DESIGN AND IMPLEMENTATION OF A COMPUTERIZED STADIUM MANAGEMENT INFORMATION SYSTEM

📄 Item Type: Project Material| 📋 55 pages| 📚 1–5 chapters| Amount: ₦5,000

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED STADIUM MANAGEMENT INFORMATION SYSTEM

📄 Project Material 📋 55 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

CHAPTER ONE

BACKGROUND OF THE STUDY

1.1     INTRODUCTION

The advent of computer Technology has brought relief to repetitive tasks and has helped in the better management and origination of data.  Information management system can be applied to any system that facilitates storage, management and retrieved of data and information required for some particular application within a computer system.  This makes it easier for data to be handled or managed.

The stadium staffs have been finding it so difficult to manage information for example, in the existing system where everything is processed manually,  the operators find it difficult to store, locate or retrieve information when necessary.  Also the issue of crowd control and ticketing, which is needed in events to generate income for the sector.  Processing ticket for an event manually can be costly, time – consuming and waste ticket stock which is always encountered in some event due to the excess ticket processed manually.

          The computer system can be used in so many ways in the stadium, for example, crowd control, processing of ticket for an event, managing office files and so on.

          This work concentrates on the computerized ticket, crowd control, information management in the stadium and facility management.  With the aid of computer system, the data will be properly managed, organized and construction of a suitable program that will help in the management of stadium.

1.2     STATEMENT OF THE PROBLEM

          Following the problem encountered in the organization, tickets that are processed for an event and the end, there will be left over (waste ticket stock) which create loss in the finance of the stadium unable to communicate with one another in other to share information which leads to time-consuming, re-entering of information and lack of centralized system for customer information.

1.3     OBJECTIVES OF THE STUDY

          This work is aim to reduce the work of stadium operators,  managers, and individuals.  Furthermore, the aim of this work it to.

  1. study the present way of processing ticket.
  2. Design a new system that will be more convenient and efficient, which will take care of difficult encountered in the present system.
  3. Design a new system that will enable the organization control crowd in every events.
  4. Design a system that will make access to record or information easier.

1.4     SCOPE OF THE STUDY

          There are lot of activities that takes place in the stadium an example is the processing of ticket and management of information.  This research will base on a computerized management information system in the stadium.

1.5     LIMITATIONS OF THE STUDY

          The following constraints were experienced during the course of the research.

a        Time Constraint

          Due to the shortness of the semester and other activities within the school, there was no much time to carryout more research.

b        Lack of Money

          The issue of going from one place to another in search of materials relevant to the work calls the attention of monetary problems which limit the cost of this research.

1.6     SIGNIFICANCE OF THE STUDY

          The significance of this research is to help the staffs attain excellence, accurancy, and effectiveness in the data or information with aid of an information management system.

  1. ASSUMPTION

The design of the system is assumed to be cost effective bt beneficial to stadium.  The design will reduce the problem facing staff or operators of the organization.

1.8     DEFINITION OF TERMS

Data – It is a law fact or it is an unprocessed information.

Information – They are data that has been processed and ready for use.

Management – It is the bringing together of resources and people for the

accomplishment of a specific goal.

Information Management – It is the organization and management of related

data within a system.

Information Retrieval – It is the method used in recovering specific information.

Maintenance – It is a way of taking care of facilities in an organization

Record – It is the collection of related fields raw data from within the

      organization.

Input – I is the capacity or collecting of raw data from within the organization.

Output – It is the transfer of processed information to the people or activities

      where it will be used.

Processing – This is the converting of raw data into a more meaningful form.

Information system – It is defined as a set of interrelated components that collect (or retrieve), process, store, and distribute information to support decision making and control in an organization.

Stadium – It is a place set aside for sport activities.

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Instant Email Delivery
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project