iProject

THE IMPACT OF PROJECT BASED LEARNING ON ACADEMIC ACHIEVEMENT

📄 Project Material📋 50 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

 

CHAPTER ONE

 

INTRODUCTION

 

1.1   BACKGROUND TO THE STUDY

 

Considerable empirical evidence exists that when students drop out of high school, the economic and social health of America is jeopardized. Dropouts are likely to be dependent on public assistance, engage in criminal activities, and experience health problems (Muennig, 2007; Rumberger, & Thomas, 2000; Waldfogel, Garfinkel, & Kelly, 2007). Much of the attention on dropouts has focused on high schools and their efforts to build and sustain high levels of student engagement in school and learning through innovative practices (Finn, 1993; Marks, 2000). However, as Orthernr, Cook, Rose and Randolph (2002) reported, many students do not have access to these innovative efforts because they disengage from their education well before high school. In fact, “the social-psychological and behavioral disengagement from school that leads to dropping out often begins in middle school” (Orthernr, Cook, Rose, & Randolph, 2010, p. 223). Equally concerning are the difficult transitions middle school students experience and the impact of such transitions on standardized test scores. Randolph, Fraser and Orthner (2006) reported that if students experienced difficult transitions from fifth to sixth grade, their math and reading scores significantly declined. On one hand, adolescents, ages 10-15, go through rapid change and are vulnerable to their emotions (Johnson, 2012). Johnson goes on to say, they are fun, excited about life, sensitive, overwhelmed and in turmoil. Their emotions are high and logic rarely prevails. Friends begin to replace parents and peer acceptance, socialization, appearance and body image are everything. The middle school student continuously tests and breaks the rules but needs boundaries. They demand independence but seek the reassurance of love and caring from adults. The middle school student is a conflicted human being. On the other hand, we know little of how middle schools are approaching these student behaviors amidst standardization. Evidence exists that intervention programs aimed at over-age middle school students help students back on track for on-time graduation (Finnan & Kombe, 2011). These accelerated programs help students develop confidence through academic accomplishments, a sense of belonging and engagement in the classroom. However, with these types of intervention programs limitations exists because they rarely include preparing students for experiences outside of the classroom and as a contributing member of society. Furthermore, academic accomplishments do not necessary translate to whether a student is able to apply what he or she has learned to his or her daily life. As Dewey suggested, it is important to consider whether educational experiences isolate the student from life experiences. Others, such as Richardson (2012), suggested a shift in curriculum and pedagogy to allow for personalized learning experiences that allow students to connect his or her passions and interests as learners with society expectations. It is with this understanding that led the South Texas district in this study to adopt Project-Based Learning (PBL).

 

Project-based learning is a strategy used for engaging students in active and responsible learning. Students participated in an extended process of inquiry in response to a complex question, problem, or challenge, and students who otherwise found school boring or meaningless were motivated to learn. Project-based learning motivated students to engage in their own learning and offered them the opportunity to pursue their own interests as they made decisions to solve real problems (Buck Institute for Education, 2011; Harada, Kirio, & Yamamoto, 2008). Researchers conducted studies over the last two decades that confirmed student engagement and motivation lead to higher academic performance (Brewster & Fager; Anderman & Midgley & Lumbsden).

 

Previous studies have demonstrated that using project-based learning had impacted student achievement in a multiplicity of ways. For the purpose of this study, the researcher was concerned with investigating the attributes or pedagogies within projectbased learning that impacted student with low academic achievement. Just learning about things, did not enable students to acquire the abilities, and understanding they needed for 21st century applications, rather,they needed new pedagogies of engagement that were meaningful, and resourceful for them to apply in the real world (Buck Institute for Education, (2011). In addition, studies have shown that enhancements to project-based learning such as computer technology, cooperatives, other technology tools, attributes such as motivation, and attitudes to work, provided meaningful learning and increased interest (Edgerton) as cited in Smith, Sheppard, Johnson, & Johnson (2005). Extensive research was conducted on cooperative learning where small groups were used to maximize students’ learning (Smith et al., 2005). Technology enhancements to project-based learning were widely researched as well. The benefits of project-based learning were enhanced when technology was used (Edutopia, 2001). The researcher, however, used the grounded theory process to provide information on enhancements for analysis.

 

Previous studies have demonstrated that using project-based learning had impacted student achievement in a multiplicity of ways. For the purpose of this study, the researcher was concerned with investigating the attributes or pedagogies within project based learning that impacted student with low academic achievement. Just learning about things, did not enable students to acquire the abilities, and understanding they needed for 21st century applications, rather, they needed new pedagogies of engagement that were meaningful, and resourceful for them to apply in the real world (Buck Institute for Education, (2011). In addition, studies have shown that enhancements to project-based learning such as computer technology, cooperatives, other technology tools, attributes such as motivation, and attitudes to work, provided meaningful learning and increased interest (Edgerton) as cited in Smith, Sheppard, Johnson, & Johnson (2005). Extensive research was conducted on cooperative learning where small groups were used to maximize students’ learning (Smith et al., 2005). Technology enhancements to project-based learning were widely researched as well. The benefits of project-based learning were enhanced when technology was used (Edutopia, 2001). The researcher, however, used the grounded theory process to provide information on enhancements for analysis.

 

 

 

1.2     STATEMENT OF THE PROBLEM

 

Implementation research consists of studies designed to describe and inform the processes of planning and enactment of Project-Based Learning. Typically, implementation research involves observation, questionnaires, and interviews intended to identify difficulties encountered by participants with different aspects of the planning or enactment process. Implementation research is also referred to as formative evaluation and can be focused on a variety of participants (e. g., teachers, students, administrators, parents), factors (e. g., classroom factors, external factors, supports), and contexts (e. g., planning, working with others, enacting, troubleshooting, assessing).

 

More specifically, students tended to pursue questions without examining the merits of the question, they tended to pursue questions that were based on personal preference rather than questions that were warranted by the scientific content of the project, they had difficulty understanding the concept of controlled environments, they created research designs that were inadequate given their research questions, they developed incomplete plans for data collection, they often failed to carry out their plans systematically, they tended to present data and state conclusions without describing the link between the two, and they often did not use all of their data in drawing conclusions.

 

 

 

1.3     OBJECTIVE OF THE STUDY

 

The main objective of this study is to investigate the impact of project based learning on academic achievement of secondary school students, specifically the study intends to:

 

1.     Find out the positive impact of project based learning on the classroom performance of the teacher

 

2.     Discover the factors that influence students’ academic behavior

 

3.     Find out the significance impact of project based learning on the academic achievement of the students

 

 

 

1.4     RESEARCH QUESTIONS

 

The following research questions was formulated to guide this research arrive at a valid conclusion:

 

1.     What is the positive impact of project based learning on the classroom performance of the teacher

 

2.     What are the factors that influence students’ academic behavior

 

3.     Is there any significance impact of project based learning on the academic achievement of the students

 

 

 

 

 

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Education Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us