DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM

📄 Item Type: Project Material| 📋 51 pages| 📚 1–7 chapters| Amount: ₦5,000

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM

📄 Project Material 📋 51 pages 📚 Chapters 1–7 💾 MS-Word & PDF

Chapters 1–7  |  ₦5,000

Get Complete Project Material Now

DESIGN AND IMPLEMENTATION OF A COMPUTERIZED OFFICE INVENTORY SYSTEM

(A CASE STUDY OF N.B.C PLC 9TH MILE CORNER NGWO)

ABSTRACT

            This project is on design and implementation of a computerized office inventory system that is based on a system of valuation known as office system due to pluctuation of market price.  The project is also aimed at finding out how computer can be applied to office inventory system.

            The prevalent method of controlling inventory in most offices is manual method, which has a lot of set backs.  Such set backs include tedious ecorical worck, delay in transaction and time wastages in file assessment and accuracy of inventory record.  It is therefore of great importance to carry out this research aimed at finding out how computer can help to maintain efficient and accurate records of goods in stock, and also making updating easy, all at a fantastic speed.

            The information to this study is gotten through oral interview and record inspection of some offices.

            This enables one to get information about the old system and how the benefit the proposed system have over the one i.e. the cost benefit analysis matter.

TABLE OF CONTENTS

CHAPTER ONE

INTRODUCTION

1.1              Statement of the problems

1.2              Purpose of study

1.3              Aims and objectives

1.4              Scope of the study

1.5              Limitation of the study

1.6              Definition of terms

CHAPTER TWO

LITERATURE REVIEW

CHAPTER THREE

OVERVIEW OF THE EXISTING SYSTEM

3.1              Description of the existing system

3.2              Methods of data collection used

3.2.1        Interview method

3.2.2        Reference to written test

3.3              Organizational structure

3.4              Input analysis

3.5              Process analysis

3.6              Output analysis

3.7              Problem of the existing system

3.8              Justification of the new system

CHAPTER FOUR

DESIGN OF THE NEW SYSTEM

4.1              Output specification and design

4.2              Input specification and design

4.3              File design

4.4              Procedure chart

4.5              System flow chart

4.6              System requirement

CHAPTER FIVE

IMPLEMENTATION

5.1              Program design

5.2              Program flowchart

5.3              Psudo code

5.4              Source listing

5.5              Text run

CHAPTER SIX

DOCUMENTATION

CHAPTER SEVEN

CONCLUSION AND RECOMMENDATIONS

7.1              Conclusion

7.2              Recommendation

Bibliography

CHAPTER ONE

INTRODUCTION

            In an organization, it is very essential and need greater attention towards effort made to achieve and mandation an economic balance between the cost incurred and saved, by holding material in stock.

            This process can be obtained by ensuring that the acquisition, storage, handling and usage of raw material are fully controlled at all times.  This process is considered under the study of office inventory system which embraces, the total raw material to be used, work in progress and the stock counting of the finished goods.

            Inventory then means the measured amount of goods, which varies in quantity overtime in response to “demand” process, which operates to diminish the stock and an “repleshement” process, which operates to increase it.

            Due to fluctuating market prices of material in store, two system of valuation of issued of an inventory are adopted by most

Due to fluctuating market prices of material in store, two system of valuation of issued of an inventory are adopted by most organization periodic and office system, which was defined by new lexicon Webster dictionary as records maintained for a manufacturing  business so that, they show a continuous inventory of such items as raw materials and goods in process.

            For further  implementation of this study, reference will be made to offices when the problems faced with inventory management is proposed to be narrowed down with the aid of computer to make work easier and to achieve accurate results, when updating files and also assessment of files.

1.1              STATEMENT OF PROBLEM

Generally, in inventory system, some of the problem encountered in relation to office inventory system are considered in three stages.

(1)               The planning stage in how the raw material needed for production are gotten, what kind of raw materials needed too. 

(2)               Production stage

(3)               The finished goods product.  Before a product, the company or the organization encountered the problem of:

a)      Seeking for the consent of the marketing manager of the company on how profitable the particular product to be produced is in the market.

b)      Consumption pattern: This depends in the quality of the product, the quantity and the purchasing power.

c)      Problem of working off-take, this is the estimated quantity of product to be produced at a given period in time problem.

d)     Head – time problem.

e)      Not providing a competent coverage for the raw materials ordered for.

f)       Purchase of sub-standard materials, which could result to wastage and low quantity product, damaging of machine and will eventually affect the profitability of the organization.

g)      Having an unrealistic supplier.

(2)               PROBLEM ASSOCIATED WITH THE PRODUCTION

(1)               The percentage permulation of the product, it should not be determined by assumption.

(2)               Individual mistake

(3)               Not putting the shelf of the product into consideration

(3)        PROBLEM ASSOCIATED WITH THE FUNISHED GOODS.

(1)               The order level of the production or stock level or consumption.

(2)               The price of the product:  It depends on the availability of capital and the opportunity to acquire item at low price.

(3)               The risk of obsolenscence and determination.

(4)               The cost of stage and space available.

(5)               Insurance cost

(6)               Government regulation

(7)               Transport cost.

(8)               Improper stock counting

1.2              THE PURPOSE OF THE STUDY

The purpose of this study is to minimize the numerous setback associated with manual system of inventory system.  These setbacks, tends to diminish the progress of many companies.

This project also serves, as a motivator to many organizations or companies by exposing the greeter advantages computer can be if effectively implemented.

 Furthermore no major categorization of staff activity exists in the inventory system. However to appreciate how system carries out this functions to meet it’s set objectives various activities that take place in the system are described below:-

1.         The pre-order activities

2.         The order activities

3.         The receiving and checking activities

4.         Storing and distribution

5.         File updating

6.         Accounting and report activities.    

1.3       OBJECTIVE OF THE STUDY

The main objective of  this study is to maintain adequate stick level of the product by ordering acquiring and issuing while avoiding stoppages and consequent and increase cost of emergency action. And also relieve the management of the organization taking decision for  every items carried in stock

1.         Receive and process request for materials needed for the products.

2.         Select relevant items needed for the product for ordering

3.         Ensure that orders are dispatched for immediately after completion for prompt supply of items

4.         Maintain a regular supply of raw materials of reasonable price and quantity and of a good quantity 

5.         Ensure the follow up of ordered item when they are over due.

6.         The take of necessary action on the arrival of ordered items

7.         Prepare for payment of all items acquired by the company  

8. keep current  records of the event occurring within the system. 

9. Compile a continuous report of the activities carried out during the specified period.

10.  Ensure that the various unit including the production unit stock unit and  ware house receives the request on time.

1.4              THE SCOPE OF THE STUDY

In actual sense the scope of the problem of this study is narrowed down to ordering, stocking and delivering of the product out to customers and also the accounting and reporting of  expenditure for all ordered and delivering made so find it reasonable to have the research to office inventory on stock of goods.

1.6       DEFINITION OF TERMS

INVENTORY:- it mans the aggregate of those items of tangible personnel property which are:

Held for sale in the ordinary cause of business.

In process of production for such sale. To be errantly consumed in production of goods or services to be available for sale.

OFFICE INVENTORY:- A system of accounting for merchandise that provides a continuous record showing the Quantity and cost of all goods on hand. Also it is a carnival operation involving computing the theoretical balance after each issues of receipt

COVERAGE:- Frequently  used interchangeably with the word protection” or” insurance”. The extent the insurance afforded under an insurance contract.

ORDER:- A written instruction or commission to do something such as buy sell negotiate or supply.

COMPUTER:- Thisis an electronicsmechanical device that accepts input process it and relinquishes information at a fantastic rate.

UPDATING:- this is the process of adding and altering a master file so that it process a arrant status.

MINIMUM LEVEL:- it isotherwise called the buffer stock it is set by the rate of consumption recorder level and lead-in-time and at this point stock will not be allowed to fall.

MAXIMUM LEVEL:- this is the stock level which must not be exceeded at all time and it is determine by the rate of consumption reorder level and lead-in-time (delivering time)

LEAD-IN-TIME:-The time between when items are ordered and when they arrived and are available for us.

FILE:- A collection of related records

SHELF LIFE:- the duration a practical or production can stay before it expires

ECONOMIC ORDINARY QUALITY:- this is a calculated reorder quality which immunize the balance of cost between caring cost and ordinary cost.

PLANT:- A restricted sense building as the term “plant and equipment also machinery use for manufacturing process.

This Project is for You If:

  • ✅You are writing your final year project for the first time and don't want to make costly mistakes
  • ✅This is your exact topic, or very close to what your supervisor gave you
  • ✅Your supervisor has rejected one or more chapters and you don't know what to fix
  • ✅You are stuck on Chapter 3 or data analysis and nothing is making sense
  • ✅Your deadline is close and you are still far behind
  • ✅You can't find enough materials anywhere for your topic
  • ✅My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • ✅I saw my school project requirement and I am confused on where or what to do
  • ✅Everyone in my class has submitted their project and I haven't even started yet
  • ✅My supervisor rejected my research methodology and I don't know what to do
  • ✅I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • ✅I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • ✅I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • ✅My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • ✅I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • ✅I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • ✅This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • ✅I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–7 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project