CHARACTERISATION OF SOME NIGERIAN COALS FOR POWER GENERATION

📄 Item Type: Project Material| 📋 65 pages| 📚 1–5 chapters| Amount: ₦5,000

CHARACTERISATION OF SOME NIGERIAN COALS FOR POWER GENERATION

📄 Project Material 📋 65 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now
ABSTRACT

Five coal samples from Odagbo (Kogi State), Owukpa (Benue State), Ezimo (Enugu State), Amansiodo (Enugu State) and Inyi (Enugu State) weresubjected to proximate analysis, ultimate analysis, calorific value determination, petrographic and thermogravimetric analysis to determine their suitability for power generation. Tests were carried out at the laboratories of Advanced Coal Technology, South Africa (now Bureau Veritas Testing and Inspections South Africa, BV-TISA) and the Institute of Applied Materials of the University of Pretoria. Based on analysis of results of tests carried out, Amansiodo coal is a bituminous, low sulphur and medium ash coal; while Owukpa coal is a sub-bituminous A, low sulphur, low ash coal rich in huminites. In addition, Odagbo coal is a sub-bituminous B, medium sulphur, low ash coal rich in huminites; Ezimo coal is a sub-bituminous C, low sulphur, high ash coal; while Inyi coal is a sub-bituminous C, low sulphur, high ash coal.Between Odagbo and Owukpa sub-bituminous coals, Owukpa has a lower ignition temperature (283.63oC) due to its higher volatile matter content (39.1%). However, Ezimo sub-bituminous coal, which has a lower volatile matter (31.1%) unexpectedly has the same ignition temperature as Owukpa (283.63oC) due to its higher liptinite content (7.2%) when compared with that of Owukpa (2.9%). The five (5) coal samples analysed can be used for power generation using circulating fluidised bed combustion (CFBC) technology due to its tolerance of a widevariety of coals and particle sizes. Amansiodo coal is suitable for power generation using pulverised coal combustion technology based on comparison of its gross calorific value (27.48MJ/kg), ash content (8.6%), inherent moisture content (5.4%), sulphur content (0.92%), etc with requirements published by coal-fired power plant operators. Gross calorific values, inherent moisture and contents of Odagbo, Owukpa, Ezimo and Inyi sub-bituminous coals make them largely suitable for pulverized coal combustion when compared with the coal fuel used for the Genessee Phase 3 power station in Canada. The ease of combustion of the coal samples in decreasing order is Odagbo, Owukpa, Inyi, Ezimo and Amansiodo. The ignition temperatures of the coals increase with decreasing volatile matter content, their calorific values are strongly correlated with the fixed carbon, elemental carbon, volatile matter and hydrogen contents in decreasing order.




CHAPTER ONE
INTRODUCTION
1.1                   Background of the Study
Access to energy, especially electricity, is a driving force for economic and social development (Samboet al., 2009). Energy is a key factor in industrial development and in providing vital services that improve the quality of life. Traditionally, energy has been regarded as the engine of economic progress. Limited access to energy is a serious constraint to development in the developing world, where the per capita use of energy is less than one sixth that of the industrialised world(IAEA, 2005).It is widelyaccepted that there is a strong correlation between socio-economic development and theavailability of energy.
The electricity demand in Nigeria far outstrips the current epileptic supply. Nigeria is faced with acute electricity supply problems, which is hindering its development notwithstanding the availability of vast natural resources in the country (Sambo et al., 2009). There are currently 23 grid-connected generating plants in operation in the Nigerian Electricity Supply Industry (NESI) with a total installed capacity of 10,396.0 MW and available capacity of 6,056 MW. Most generation is thermal based, with an installed capacity of 8,457.6 MW (81% of the total) and an available capacity of 4,996 MW (48% of the total). Hydropower from three major plants accounts for 1,938.4 MW of total installed capacity and an available capacity of 1,060 MW (KPMG Nigeria, 2013). 

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Instant Email Delivery
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project