iProject

CONSTRUCTION OF TWO FACE GAS BURNER CONSTRUCTION OF TWO FACE GAS BURNER

📄 Project Material📋 65 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

ABSTRACT

 

          This project which is on the design and fabrication of a two face gas burner is a brief exploration on the various ways and means of designing, construction, operating the two face gas burner, putting cost into consideration for economic advantage.  Herein are brief information and literature on gas burner.  The properties of the constructional feature and their preference in construction are described.  The combustion reaction resulting to the heat liberated is also given.  Also, the practical approach in making the construction of a two face gas burner up to this standard is also given and recommendation to improve on the standard is also included in this report.

 

 CHAPTER ONE

 

1.1            INTRODUCTION

The construction of a two-face gas burner as a project topic that we embark upon become necessary as a way of way of putting into application the engineering and technological knowledge acquired so far. It is a starting point of actualizing a functional technology in the country. Irrespective of the fact that there are several breads of gas burners in the market, especially the ones imported, we deemed it necessary to work further on it as a way of modifying the brand with cast not left out in such modification.  

 

1.2     LITERATURE REVIEW

          The development of simple gas burner started in the eighteen countries when people began to use coal gas for burning. The application was fast put into practice by William Mulock who designed the simple gas cooker to be used in his office, home and workplace

          The first experimental gas cooker was made and in use in 1850. The improvement of this has multiplied greatly and is up to date widely used in homes, restaurants and large catering establishments. The different types of gas cookers available in the in the market are based on skills and techniques of the designer or producer.

          Based on the nature of energy supply, some gas cookers are made up of combustion devices of an electric heating element. The well-constructed ones are properly adapted and form an integral combustion of which of which they generate and utilize heat. It is often quite different to draw a line where heat generation stops and where heat utilization starts in a fuel forced cooker. That is the fuel fired cooker being on the pack in the market these days.

          The releasing of heart starts with mixture of air and fuel gas in the nozzle and combustion of the mixture to release heart takes place at the burner.

 

1.3     SPECIFICATION OF PROBLEM

          In the course of fabricating the two-face gas burner, as a copied project with some propose modification, some condition which ought to be met are found as a standard of comparison with the already existing ones. This posed a difficulty in the course of this construction. Since choice between already existing gas cooker lies on service available, durability, connivance cost.

          The following specifications were considered a problem when we started the design.

1.     PORTABILITY.

How to fabricate a two-face gas burner that will occupy the minimum space in the kitchen was a problem. A two-face gas burner that is easily to be met in met in our design.

2.                 To construct a two-face gas burner that will be safe to any prospective user.

3.                 To constructs a two-face gas burner that will be easy to maintain and wise gas will be free from unpleasant smell.

4.                 To construct a two-face gas burner whose source of energy (fuel) will be local.

 

1.4            COMPONENT PARTS AND THEIR FUNCTIONS

1.                 Burner chamber

2.                 Linkage pipe

3.                 Hose

4.                 Gas Cylinder (containing gas valve)

5.                 Angle bar (material)

6.                 Control knob or valve

7.                 Connection pipe for gas flow

8.                 Nut

9.                 Rod.

THE BURNER: This being the main component where combustion takes place to release heat. There is gas delivery line, which leads to it in addition to an adjustment to control the rate of atmospheric air mixing with the natural gas

 

 

 

 

 

                                                                                                                                                                                                                                                                                                                                                                                                                          

                                                                                                                  

LINKAGE PILE:This is the pipe line through which natural gas flow to the burner. One is lined along the frame of the burner as seen. 

     

 

 

THE GAS CYLINDER:         This is the component of the gas burner that containing the gas fuel through which a hose as connected to the copper pipe of the burner through the gas passes to the burner for combustion.

 

 

 

 

 

THE ANGLE BAR:      This was used in constructing the frame of the gas burner.

 

 

HOSE:        This serves as a link between the copper tubing and the control value of the burner.

 

CONTROL KNOB OR VALVE:    It is a essential component of the gas burner and it is used to regulate the volume or amount of natural gas flowing to the burner.

                 

 

 

 

 

 

 

 

MILD STELL PLATEthis is used as a covering or a wall for the gas burner. It also serves as a seat for the values.

 

 

 

 

 

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Mechanical Engineering Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us