitoring and managing risk in an informed and structured way.

Normally, in risk management process, the first steps will involves risk identification process which includes the prioritization process in order to identify and rank the risk based on its impact and seriousness. Risk that will have a greater impact on a project normally will be handled first and low impact risk will be handled later.

Construction project team consist of professional such as the architect, engineer, and the quantity surveyor that will help to assist and advice the client in order to meet all the project objectives in term of time, quality and cost. Awareness and knowledge on risk management is very crucial so that they will deal with the risk properly which will directly leads to project success. Due to this scenario, this research aims to identify the level of awareness of construction professional specifically Nigerian quantity surveyors towards risk management. Apart from that, it will also aim to identify how risk management being implemented in the Nigerian construction industry and also the potential barrier and challengers in the implementation of risk management specifically from the quantity surveyor's point of view.

1.2 Statement Of The Problem

Embarking on a construction project involves taking risks, as the Nigerian construction industry is not risk-free. No matter how small or simple is the project it is still can go wrong as soon as the two parties, the employer and the contractor signed a contract they have taken onboard the risk (Sawczuk, 1996). The individual in the construction industries that undertake various activities are heterogeneous since client, consultant and contractors have different roles and objectives (flanagan, 1995). Risk management in Nigerian construction industry is actually not widely being practiced.

According to Burchett (2009), Risk in construction, however cannot be eliminated, but it can be minimized, transferred or retained. However, the industry has a very poor reputation for managing risk, with many projects failing to meet deadlines and cost argents (Mills, 2001). In practice, normally in order to deal with the unexpected event, there will be an allocation about 10 percent from the estimated cost of the proposed construction project as a contingency sum. Earlier observation shows that the risk management process is not widely being implemented in Nigerian construction industry. For this reason, this research seeks to identify the barriers and challenges for the implementation of risk management in the Nigerian construction industry.

1.3 Objective of the study

The main objective of this study isΒ  an appraisal of factors militating against the effective implementation of formal risk management techniques in project delivery. Specifically, this study aims to

1. Determine the internal barriers that militating against the effective implementation of formal risk management techniques in project delivery.

2. Determine the external barriers that militating against the effective implementation of formal risk management techniques in project delivery.

3. To proffer solution to the factors militating against the effective implementation of formal risk management techniques in project delivery.

1.4 Research question

1. what are the internal barriers militating against the effective implementation of formal risk management techniques in project delivery ?

2. What are the external barriers militating against the effective implementation of formal risk management techniques in project delivery ?

3. what are the solutions to the factors militating against the effective implementation of formal risk management techniques in project delivery ?

1.5 Significance Of The Study

Findings of this study will aid Nigerian quantity surveyors in appreciating the importance of adopting proper risk management techniques in their daily jobs. Since risk management is not widely being adopted in Nigerian construction industry, this research will help to promote the practice of risk management among the industry's players.

In addition to this, being an inter-discipline type of research, both the consultants and contractors and also the industry as a whole may benefit from the outcome of the research and have better understanding on risk management.

1.6 Scope And Limitation Of Study

This research study will focus on risk management practices adopted by construction firms and stakeholders in Abuja metropolis, Nigeria. All findings and recommendations from the study are limited to findings and recommendations based on the chosen sample size.

In carrying out this study, the researcher was faced with time and finance constraints, as lectures did not give room for more time to extend the research time frame. Finance on the other hand made printing, transportation to cover a wider area difficult.

1.7 Definition Of Terms

RISK- This is the potential of losing something of value, weighed against the potential to gain something of value.

RISK PERCEPTION- Risk perception is the subjective judgment people make about the severity of a risk, and may vary person to person

PRACTICE- is the act of rehearsing a behavior over and over, or engaging in an activity again and again, for the purpose of improving or mastering it, as in the phrase "practice makes perfect

QUANTITY SURVEYOR- a Quantity Surveyor (QS) is a professional working within the construction industryconcerned with construction costs and contracts.

CONSTRUCTION- In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

RISK MANAGEMNENT- is the identification, assessment, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events or to maximize the realization of opportunities.

Β 

This Project is for You If:

Yes, This Is My Situation β€” Send Me the Complete Material

Here's everything you get with the complete project package:

βœ”Chapters 1–5 (Word & PDF)
βœ”Abstract & Table of Contents
βœ”References, Citation & Bibliography
βœ”Fully Editable Microsoft Word Format
βœ”Original, Plagiarism-Free Content
βœ”Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough β€” Get Me This Project Material

What Other Students Are Saying

β€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
β€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
β€œMy supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Business Admin. and Management Final Year Research Project Topics & Materials Β»

🏷 Tags:TechniquesRisk managementEffective implementationProject Topicsiprojectproject deliverymilitating factors

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered β€” Download the Complete Project
Message us