A SEMINAR REPORT ON CIRCUIT BREAKERS
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: 65 pages | 1-5 chapters | Amount: ₦5,000 | 2 orders. | Marked useful: 6,205 times
Delivery: Within 24 hoursABSTRACT
This contribution provides an overview on the common on-site test methods to ensure the safe and reliable operation of circuit breakers used in high and medium-voltage power systems. Failures on circuit breakers can generally be ascribed to defects in one or more of the three main components: The operating mechanism incl. mechanical linkage, the electrical control circuits and the components at system voltage. Therefore, detecting wear and tear processes in these components of the circuit breaker during scheduled maintenance procedures reduces the risk of failures during operation. The standard on-site testing practices include timing, travel and coil current signature measurements to assess the integrity of the kinematic chain and control circuits. In addition, micro-ohm measurements are performed on the breaker’s main contacts. This paper discusses the advantages and disadvantages of these standard practices and how to interpret measurement results. Furthermore advanced testing methods are introduced that can easily be applied using the latest testing technology.
This material content is developed to serve as a GUIDE for students to conduct academic research
Delivery: Within 24 hours
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
IMPACT OF FORMAL EDUCATION ON COMMUNITY DEVELOPMENT IN OREDO LOCAL GOVERNMENT, EDO STATE
ABSTRACT The broad objective of this study is to examine the impact of formal education on community development in Oredo Local Government, Edo State....More »
Item Type: Project Material | 54 pages | 4,754 engagements |
- 2.
CONSTRUCTION OF CRITICAL TEMPERATURE ALARM SYSTEM
ABSTRACT The term “critical point” is sometimes used to denote specifically the vapour liquid critical point of a material. The vapour liquid ...More »
Item Type: Project Material | 46 pages | 11,317 engagements |
- 3.
THE CONSTRUCTION OF LABORATORY EQUIPMENT FOR THE DETERMINATION / INVESTIGATION OF ELECTRICAL INSULAT...
ABSTRACT Insulation deterioration occurs on power system when insulators are subjected to abnormal stresses. Since insulators cannot resist indefinite...More »
Item Type: Project Material | 31 pages | 7,532 engagements |
- 4.
CONSTRUCTION OF 2000W AUTOMATIC VOLTAGE REGULATOR
ABSTRACT This project is all about Automatic Voltage Regulator (AVR), and is a circuit that monitors the input voltage at any point and display the re...More »
Item Type: Project Material | 50 pages | 11,003 engagements |
- 5.
DESIGN AND CONSTRUCTION OF AN ELECTRICAL ROBOTIC TRAIN;THE CONTROL SYSTEM DRIVE(COMPATIBILITY MODE)
1.0 Introduction A robot is a computer controlled machine that can be programmed to move, manipulate objects and accomplish work w...More »
Item Type: Project Material | 34 pages | 8,047 engagements |
- 6.
THE ELECTRICAL DESIGN AND INSTALLATION REQUIREMENT FOR A MEGA FILLING STATION
ABSTRACT A mega filling station can be described from its name –MEGA; which means larger in size. This implies that mega filling station is a lar...More »
Item Type: Project Material | 55 pages | 12,815 engagements |