EMPIRICAL DETERMINATION OF LABOUR OUTPUTS FOR BLOCK LAYING

📄 Item Type: Project Material| 📋 67 pages| 📚 1–5 chapters| Amount: ₦5,000

EMPIRICAL DETERMINATION OF LABOUR OUTPUTS FOR BLOCK LAYING

📄 Project Material 📋 67 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now
ABSTRACT
The source and nature of output constants used for preparation of construction estimates should be accurate and reliable for the client to have confidence on the prepared estimates. This research is focused on using time study approach to empirically determine the outputs of block laying work items inconstruction industry. The study reviewed BESMM3 and surveyed possible block work items in construction sites. Ten work items were selected from the identified block work items in BESMM3 and construction sites for Physical observations and output measurement. A total of 105 sites were observed in F.C.T., Abuja and Nasarawa state. Data collected were subjected to statistical analysis using both the descriptive and inferential data analysis techniques. The inferential tools adopted were T-test and ANOVA statistics to assess and examine the influence of some selected labour productivity factors on the outputs of the workers observed. The inferential test revealed the following; period of observation, shape of the building and mode of employment significantly affected outputs on the ten work items. The results of the analysis carried out established mean output values per day for: 150mm thick block in foundation (12.85m2); 150mm thick block in superstructure (13.22 m2); 150mm thick block in superstructure overhand (12.47m2); 225mm thick block in foundation (8.90m2); 225mm thick block in superstructure (11.17m2); 225mm thick block in superstructure overhand (9.16m2); 225mm thick block isolated piers in superstructure (5.00m2); 225mm thick block piers in superstructure overhand (4.57m2); 225mm thick block in pit bottom plan > 4 m2
(7.85m2); 225mm thick block in bottom plan < 4 m2 (7.13m2). The study also identified forty-four (44) block work items not captured in BESMM3 and suggested that these work items be incorporated into BESMM3 for productive and cost implication. The research recommended that in compliance to BESMM3, the NIQS in collaboration with NJIC to sponsor a research on determination of labour outputs in all trades as a way to ensure uniformity in output constants. The study therefore finally concludes that SMM takes cognizance of productivity impact associated with labour and it is imperative for reliability and accuracy in block work estimate to empirically determine labour outputs on the basis of work items as stated in BESMM3.





CHAPTER ONE
1           INTRODUCTION
1.1          Background of the Study
In Nigeria, like most developing countries, the construction industry plays a dominant role in the economic activities of the country.The efficiency of the construction industry has been established to heavily rely on its level of productivity. Construction productivity is constantly declining over a decade due to the lack of standard productivity data base system and ignorance of impact of various factors influencing labour productivity (Muqeemet al., 2011).The accuracy of the project cost estimates depend largely on the degree of accuracy of cost information obtained on the key components of an estimate (i.e. labour, plant, material, and profit and overhead) (Abdullahi, 2009), while the use of Standard Methods of Measurement (SMM) for the preparation of BOQ gives the quality and standard of the extent of work to be done, it also takes precedence of the cost significances of every classes of operations within a trade.
The common method of generating cost estimates for construction projects involves the multiplication of unit rate by the measured quantities in the bill of quantities (Ashworth, 2002).The unit rate is a component of labour rate (obtained from the multiplication of labour constant by all-in rate) plus cost of material and percentage allowance for profit and overhead, while the measured quantities are obtained from drawings and specifications for the works rules specified by Building and Engineering Standard Methods of Measurement (BESMM3).
RISK IDENTIFICATION AND ASSESSMENT IN HOUSING DEVELOPMENT PROJECTS USING ANALYTICAL HIERARCHICAL PROCESS

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Instant Email Delivery
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project