THE IMPLEMENTATION AND DESIGN OF COMPUTERIZED INVENTORY CONTROL SYSTEM

πŸ“„ Item Type: Project Material| πŸ“‹ 50 pages| πŸ“š 1–5 chapters| Amount: ₦5,000

THE IMPLEMENTATION AND DESIGN OF COMPUTERIZED INVENTORY CONTROL SYSTEM

πŸ“„ Project Material πŸ“‹ 50 pages πŸ“š Chapters 1–5 πŸ’Ύ MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

CHAPTER ONE i

1.0 Introduction 1

1.1 Background of the Study 2

1.2 Statement of the Problem 3

1.3 Purpose of the Study 4

1.4 Significance of the Study 4

1.5 Objectives of the Study 4

1.6 Scope of the Study 5

1.7 Limitations of the Study 6

1.8 Definition of Basic Concepts 6

CHAPTER TWO

2.0 Literature Review 9

2.1 Comprehensive Overview 9

2.1.1 Purpose 10

2.2 Types of Inventory Control Systems - - - - 10

2.2.1 Four types of inventory control systems - - - - 11

2.2.1.1 Manual Inventory Management System - - - 11

2.2.1.2 Barcode Technology 12

2.2.1.3 Radio Frequency Identification (RFID) - - - 13

2.2.1.4 Warehouse Management System - - - - 14

2.3 How Inventory Control Systems Really Work - - 16

2.4 What Industries Use Inventory Control Systems - - 19

2.4.1 Application of Inventory Control Systems - - - 20

2.4.2 Importance of Inventory Control Systems - - - - 21

2.5 Warehouse Management Systems - - - - 22

2.5.1 Warehouse Management Rules Engine - - - 24

2.5.1.1 Rules Workbench 25

2.5.1.2 Warehouse Management System Strategy - - - 25

2.5.2 Importance of Warehouse Management Systems - - 25

2.5.3 Inventory Control Systems vs. Warehouse Mgt Systems - 27

2.6 Automated Inventory Control System Software - - - 28

CHAPTER ONE

1.0 INTRODUCTION

An inventory control system contains a list of orders to be filled and then prompts workers to pick the necessary items, and provides them with packaging and shipping information. Inventory control may be used to automate sales order fulfilment process and also manage in and outward material of hardware. Automation is the replacement of human workers by technology. For optimal sales and inventory management process, robust functionality is needed for managing logistics facilities. Warehouse management functions for inventory control cover internal warehouse movements and storage and its support helps in the recording and tracking of materials on basis of both quantity and value.

This application takes care of all supply orders reducing cost for warehousing, transportation while improving customer service. It significantly improves inventory turns, optimizes flow of goods. It also improves cash flow, visibility and decision making providing efficient execution of tasks using this fast and reliable computerised method

1.1 BACKGROUND OF THE STUDY

The Nigerian Breweries PLC was established in the year 1946. It aims at providing satisfaction and nourishment to the Nigerian population through the distribution of drinks like beer, coca-cola, fanta, sprite etc. It is second to none and for this reason, the demand is high and the company responds to the increasing demand by stabilizing supply to strike a balance.

Justifiably, the company has the problem of keeping adequate record of goods transfer and since it is done manually, associated problems of insecurity, high cost of operation and delay in supply arise. Data processing in Nigerian Breweries PLC is presently carried out using people, pens, and paper to control stock and inventory.

The design and development of a computerizedinventory control system for the Nigerian Breweries PLC will no doubt bring immeasurable relief from the problems associated with the manual system.

1.2 STATEMENT OF THE PROBLEM

The Nigerian Breweries PLC is to an extent manually operated and reveals a number of problems.

The recording of sales and cash received are done manually on a book that appears rough. Thus, the books are exposed to physical damage, information can be lost and dust particles are accumulated.

The long list of supply orders waiting to be attended to on daily basis.

The control system is time consuming, less accurate and less efficient, and the environment is not user friendly.

Inaccuracies often ensue from human error.

The manual system is quite tedious and can be reduced or eliminated with the introduction of the proposed system.

1.3 PURPOSE OF THE STUDY

The purpose of this study is to improve current operational process in the Nigerian Breweries PLC to its full capacity by developing efficient computer software that can handle inventory in a computerised fashion.

1.4 SIGNIFICANCE OF THE STUDY

This study is primarily aimed at increasing efficiency in operations, reducing maintenance and running cost, monitoring the supply of goods and its distribution and increase profit in the Nigerian Breweries PLC by introducing a computerizedinventory control system.

1.5 OBJECTIVES OF THE STUDY

The main objective of this study is to develop a computerised inventory control management system. Others include;

i. It provides total asset visibility.

ii. It allows reduced inventory stocking levels giving full inventory history.

iii. It reduces lead time, shelf space, and errors due to damage, fatigue of staff and overall cost of operations.

iv. It facilitates β€œjust in time” deliveries.

v. It provides full process control for products.

vi. It provides higher level security as the system would be passworded to prevent unauthorised access.

vii. It shortens cross docking time and speeds up sort/pick up rate.

viii. It helps the management plan, monitor, optimize resources and ascertain their financial position at any time.

1.6 SCOPE OF THE STUDY

The scope of this study covers the Nigerian Breweries PLC as a whole, and its customers which include retailers, distributors and the general public.

1.7 LIMITATIONS OF THE STUDY

This project was constrained by the following factors:

(a) Financial Constraints

Bearing in mind the economic state of the nation, it was found difficult in making both ends meet, because of the exorbitant nature of things nowadays in travelling for the collection of data needed for the project.

(b) Time Constraints

Looking at the interval between the resumption and vacation of the final semester for the project to be completed, the time given seemed to be short for the collection of required information for better work to be done.

(c) Non-Availability of Material

During this project, it was noticed that the required materials needed for the project are not documented. Those that were documented lacked storage facilities where they can be reached.

1.8 DEFINITION OF BASIC CONCEPTS

Automation: This is the use of technology or computers to control and process data reducing the need for human intervention.

Database: This refers to a large store of related data on a computer that a user can access and modify.

Password: This is a secret code that must be entered into a computer to enable access to its applications. It is made up of numbers, letters, special characters or a combination of any of the above categories.

Inventory Control System: A list of orders to be filled, and prompts workers to pick the necessary items and provides them with packaging and shipping information.

Computerization: This is the conversion of a manually operated system to a controlled, organized and automated system.

Research: A careful study of a subject to discover facts, establish a theory or develop a plan of action based on the facts discovered.

System: A set of computer components functioning together.

Technology: The study of techniques of mobilizing resources such as information for accomplishing objectives that benefit man and his environment.

Software: A computer program or set of instructions that direct a computer to perform processing functions.

Information System: A collection of procedures, people, instructions and equipment to produce information in a useful form.

Processing: This is dealing with something according to an established procedure.

This Project is for You If:

  • βœ…You are writing your final year project for the first time and don't want to make costly mistakes
  • βœ…This is your exact topic, or very close to what your supervisor gave you
  • βœ…Your supervisor has rejected one or more chapters and you don't know what to fix
  • βœ…You are stuck on Chapter 3 or data analysis and nothing is making sense
  • βœ…Your deadline is close and you are still far behind
  • βœ…You can't find enough materials anywhere for your topic
  • βœ…My project supervisor is very strict and I don't want to have any problem with my project work β€” I need a well structured and referenced project
  • βœ…I saw my school project requirement and I am confused on where or what to do
  • βœ…Everyone in my class has submitted their project and I haven't even started yet
  • βœ…My supervisor rejected my research methodology and I don't know what to do
  • βœ…I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • βœ…I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • βœ…I am combining school with work and I genuinely do not have the time to write everything from scratch β€” I just need something to work with
  • βœ…My supervisor changed the topic I wanted and approved another one β€” I am confused on where to start from
  • βœ…I am scared of submitting something that will be flagged for plagiarism β€” I need something original that I can use as a proper guide
  • βœ…I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • βœ…This is not my first time doing this project β€” I have carried it over before and I cannot afford to do it again
  • βœ…I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation β€” Send Me the Complete Material

Here's everything you get with the complete project package:

βœ”Chapters 1–5 (Word & PDF)
βœ”Abstract & Table of Contents
βœ”References, Citation & Bibliography
βœ”Fully Editable Microsoft Word Format
βœ”Original, Plagiarism-Free Content
βœ”Instant Email Delivery
Complete package β€”₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough β€” Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

🏷 Tags: Computerized inventory control system Impact of computerized inventory control system Relevance of computerized inventory control system Evaluation of computerized inventory control syste Optimization of computerized inventory control sys

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered β€” Download the Complete Project