iProject

AN ASSESSMENT OF GRAVEL PACKING METHODS USED IN THE PETROLEUM INDUSTRY

📄 Project Material📋 50 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

 

CHAPTER ONE

 

INTRODUCTION

 

Many reservoirs are comprised of relatively young sediments, which are so poorly consolidated that sand will be produced along with the reservoir fluids unless the production rate is reduced significantly. Sand production leads to many numerous production problems including erosion of down hole tubular, valves, fitting and surface flow lines, collapsed casing because of lack of formation support. Thus a means to eliminate sand production without greatly limiting production rates is desirable.

 

Sand production can be controlled using different methods but the method of utmost importance to this project is the mechanical method which basically involves the use of gravel pack (GRAVEL PACKING).

 

This method is considered the oldest and most effective sand   control mechanism. It is simply a down hole filter designed to prevent the production of unwanted sands which involves the placement of gravel across a perforated interval in the sand screen annulus and also in the perforation tunnel to prevent the influx of sand.

 

Inaccurate determination of gravel pack size, could lead to sand influx which could be detrimental to both the technical and economic aspect of production which is the overall objective of this project aimed at identifying means to selectively select appropriate gravel pack sizes from formation sands produced through sieve analysis to meet optimum sand control for maximum production without any detrimental effect to production hard wares.

 

In a gravel pack completion, sand that is larger than the average formation sand grain is placed between the formation and a screen or slotted liner with the aim of retaining most of the formation sand, but letting  very fine particles through it and be produced.

 

The two most common types of gravel pack completion are the inside casing gravel packing or internal gravel packing (IGP) and underreamed gravel pack or external gravel pack (EGP). The underreamed casing gravel pack provides better conductivity through the gravel but is limited to single zone completion.

 

 

 

1.1 AIMS AND OBJECTIVES

 

This project is aimed at

 

  1. To study   the various types of gravel packing methods  used in  the petroleum industry.
  2. To analyze sieve analysis data of formation sands gotten from OBEN13L in other to determine the appropriate gravel pack size used.
  3. To make conclusions on the state of OBEN WELL 13L on the basis of sieve data analysis and give possible recommendations.

 

 

 

1.2 SCOPE AND LIMITATION

 

The scope of this project is limited to the mechanical method  of sand control with more emphasis on the sieve analysis of formation sands gotten from OBEN13L.

 

 

 

 

 

1.3 METHODOLOGY

 

The method to be adopted for this project is the use of sieve analysis and sucier correlation to determine the gravel pack size to be used  for OBEN WELL 13 with formation sands gotten  from  the case study as mentioned above and useful information gotten from the internet, textbooks, petroleum journals. This method simply involves collecting core samples  and running them through different sieves with different opening sizes, usually sieves with larger openings at the top and sieves of smaller opening at the bottom and plotting each weight retained on each sieve against the sieve opening size to determine the average formation sand size which is used to find accurate gravel size using  sucier correlation.

 

 

 

 

 

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Petroleum Engineering Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us