iProject

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED STADIUM MANAGEMENT INFORMATION SYSTEM

📄 Project Material📋 55 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

CHAPTER ONE

 

BACKGROUND OF THE STUDY

1.1     INTRODUCTION

The advent of computer Technology has brought relief to repetitive tasks and has helped in the better management and origination of data.  Information management system can be applied to any system that facilitates storage, management and retrieved of data and information required for some particular application within a computer system.  This makes it easier for data to be handled or managed.

The stadium staffs have been finding it so difficult to manage information for example, in the existing system where everything is processed manually,  the operators find it difficult to store, locate or retrieve information when necessary.  Also the issue of crowd control and ticketing, which is needed in events to generate income for the sector.  Processing ticket for an event manually can be costly, time – consuming and waste ticket stock which is always encountered in some event due to the excess ticket processed manually.

          The computer system can be used in so many ways in the stadium, for example, crowd control, processing of ticket for an event, managing office files and so on.

          This work concentrates on the computerized ticket, crowd control, information management in the stadium and facility management.  With the aid of computer system, the data will be properly managed, organized and construction of a suitable program that will help in the management of stadium.

 

1.2     STATEMENT OF THE PROBLEM

          Following the problem encountered in the organization, tickets that are processed for an event and the end, there will be left over (waste ticket stock) which create loss in the finance of the stadium unable to communicate with one another in other to share information which leads to time-consuming, re-entering of information and lack of centralized system for customer information.

 

 

 

1.3     OBJECTIVES OF THE STUDY

          This work is aim to reduce the work of stadium operators,  managers, and individuals.  Furthermore, the aim of this work it to.

  1. study the present way of processing ticket.
  2. Design a new system that will be more convenient and efficient, which will take care of difficult encountered in the present system.
  3. Design a new system that will enable the organization control crowd in every events.
  4. Design a system that will make access to record or information easier.

 

1.4     SCOPE OF THE STUDY

          There are lot of activities that takes place in the stadium an example is the processing of ticket and management of information.  This research will base on a computerized management information system in the stadium.

 

 

 

1.5     LIMITATIONS OF THE STUDY

          The following constraints were experienced during the course of the research.

a        Time Constraint

          Due to the shortness of the semester and other activities within the school, there was no much time to carryout more research.

b        Lack of Money

          The issue of going from one place to another in search of materials relevant to the work calls the attention of monetary problems which limit the cost of this research.

 

1.6     SIGNIFICANCE OF THE STUDY

          The significance of this research is to help the staffs attain excellence, accurancy, and effectiveness in the data or information with aid of an information management system.

 

 

 

  1. ASSUMPTION

The design of the system is assumed to be cost effective bt beneficial to stadium.  The design will reduce the problem facing staff or operators of the organization.

 

1.8     DEFINITION OF TERMS

Data – It is a law fact or it is an unprocessed information.

Information – They are data that has been processed and ready for use.

Management – It is the bringing together of resources and people for the

accomplishment of a specific goal.

Information Management – It is the organization and management of related

data within a system.

Information Retrieval – It is the method used in recovering specific information.

Maintenance – It is a way of taking care of facilities in an organization

Record – It is the collection of related fields raw data from within the

      organization.

Input – I is the capacity or collecting of raw data from within the organization.

Output – It is the transfer of processed information to the people or activities

      where it will be used.

Processing – This is the converting of raw data into a more meaningful form.

Information system – It is defined as a set of interrelated components that collect (or retrieve), process, store, and distribute information to support decision making and control in an organization.

Stadium – It is a place set aside for sport activities.

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Computer Science Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us