BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS

📄 Item Type: Project Material| 📋 50 pages| 📚 1–5 chapters| Amount: ₦5,000

BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS

📄 Project Material 📋 50 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

ABSTRACT

Techniques in Geostatistics are increasingly being used to generate reservoir models and quantify uncertainty in reservoir properties. This is achieved through the construction of multiple realizations to capture the physically significant features in the reservoir. However, only a limited number of these realizations are required for complex fluid flow simulation to predict reservoir future performance. Therefore, there is the need to adequately rank and select a few of the realizations for detailed flow simulation.

This thesis presents a methodology for building and ranking equiprobable realizations of the reservoir by both static and dynamic measures. Sequential Gaussian Simulation was used to build 30 realizations of the reservoir. The volume of oil originally in place, which is a static measure, was applied in ranking the realizations. Also, this study utilizes Geometric Average Permeability, Cumulative Recovery and Average Breakthrough times from streamline simulation as the dynamic measures to rank the realizations. A couple of realizations selected from both static and dynamic measures were used to conduct a successful history match of field water cut in a case study.



CHAPTER ONE  INTRODUCTION

1.1        PROBLEM DEFINITION

In Geostatistical reservoir characterization, it is a common practice to generate a large number of realizations of the reservoir model to assess the uncertainty in reservoir descriptions for performance predictions. However, only a limited fraction of these models can be considered for comprehensive fluid flow simulations because of the high computational costs. There is therefore the need to rank these equiprobable reservoir models based on an appropriate performance criterion that adequately reflects the interaction between reservoir heterogeneity and flow mechanisms.

Most techniques used in ranking of realizations are based on static properties such as highest pore volume, highest average permeability, and closest reproduction of input statistics. The drawback of these simple techniques is that they do not account for dynamic flow behavior which is very essential in predicting future reservoir performance.

This thesis work seeks to build and rank equally probable representations of the reservoir using petrophysical properties such as porosity, water saturation, and permeability. The multiple reservoir descriptions are ranked using both static (Stock tank oil originally in place) and dynamic (geometric average permeability, connected hydrocarbon pore volume, average breakthrough times and cumulative recovery) measures.

1.2        OBJECTIVES

The main purpose of reservoir characterization is to generate a more representative geologic model of the reservoir properties. The objectives of this study are as follows.

In building a static representation of what a reservoir is most likely to be it is necessary to adequately capture the uncertainty associated with not knowing its exact picture. In the effort of capturing the uncertainty, this study focuses on generating multiple equiprobable realizations of the reservoir with each having unique static and dynamic properties.

Only a few number of the realizations generated could be carried on for complex flow simulation due to the computational cost. Usually ranking of the realizations to select a limited number are done by static means which do not capture the dynamic mechanisms essential to reservoir performance. Only few dynamic ranking measures are currently in use. This research work seeks to define new dynamic ranking criteria and compare them with existing criteria.

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Instant Email Delivery
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

🏷 Tags: Building Ranking Geostatistical Petroleum reservoir model Impact of ranking Geostatistical analysis Importance of building

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project