iProject

DEVELOPMENT OF BREAKTHROUGH TIME CORRELATIONS FOR CONING IN BOTTOM WATER SUPPORTED RESERVOIRS

πŸ“„ Project MaterialπŸ“‹ 50 pagesπŸ“š Chapters 1–5πŸ’Ύ MS-Word & PDF

Chapters 1–5 Β |Β  ₦5,000

Download Complete Project Now

ABSTRACT

Β 

Β 

This research work mainly investigates the development and the behavior of cones (both water and gas cones) in oil reservoirs supported by strong aquifer, and from which analytical correlations are developed for quick engineering estimates of the time for water/gas cones to break into the perforations of the producing wells. The studies treated the cone development and breakthrough times in both horizontal and vertical well producing reservoirs and made analysis on them. The Ozkan and Raghavan (1990) method was employed as the base approach in the modeling of the cones; as well as their breakthrough times and then compare with that of Chaperon’s approach(1986) with both the horizontal and vertical well applied. The developed models were then run on field data, the results were graphically represented in both the horizontal and vertical well cases. Analytical correlations were then developed from the results obtained for breakthrough time estimation and compared with literature on example case. This work actually employs the dimensionless (or the normalized approach) system to curtail the units complexities and represent the results in a more generalized form. These analytical correlations can be leveraged on to plan better future recompletion strategy as they provide an engineering estimate of when water breaks into the production wells.



CHAPTER ONE

Β 

1.1INTRODUCTION

Β 

Coning is the mechanism describing the movement of water/gas into the perforations of producing wells. For water coning the movement is upwards for the case of bottom water, side wards for edge water, but it is downwards for gas coning. The production of water from oil wells is a common occurrence which increases the cost of producing operations and may reduce the efficiency of the depletion mechanism and the recovery of reserves. The objective of this research work is to model the behaviour of this coning(mainly water coning, from bottom water) and then use it to evaluate the time it would take a cone to break into the producing well in reservoir of well-defined boundary conditions.

Β 

The coning of water into production wells is caused by pressure gradients established around the wellbore by the production of fluids from the well. These pressure gradients can raise the water-oil contact near the well where the gradients are dominant. The gravity forces that arise from fluid density differences counterbalance the flowing pressure gradients and tend to keep the water out of the oil zone. Hence, at any given time, there is a balance between the gravitational and the viscous forces at any point on and away from the completion interval. The water cone formed will break eventually into the well to produce water along with the oil when the viscous forces exceed that of the gravitational forces. This basic visualization of coning can be expanded further by introduction of the concept of stable cone, unstable cone and critical production rate.

STABLE CONE:

Β 

If a well is produced at a constant rate and the pressure gradient in the drainage system have constant, a steady state condition is reached, if at this condition, the dynamic forces (viscous forces) at the well are less than the gravity forces then the water or gas cone that has formed will not extend to the well .Moreover, the cone will not advance nor recede, thus establishing what is known as stable cone.

Β 

Β 

Β 

Β 

UNSTABLE CONE:

Β 

Conversely, if the pressure in the system is in an unsteady-state condition, then the cone that will be formed is unstable and it will continue to advance until the steady-state condition takes over. If the flowing pressure drop is sufficient to overcome the gravity forces, the unstable cone will mushroom and ultimately break into the well. In actual sense therefore, stable cones may only be 'pseudo-stable' because the drainage system and the pressure distribution generally change. For a example, during reservoir depletion, the water- oil contact may advance toward the completion interval, thereby increasing coning tendencies. Another one is reduction in productivity due to well damage requires a corresponding increase in the flowing pressure drop to maintain a given production rate. This increase in pressure drop may force an otherwise stable cone into the well.

Β 

This Project is for You If:

Yes, This Is My Situation β€” Send Me the Complete Material

Here's everything you get with the complete project package:

βœ”Chapters 1–5 (Word & PDF)
βœ”Abstract & Table of Contents
βœ”References, Citation & Bibliography
βœ”Fully Editable Microsoft Word Format
βœ”Original, Plagiarism-Free Content
βœ”Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough β€” Get Me This Project Material

What Other Students Are Saying

β€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
β€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
β€œMy supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Petroleum Engineering Final Year Research Project Topics & Materials Β»

🏷 Tags:Development of breakthrough time correlationBottom waterReservoirsImportance of reservoirsImpact of reservoirsFunctions of bottom water

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered β€” Download the Complete Project
Message us