iProject

BUILDING AND RANKING OF GEOSTATISTICAL PETROLEUM RESERVOIR MODELS

๐Ÿ“„ Project Material๐Ÿ“‹ 50 pages๐Ÿ“š Chapters 1โ€“5๐Ÿ’พ MS-Word & PDF

Chapters 1โ€“5 ย |ย  โ‚ฆ5,000

Download Complete Project Now

ABSTRACT

ย 

Techniques in Geostatistics are increasingly being used to generate reservoir models and quantify uncertainty in reservoir properties. This is achieved through the construction of multiple realizations to capture the physically significant features in the reservoir. However, only a limited number of these realizations are required for complex fluid flow simulation to predict reservoir future performance. Therefore, there is the need to adequately rank and select a few of the realizations for detailed flow simulation.

ย 

ย 

This thesis presents a methodology for building and ranking equiprobable realizations of the reservoir by both static and dynamic measures. Sequential Gaussian Simulation was used to build 30 realizations of the reservoir. The volume of oil originally in place, which is a static measure, was applied in ranking the realizations. Also, this study utilizes Geometric Average Permeability, Cumulative Recovery and Average Breakthrough times from streamline simulation as the dynamic measures to rank the realizations. A couple of realizations selected from both static and dynamic measures were used to conduct a successful history match of field water cut in a case study.



CHAPTER ONEย โ€“ย INTRODUCTION

ย 

ย 

ย 

1.1ย ย ย ย ย ย ย ย PROBLEM DEFINITION

ย 

ย 

In Geostatistical reservoir characterization, it is a common practice to generate a large number of realizations of the reservoir model to assess the uncertainty in reservoir descriptions for performance predictions. However, only a limited fraction of these models can be considered for comprehensive fluid flow simulations because of the high computational costs. There is therefore the need to rank these equiprobable reservoir models based on an appropriate performance criterion that adequately reflects the interaction between reservoir heterogeneity and flow mechanisms.

ย 

Most techniques used in ranking of realizations are based on static properties such as highest pore volume, highest average permeability, and closest reproduction of input statistics. The drawback of these simple techniques is that they do not account for dynamic flow behavior which is very essential in predicting future reservoir performance.

ย 

ย 

This thesis work seeks to build and rank equally probable representations of the reservoir using petrophysical properties such as porosity, water saturation, and permeability. The multiple reservoir descriptions are ranked using both static (Stock tank oil originally in place) and dynamic (geometric average permeability, connected hydrocarbon pore volume, average breakthrough times and cumulative recovery) measures.

ย 

1.2ย ย ย ย ย ย ย ย OBJECTIVES

ย 

ย 

The main purpose of reservoir characterization is to generate a more representative geologic model of the reservoir properties. The objectives of this study are as follows.

ย 

In building a static representation of what a reservoir is most likely to be it is necessary to adequately capture the uncertainty associated with not knowing its exact picture. In the effort of capturing the uncertainty, this study focuses on generating multiple equiprobable realizations of the reservoir with each having unique static and dynamic properties.

ย 

Only a few number of the realizations generated could be carried on for complex flow simulation due to the computational cost. Usually ranking of the realizations to select a limited number are done by static means which do not capture the dynamic mechanisms essential to reservoir performance. Only few dynamic ranking measures are currently in use. This research work seeks to define new dynamic ranking criteria and compare them with existing criteria.

ย 

This Project is for You If:

Yes, This Is My Situation โ€” Send Me the Complete Material

Here's everything you get with the complete project package:

โœ”Chapters 1โ€“5 (Word & PDF)
โœ”Abstract & Table of Contents
โœ”References, Citation & Bibliography
โœ”Fully Editable Microsoft Word Format
โœ”Original, Plagiarism-Free Content
โœ”Instant Email Delivery
Complete package โ€”โ‚ฆ10,000โ‚ฆ5,000
Price may return to โ‚ฆ10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
Iโ€™ve Seen Enough โ€” Get Me This Project Material

What Other Students Are Saying

โ€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.โ€
Zina
Kenpoly
โ€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.โ€
Favour
Nekede
โ€œMy supervisor almost finished me ๐Ÿ˜ญ He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.โ€
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Petroleum Engineering Final Year Research Project Topics & Materials ยป

๐Ÿท Tags:BuildingRankingGeostatisticalPetroleum reservoir modelImpact of rankingGeostatistical analysisImportance of building

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered โ€” Download the Complete Project
Message us