A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA

📄 Item Type: Project Material| 📋 65 pages| 📚 1–5 chapters| Amount: ₦5,000

A STUDY ON THE TRENDS IN BUILDING COST IN NIGERIA

📄 Project Material 📋 65 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

 

CHAPTER ONE

1.0     INTRODUCTION

The dictionary definition of trends simply means “to move or extend in a specific direction” (Long Man Family Dictionary) also trends simply means “a general direction in which a situation is changing or developing” (Advance Learner’s Dictionary).

Leaning on, this definition of “trends” thus the subject matter “trends in building cost in Nigeria” can be described as a way to move or extend in a specific direction of building cost in Nigeria.

This trend in building cost is associated with the cost of erecting a building which includes the physical preparation and developmental cost.

The construction industry is very vital to the socio-economic development of a nation, this is because the affordability or otherwise of construction affect the confidence of the citizen in their existence in any nation.

One of the first and most fundamental aspect of human needs is shelter, therefore, it become necessary that the cost of constructing a given building project should be within the reach of the average citizens, (Dr. A.R Oladele 2007).

Over the years, the discovery of oil in Nigeria alongside with increasing population led to the increase in the demand for building in Nigeria.

Also the unscheduled changes of government in Nigeria lead to the formulation of policics from one government to the other which sometimes do not favour the construction industry.

These trends in building cost are caused by the following factors which include:

  1. Method of construction
  2. Limited number of manufacturers of building materials
  3. Employment of foreign expatriates
  4. Increment of wages
  5. Import tariff
  6. Fuel scarcity
  7. Bribery and corruption
  8. Second tier of foreign exchange

These reasons mentioned above are making a tremendous contribution to the increasing building cost which in turn posing a potential blockage to the chance of the less privileged ones to own a house or building and also went further to make it difficult for them to pay rent charged by the lessor on a house.

Therefore, this project is aimed at highlighting various factors that influence these trends in building cost in Nigeria. And to come up with possible solution to curtail these treads through oral interview and questionnaires with parties involved also to asses the changes within the period of ten years (10 years) (2000-2010).

1.1  STATEMENT OF THE PROBLEMS

One of the challenges faced by the construction industry in Nigeria is the fluctuation of the prices of building materials which lead to upward and downward movement of building cost in Nigeria.

Most average Nigeria citizens are of low income thereby making it difficult for them to own a building if these trends are not properly study to plan ahead of time for a given project.

1.2     AIMS AND OBJECTIVES OF THE STUDY

1.2.1 Aim: The aim of this study is to access the trends in building cost in Nigeria from (2000-2010).

1.2.2 OBJECTIVES

This project has the following objectives:

  • To identify the behavioural pattern of building cost within a given period of time.
  • To determine the effects of these trends as it affect the society
  • To identify the causes of trends and how it can be controlled in the society.
  • To make probable recommendations on where appropriate.

1.3     SIGNIFICANT OF THE STUDY

To ascertain possible ways of using cost comparison of different cost of building project in Nigeria.

1.4 SCOPE AND LAMINATION

This thesis is to examine a general tendency on how cost of building changes in regards to time and in relation to plant, labour and materials.

The study is limited to the comparison of the cost of a two bedroom bungalow over a period of ten years(10yrs) through updating of some major building element obtained from bill of quantities from tender rates in relation to the trends from (2000 – 2010) using the cost index method of analysis.

1.5 METHODOLOGY

The method adopted for this thesis includes: oral interviews, questionnaires and case study of two (2) bedroom bungalow.

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Instant Email Delivery
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project