HAZARD RESPONSE CAPABILITIES OF A SMALL COMMUNITY.

📄 Item Type: Project Material| 📋 85 pages| 📚 1–5 chapters| Amount: ₦5,000

HAZARD RESPONSE CAPABILITIES OF A SMALL COMMUNITY.

📄 Project Material 📋 85 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now

HAZARD RESPONSE CAPABILITIES OF A SMALL COMMUNITY: A CASE STUDY OF NIGERIA

Abstract

Shiroro dam is one of the three major hydroelectric dams built on River Kaduna in Niger State located in the northwestern part of Nigeria. The river flood plain downstream the dam has rich alluvial soils with great agricultural potentials and this has been the major pull factor for several local communities that settled in the area and engaged in farming as a means of livelihood. However, the downstream communities are exposed to flooding and other hazards related to their livelihood activities and living pattern. A study on rural hazards identification and vulnerability assessment was conducted in Gusoro and Gurmana villages of Shiroro Local Government Area at the downstream sector of Shiroro dam in February, 2012.

The study relied on direct field survey using the instruments of oral interview, questionnaire survey and field measurements for data collection. The results form data analysis indicated, among others, that the communities were exposed to floods, erosion and health hazards as well as the risk of building collapse and environmental degradation.Hazard Response

The local coping strategies of building concentration on higher grounds, construction of elevated footpaths and embankments were found to be primitive and unsustainable. The problems of high level of illiteracy, poverty and dependent population (about50%) as well as low or complete lack of access to safe drinking water, health facilities, basic infrastructure and credit facilities (18.1%) make the people highly vulnerable. Hazard Response The level of preparedness was low as there were no disaster management committees, local disaster management institutions and local disaster plan.

All these reduced community resilience and increased the vulnerability of the people. Hazard Response The study suggested the provision of basic facilities, vigorous awareness education and the institution of integrated community based disaster risk reduction programmes as practical measures for reducing the risk of disasters in the area.Hazard Response

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Delivery Within 24 Hours
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project