EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK
EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR FLOOR SCREED AND TILE FINISHES FOR CONSTRUCTION WORK
Chapters 1–5 | ₦5,000
Download Complete Project NowABSTRACT
There is dearth of information on output level of building operatives in Nigeria, consequently, the output constants currently used for preparation of construction estimates are remnants of British colonial heritage or derived from untested experiences. Therefore this study aims at empirically determining output constants for floor finishes (screeds and tiles) for building project in Abuja. The objectives are to identify the productivity factors related to Building Engineering Standard Method of Measurement 3 (BESMM3) and evaluation of their impact on the outputs of five work items of floor finishes. The procedure adopted field survey involving work measurement to observe and measure operatives output. Data was collected from 80 on-going construction sites with an average of 50 gangs of workers for each work item to establish the following average outputs per day; 25mm thick cement and sand screed (23.70), 44mm thick cement and sand screed (19.31), 400 X 400mm ceramic floor tile (27.38), 300 X 600mm ceramic floor tile (30.18) and 300 X 300mm ceramic floor tile (23.61). The study also revealed a significant difference on mode of employment and period of observation on the outputs of the workers. The results suggest that experience and negotiation as mode of employment affect output of workers to varying degrees based on the thickness of floor screed and unit area of floor tile. The study has recommended that the established output should serve as an effective baseline for efficient estimating process and be in compliance with the BESMM requirements.
CHAPTER ONE
1.0 INTRODUCTION
1.1 Background of the Study
The source of labour output used for estimation of construction cost has been a point of discourse and contention. This is because this involves the quantitative estimation of the labour rates while market survey research for materials prices are the basis for the material cost estimation (Ashworth, 2002). The high degree of inaccuracy found in BOQ estimates is mostly attributed to the uncertainty of the accuracy of the labour constants used in pricing labour costs. Ajia (2002) concluded that while most of the outputs used by estimators are the British originated constants, some contractors adopt outputs gotten from their experience and hence non-uniform outputs are widely in use.
The common method of generating cost estimates for construction projects involves the multiplication of unit rate by the measured quantities in the bill of quantities (Ashworth, 2002). The unit rate is a component of labour rate (obtain from the multiplication of labour constant by all-in rate) plus cost of material and percentage allowance for profit and overhead, while the measured quantities are obtained from drawings and specifications for the works rules specified by Building and Engineering Standard Methods of Measurement (BESMM). The inconsistency in application of a defined output constant for construction estimates has posed a serious challenge to the accuracy of estimates computed by quantity surveyors.
Labour being one of the important components of the construction industry productivity represents a considerable proportion of the final cost usually accounting for between 40 to 60% of building cost (Abdullahi et al., 2010 and Butchan et al., 1993).
This Project is for You If:
- You are writing your final year project for the first time and don't want to make costly mistakes
- This is your exact topic, or very close to what your supervisor gave you
- Your supervisor has rejected one or more chapters and you don't know what to fix
- You are stuck on Chapter 3 or data analysis and nothing is making sense
- Your deadline is close and you are still far behind
- You can't find enough materials anywhere for your topic
- My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
- I saw my school project requirement and I am confused on where or what to do
- Everyone in my class has submitted their project and I haven't even started yet
- My supervisor rejected my research methodology and I don't know what to do
- I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
- I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
- I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
- My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
- I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
- I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
- This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
- I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Here's everything you get with the complete project package:
✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.
See Our Conversations With Students on WhatsApp
Students sharing their experience after using our service
Urgent delivery confirmed
Screenshot unavailable
Payment received and project delivered
Screenshot unavailable
Quality work and a repeat order
Screenshot unavailable
Returning customer appreciation
Screenshot unavailable
Customer appreciation
Screenshot unavailable
What Other Students Are Saying
↩ View More ReviewsCan't find what you're looking for?
Search thousands of project topics across every department.
Frequently Asked Questions
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.