AS-BUILT SURVEY OF MEDIUM LAYOUT

📄 Item Type: Project Material| 📋 65 pages| 📚 1–5 chapters| Amount: ₦5,000

AS-BUILT SURVEY OF MEDIUM LAYOUT

📄 Project Material 📋 65 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

CHAPTER ONE

1.0   INTRODUCTION

As-built survey has been an essential element in the development of the human environment since the beginning of recorded history. It is performed to verify that a particular improvement on a parcel of land has been built according to the proposed design plans, specifications and setback requirement. It shows how any field change made during construction fit the overall design of the development. If this As-built data are not obtained, engineers, architect, land planners, clients and other may be misled in assuming that the construction work performed conforms perfectly to the original drawing  .It is used to document the size and / or location of an improvement used to aid in the design of addition of buildings, extention, sewer and parking lot  expansion. It help landing institution to protect their interest, accurate decision making, updating of information and as a reference material for student ministry and individual.

Medium density layout, Ifuho, is a residential estate located in Ikot Ekpene Local Government Area, Akwa Ibom State. It is made up of twenty-five(25) existing building with internal access road, available space which is used for agricultural farming.

Due to increase in population, scarcity of houses, political and topographic effect, medium density layout needs As-built survey in order to determine the final location of existing features and the available space for proper planning ,redesigning and expansion.

The aim of As-built survey on medium density layout is to produced an As-built plan to ascertain the final location of available detail and available space for further development of the estate by way of expansion.

The processes involved in the achievement or the above aim is reported here forthwith.

STATEMENT OF PROBLEM.

Due to political reason, cost and topographic of the area, errors(instrument, atmospheric, human etc),buildings were not built according to the design. Medium density layout need As-built survey to determine the final location of existing feature, thus enhances proper use of available space for expansion.

AIM AND OBJECTIVES

The aim of this project was to produce an As-built plan of medium density layout, Ifuho, Ikot Ekpene Local Government Area for the purpose of ascertaining variations of detail as constructed from the design.

This was achieved through the following objectives:

  1. Establishing the perimeter using traverse.
  2. Measurement of relative position of the detail within the study area.
  3. Preparation of an overlay plan which facilitated the comparison.
  4. To explore the power of computer application software especially in the plan production.

SCOPE AND LIMITATION

The scope of this project, amongst other things is limited to the production of As-built plan of medium density layout using traverse method through the objective stated in 1.2 above.

However, height information was not considered.

SIGNIFICANCE OF STUDY.

Production of As-built survey plan of medium density layout will be significant in the following ways:

  • For accurate decision making to the developer for physical planning and further development and/or expansion of the estate.
  • For updating of information and quick retrieval of information for environmental management for the government.
  • As a reference material for student, ministry and individual for further research work.
  • Enhance the knowledge of the student in the area of As-built survey.

SPECIFICATIONS

Angular Observations:

Type of instrument-minimum of 20”graduation interval.

Number of observation- 2 zeros(face left/face right).

Accuracy of observation- the maximum spread of 2 zeros valves shall be 20 seconds.

Linear Observations:

Type of equipment: EDM

Method of measurements: on level smooth ground, surface taping may be employed. On rough terrain catenary tapping may be used, preferably EDM Accuracy of measurement: standard error of linear measurements should be one part in 20,000. Differences between two observations should exceed 1cm.

Instrumentation; Any instrument including electronic theodolites, total stations or GPS capable of achieving the above accuracies or better may be used.

Accuracy:

  1. Four set of observations (for doubtful latitude pair East/West observations).
  2. Angular spread -10” 0n 4 zeros.
  3. Bearing closure at Azimuth check points not to exceed 30”±N, where “N” is the number of instrument stations.

Plotting of plan:

  1. Plotting should be done by rectangular coordinates, details and irregular boundaries by offsets or bearing and distances.
  2. Plans shall show clearly defined plot boundaries, detail within and along the boundary.

Heading for a certified plan:

Should include:

  1. Title of survey.
  2. Locality- street–town/village, Local Government Area and state.
  3. Scale and with its linear representation
  4. North Arrow/origin ,AREA

Demarcation of Boundaries

Type of beacons:

  1. Property beacons shall be 18cm×18cm×75cm.
  2. Cemetry beacons shall be 10cm×10cm×60cm.
  3. Spikes shall be rod pin 40mm marked with the center punch mark at the top.

Marks on boundary walls, a cross ‘x’ with identification number shall be cut and painted on the outside wall where it intercept surveyline. Public survey shall carry double arrows.

Large concrete beacons/markers may be used for right of way survey (ROW).

Location of boundary beacons.

All corners of plot including point of changes in direction and on straight long lines at intervals of not more than 250m in layouts and 400m in farmland.

Requirements of boundary beacons.

Adjacent boundary beacons should be inter visible, but where for some reasons this is not possible, multiple observation from proven station or pair of stations to fix a beacon.

Survey of boundaries.

Available methods of survey

The boundaries will usually be surveyed by closed theodolite traverse. Other methods include staring the traverse on checked and proven boundary beacons and ending same on checked and proven boundary beacons insofar as the starting and closing beacons form part of the new boundary of the property surveyed .For any of the methods, the position closure (after Azimuth adjustment where applicable)shall be 1/5,000.

Field books

  1. All field observation must be entered in the field book clearly with neat booking.
  2. Clear diagrams: Diagrams of plot survey must be unambiguously represented in the field book. Such diagram will also show permanent features within and along area adjacent to the plot.
  3. Electronic field book may also be used.

Computations:

  1. Computation – manual or electronic shall include the following:
  2. Azimuth computation where necessary.
  3. Reduction of bearing showing angular closures.
  • Distance, measured/corrected.
  1. Un-adjusted/final coordinate/linear closures.
  2. Area computation.
  3. The required computational accuracy are as follows:
  4. Deduced bearing to the nearest 10”
  5. Corrections to measured distance for slope, standard(standardization where applicable) to the nearest mm.
  • Coordinates to the nearest mm.
  1. Area

Allowable drawing scales:

The following drawing scale shall be used for plotting:

  1. 1:250
  2. 1:500
  • 1:1,000
  1. 1:2,000
  2. 1:2,500
  3. 1:5,000
  • 1:10,000
  • 1:20,000
  1. 1:25,000

Different scales may be used for the main survey and the connection where the latter is long. Any chosen scale should permit the clear representation of all measured detail, bearing, distances and area on plan.

Electronic copy maps must be prepared using base data with relevant location accuracy.

STUDY AREA   

The study area is medium density layout, Ikot Offiong, Ifuho, Ikot Ekpene Local Government Area, Akwa Ibom State and it is located on latitude 58 46 longitude 135 00 UTM zone 32 north. The estate is situated along Ikot Offiong road on the south and on the west 500m away from Aba r

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Instant Email Delivery
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project