DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGEOVER SWITCH WITH INDICATOR

πŸ“„ Item Type: Project Material| πŸ“‹ 65 pages| πŸ“š 1–5 chapters| Amount: ₦5,000

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGEOVER SWITCH WITH INDICATOR

πŸ“„ Project Material πŸ“‹ 65 pages πŸ“š Chapters 1–5 πŸ’Ύ MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

ABSTRACT

This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v regulated DC power supply unit forms the first block whose output is fed to priority encoder and decoder block. The output of the BCD – Decimal decoder is used to select the phase in priority through a transistor driver stage and electromagnetic relay that activates contactors. The least prioritized phase is the Gen set which contains a circuitry that automatically starts and stops the Gen set. The system is realized with TTL chips market. LEDs and AC panel lamps are used to indicate the status of the system while a manual switch is used to demonstrate the mode of operation of the system.

CHAPTER ONE

INTRODUCTION

Industrial automation and control has contributed immensely to the high rate of the world’s technological growth. Power control and automation is a part of this field which is applied in virtually anywhere electrical power is used, generated or transmitted. Manual power change-over switches have been in existence and in different forms and shapes. 1959, the advent of microelectronics has paved way to modify the manually operated change-over switches. This project deals with the design and construction of automatic change-over switch with indicator. It eliminates the time and energy spent in operating the manual change – over and starting of Gen. Set. It is fully automated. It can be used in residential houses, offices and most importantly, in factories that required constant power supply. It has so many advantages over the existing ones/types.

BACKGROUND OF THE STUDY

This project work is embarked upon to eliminate nearly every shortcomings associated with the manually operated type to ensuring that it is fully automated.

This system is realized in several functional blocks all combined to form one functional system. The first block is a 3-phase MAINS regulated dc power supply unit that powers the overall circuit and acts as the input. The output of thin block is fed into a priority encoder (74147) which selects the most prioritized phase at a time. The third block is a BCD – to – DECIMAL Decoder (7442) used to decode the prioritized phase.

The fourth is the driver stage which comprises of NPN transistor that energizes the electromagnetic relay which switches the phase in priority. The Gen set switching section is achieved using the least prioritized phase. This section switches ON the Gen set when all the NEPA phases are low, OFF or faulty. Once the Gen set phase is selected, a switching transistor fires an SCR which conducts large battering current to the ignition coil of the Gen set. Panel indicators are used to show the status of the system.

1.2. AIMS AND OBJECTIVES OF THE PROJECT

The aims and objectives of this project is to:

Design and construct an automatic change-over switch with indicator that will switch load from the mains power supply (PHCN) power supply (Generator) with simplicity.

To introduce a circuitry that will sense power outage and at the same time sense fluctuationin the power supplied to the load at any point time.

SIGNIFICANCE OF THE PROJECT

Β Β This project eliminates the stress, time delay and other drawbacks in manually operated types. The project is modified to display the phase in use at a particular time using a single seven segment Display and its appropriate circuitry.

SCOPE OF THE STUDY

This project work was carried out primarily with the aim of solving the problem of manual change-over switch when there is need for changing to generator due to power failure from public power supply.

Also, the essence of this project work is to design and construct a 90A, 220V, 50Hz automatic change-over switch which will serve as a standby switch to generator when there is power outage.

Β Β Β LIMITATIONS OF THE PROJECT

Due to the principal operation of the device, it cannot switch two voltage supply once, during operation. So the power switching of the supplies depends on the state in which the device is, that means it can only be in an on or off state, so as to avoid voltage clashing which will lead to fire outbreak.

This Project is for You If:

  • βœ…You are writing your final year project for the first time and don't want to make costly mistakes
  • βœ…This is your exact topic, or very close to what your supervisor gave you
  • βœ…Your supervisor has rejected one or more chapters and you don't know what to fix
  • βœ…You are stuck on Chapter 3 or data analysis and nothing is making sense
  • βœ…Your deadline is close and you are still far behind
  • βœ…You can't find enough materials anywhere for your topic
  • βœ…My project supervisor is very strict and I don't want to have any problem with my project work β€” I need a well structured and referenced project
  • βœ…I saw my school project requirement and I am confused on where or what to do
  • βœ…Everyone in my class has submitted their project and I haven't even started yet
  • βœ…My supervisor rejected my research methodology and I don't know what to do
  • βœ…I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • βœ…I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • βœ…I am combining school with work and I genuinely do not have the time to write everything from scratch β€” I just need something to work with
  • βœ…My supervisor changed the topic I wanted and approved another one β€” I am confused on where to start from
  • βœ…I am scared of submitting something that will be flagged for plagiarism β€” I need something original that I can use as a proper guide
  • βœ…I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • βœ…This is not my first time doing this project β€” I have carried it over before and I cannot afford to do it again
  • βœ…I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation β€” Send Me the Complete Material

Here's everything you get with the complete project package:

βœ”Chapters 1–5 (Word & PDF)
βœ”Abstract & Table of Contents
βœ”References, Citation & Bibliography
βœ”Fully Editable Microsoft Word Format
βœ”Original, Plagiarism-Free Content
βœ”Instant Email Delivery
Complete package β€”₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough β€” Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered β€” Download the Complete Project