MANPOWER PLANNING AND DEVELOPMENT AS AN EFFECTIVE TOOL FOR ACHIEVING ORGANIZATIONAL GOALS

πŸ“„ Item Type: Project Material| πŸ“‹ 65 pages| πŸ“š 1–5 chapters| Amount: ₦5,000

MANPOWER PLANNING AND DEVELOPMENT AS AN EFFECTIVE TOOL FOR ACHIEVING ORGANIZATIONAL GOALS

πŸ“„ Project Material πŸ“‹ 65 pages πŸ“š Chapters 1–5 πŸ’Ύ MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

ABSTRACT


This research focuses on Manpower Planning and Development as an effective fool for Achieving Original Goals, using star paper Mill Ltd Aba as the case study. The problems of this study are numerous, to which one is the absence of administrative control in achieving the overall approved programs. The objective of this study is to map out enough manpower planning time and skills that will help manager gather information that will help them after ascertaining the organization manpower planning resources. The findings of this study showed that adequate finance is needed mauled for field work, and also that previous manpower plan serves as a good basis in determining new manpower plan. Therefore, it is discovered through the data analysis which was questionnaire that manpower planning has an effect in achieving organizational goals and objectives. The descriptive approach of research design which was used enabled the researcher to gather analysis and interpret the set of data. The research made use of interview, observation and questionnaire as her instrument for data collection. Recommendations, conclusion and finding of this project state that management should be using their previous manpower plan as a point of contact while prepping for a new plan in order to avoid mistakes.

CHAPTER ONE
1.0 INTRODUCTION:
1.1 BACKGROUND OF THE STUDY:
Manpower planning and development is the first and the
most important function of management. The essence of manpower planning and development involves a critical analysis of the supply, demand, surplus, shortage and utilization of human resources. It is important to note that manpower planning is often taken as the most important resources of an organization because through it, other resources (material and financial) are harnessed to meet the need of man.
The economic development of a country depends on the quality and quantity of its resources, the state of technology and efficient deployment of resources in both production and consumption process.
Most organizations today is facing problems because they did not plan for their workforce neither do they have any systematic human resources management programs that consider organizational goals.
Planning is the first and most important function of management. The essence is to prepare for and predict future events. Planning goes beyond attempting to attain stated organizational objectives. It involves the
development of strategy and procedures required for effective realization of the entire plan.
One of the major problems confronting management in any organization is the most effective way of matching people with jobs. The process by which management attempt to provide for the human resources or manpower to accomplish its task is called β€œmanpower planning”.
The concept of manpower planning has been given different definition by different authors. Malthus and Jackson (1992) see manpower planning as the process of analyzing and identifying the need for the availability of human resources so that the organization can meet its human resources objectives.
Griffin (1997) sees human resources planning as a plan which involves accessing trends, forecasting the supply, demand for labour and the development of appropriate strategy for addressing any differences.
Ehegbunna (1992), sees manpower planning as having the right person in the right number, in the right place and at the right time.
Olutola (1986), when manpower planning is mentioned, it generally refers to the projection of future requirement for a given number of people with specific skill to meet the demand of various sector of the economy.
Ogunniyi (1992), in handling manpower planning said that it is a concept that involves critical analysis of supply, demand, surplus, shortage, wastage, and utilization of human resources.
Manpower planning is necessary in all organization because it is required for recruitment. Without it, it would be difficult to know the number of personnel’s required for recruitment.
Manpower planning and development helps measurement to determine:
(a) Number of employees
(b) The level of experience each must possess
(c) Their salary scale
(d) The best way to utilize them in an activity which practice increase skills.
Star Paper Mill Ltd was incorporated as a paper connoting company in 1997. Now, the company operates thru (3) factories which includes stationary plant at Umungasi (Aba); the recycling and conversion plant at Owerrinta and the Ibadan conversion plant. It also has liaison offices in Lagos, Ibadan, Kaduna, Kano, Suleja and Onitsha.
The premier plant located at Aba, produces school exercise books of different types and a wide range of stationary. It has an installed capacity of
25,000 metric tones per annum which translates into 38 million envelops of various sizes and colours. Other products include typing sheets, duplication papers and fullscap files. The cement percentage utilization is about 75 percent.
The second factory was commissioned in 1984 as a waste paper recycling plant, with an installed capacity of 10 metric tones of tissues paper in jumbo reels per day. By 1992 a new paper machine was installed with the capacity of 15 metric tones of tissues paper per day, presently, the Owerrinta plant has a total capacity of 60 metric tones per day. This paper utilizes waste paper and paper off cuts as its main sources of raw materials and that constitutes 90% both in volume and in naira value of the plant requirement locally sourced. In this plant also exists a toilet rolls production line which utilizes the jumbo reels as inputs and produces 140, 000,000 units of toilet rolls, paper napkins per year. This in effect positions the company as the largest producer of toilet rolls and tissue products in the country, with marketing outlets throughout the entire country. This plant just commissioned a new product line sanitary towel for ladies with the brand name of β€œevery woman” becomes a new addition to the stable.
1.2 STATEMENT OF THE PROBLEM:
This project is carried out to examine the impact of manpower planning and development in relation to the achievement of organizational objectives. Despite the emphasis being laid on effective and efficient manpower planning and development, an organization still faces more problems in manpower planning and development.
Among the problems are as follows;
(i) There is increase of waste of materials, time and money in the organization.
(ii) There is unnecessary breakdown in organizational operations.
(iii) There are no clear-cut policies for the guidance and co-operations of all personnel who are accountable for day to day executive decision.
(iv) There are no interpretations of what each segment of the organization must do so that every function will be integrated with all related activities and this resulted to gaps and duplications of work.
(v) There is no established administrative control in order to assume the attainment of desired results in conformity with approved objective, policies and programmes.
(vi) There is no clarity results desired, criteria and schedules so that every manager in the system will know what is expected of the organization as a whole and his department.
(vii) There is inter-departmental conflict and this resulted to staff alienation.
(viii) There is confusion, misunderstanding and conflict about roles and responsibilities of people employed in the organization.

This Project is for You If:

  • βœ…You are writing your final year project for the first time and don't want to make costly mistakes
  • βœ…This is your exact topic, or very close to what your supervisor gave you
  • βœ…Your supervisor has rejected one or more chapters and you don't know what to fix
  • βœ…You are stuck on Chapter 3 or data analysis and nothing is making sense
  • βœ…Your deadline is close and you are still far behind
  • βœ…You can't find enough materials anywhere for your topic
  • βœ…My project supervisor is very strict and I don't want to have any problem with my project work β€” I need a well structured and referenced project
  • βœ…I saw my school project requirement and I am confused on where or what to do
  • βœ…Everyone in my class has submitted their project and I haven't even started yet
  • βœ…My supervisor rejected my research methodology and I don't know what to do
  • βœ…I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • βœ…I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • βœ…I am combining school with work and I genuinely do not have the time to write everything from scratch β€” I just need something to work with
  • βœ…My supervisor changed the topic I wanted and approved another one β€” I am confused on where to start from
  • βœ…I am scared of submitting something that will be flagged for plagiarism β€” I need something original that I can use as a proper guide
  • βœ…I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • βœ…This is not my first time doing this project β€” I have carried it over before and I cannot afford to do it again
  • βœ…I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation β€” Send Me the Complete Material

Here's everything you get with the complete project package:

βœ”Chapters 1–5 (Word & PDF)
βœ”Abstract & Table of Contents
βœ”References, Citation & Bibliography
βœ”Fully Editable Microsoft Word Format
βœ”Original, Plagiarism-Free Content
βœ”Delivery Within 24 Hours
Complete package β€”₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough β€” Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered β€” Download the Complete Project