DESIGN AND FABRICATION OF A MOBILE DEEP FREEZER
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | 3 orders. | Marked useful: 5,147 times
INSTANT PROJECT MATERIAL DOWNLOADThis material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
INVESTIGATION OF THE EFFECT OF MOULDING SAND (NATURAL & SYNTHETIC) ON CASTING OF FLANGE USING ALUMIN...
ABSTRACT This study tend to investigate the effect of synthetic and natural moulding sand on casting of flange like component. In this study FUTA lo...More »
Item Type: Project Material | 50 pages | 14,003 engagements |
- 2.
DESIGN AND FABRICATION OF AN OFFICE FILE CABINET
ABSTRACT This project covers the design and fabrication of an office file cabinet. The cabinet is to keep and secure files and document for future rec...More »
Item Type: Project Material | 50 pages | 12,762 engagements |
- 3.
DESIGN AND FABRICATION OF MECHANCIAL LAWN MOWER
ABSTRACT Mechanical engineering department of the named institute has many non operational machines sequel to this fact mainten...More »
Item Type: Project Material | 50 pages | 11,086 engagements |
- 4.
THE DESIGN AND CONSTRUCTION OF HOT PRINTING MACHINE
ABSTRACT Parameters on which clear prints depends were comprehensively investigated. The study revealed that clear print dep...More »
Item Type: Project Material | 50 pages | 8,844 engagements |
- 5.
THE CONSTRUCTION AND FABRICATION OF METAL BOOKSHEET
ABSTRACT In our society today reading and writing has taken its roll as a way of measuring human knowledge. Knowledge could only be obtain succe...More »
Item Type: Project Material | 50 pages | 8,556 engagements |
- 6.
REPAIR OF AIR CONDITIONER IN MECHANICAL ENGINEERING DEPARTMENT
CHAPTER ONE 1.1 AIR CONDITIONER Indoor climate, once adjusted to human need only by opening of heating in winter and by open...More »
Item Type: Project Material | 50 pages | 8,679 engagements |