DESIGN AND IMPLEMENTATION COMPUTERIZED EMPLOYEE CLOCKING SYSTEM

📄 Item Type: Project Material| 📋 64 pages| 📚 1–5 chapters| Amount: ₦5,000

DESIGN AND IMPLEMENTATION COMPUTERIZED EMPLOYEE CLOCKING SYSTEM

📄 Project Material 📋 64 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

DESIGN AND IMPLEMENTATION COMPUTERIZED EMPLOYEE CLOCKING SYSTEM

A CASE STUDY OF MARLUN CONSTRUCTION COMPANY ENUGU)

Abstract

Clocking systems are time system used in any firm to accurately record the number of hours worked by each staff or the work force of an employee on daily basics.

This system is design in such a way that it will also calculate the salary of the staff, his allowance and his over time with accuracy based on the work force of the staff or his work hours.

This system will enable the management to pay her staff accordingly to his or her effort may be.

This project work will make use of Microsoft visual studio ten (10) environment for its application design and development as a result of its ability and durability

TABLE OF CONTENTS

COVER PAGE

TITLE PAGE

CERTIFICATION

DEDICATION

ACKNOWLEDGEMENT

ABSTRACT

ORGANIZATION OF THE WORK

TABLE OF CONTENTS

      CHAPTER ONE

1.0  INTRODUCTION

1.1    BACKGROUND OF THE STUDY

1.2    STATEMENT OF PROBLEM

1.3    PURPOSE OF STUDY

1.4    SCOPE OF STUDY

1.5    LIMITATIONS

1.6    ASSUMPTION

1.7    DEFINITION OF TERMS

CHAPTER TWO

2.1    LITERATURE REVIEW

CHAPTER THREE

3.1    DESCRIPTION AND ANALYSIS OF THE EXISTING SYSTEM

3.2     GENERAL DESCRIPTION OF THE EXISTING SYSTEM

3.3     METHOD OF FACT FINDING USED

3.4     ORGANIZATIONAL STRUCTURE

3.5     OBJECTIVES OF THE EXISTING SYSTEM

3.6     INPUT, PROCESS AND OUTPUT ANALYSIS

3.7     INFORMATION SLOW DIAGRAM

3.8     PROBLEM OF THE EXISTING SYSTEM

3.9     JUSTIFICATION FOR THE NEW SYSTEM

CHAPTER FOUR

4.0  DESIGN OF THE NEW SYSTEM

4.1     INPUT SPECIFICATION AND DESIGN

4.2     OUTPUT SPECIFICATION AND DESIGN

4.3     FILE SYSTEM

4.4     PROCEDURE CHART

4.5     SYSTEM FLOWCHART

4.6     PROGRAM DESIGN

4.7     PROGRAM FLOW CHART

4.8     SYSTEM REQUIREMENTS

CHAPTER FIVE

5.0 SUMMARY CONCLUSION AND RECOMMENDATION

5.1     SUMMARY

5.2     CONCLUSION

5.3     RECOMMENDATION

BIBLIOGRAPHY


CHAPTER ONE

INTRODUCTION

1.0  BACKGROUND OF STUDY

        Employee clocking systems are time system used by organization to accurately record the number of hours worked by each employee every week

The clock have evolved with time and companies still need some sort of system that they can use employees payroll and ensure that the employees are paid for each hour they worked.

Today, employee use swipe cards with a negative stripe through a slot that reads their name and records the time every time they clock in or out, much like the old punch clock system of long ago.

At the end of a work week, the main computer computes the total hours worked for every employee and prints it out on a spread sheet. This rids the payroll system of human error, making it much more efficient.

The MALUM organization does not used computerized employee time system. The organization make use of manual time clock system, though time saving and error-free, is not entirely perfect.

Sometimes, the magnetic strip on the back of a card may get damaged. When the employee swipes the card, the machine may not register it.

Such inadequacy are corrected in the computer time clock system. Even with the advert computer software and advanced time keeping techniques, the principle of the employee time clock remains the same.

This project expresses the hourly employees will always need a way to keep track of their time and organizations will need logical ways to monitor and records an employee’s time to ensure productivity.

1.2  STATEMENT OF PROBLEM

        The problem is centered on how to design and implement a computerized employee clocking system for MALU organization.

From the study layout the problem determine are:

1.       Inadequacies of the manual time clock system

2.      The problem encountered by the staff reservation section.

3.      The impact of this software reservation section

4.      The impact of this software design is not entirely perfect.

5.      The company policy forbids employees from punching or swiping for each other and both employees stand a chance of losing their jobs if caught.

1.3  PURPOSE OF STUDY

The purpose of the study is:

1.         To determine the capability of computer that I amount of jobs which the computer can properly process at a given period.

2.        To correct the inadequacies of the manual time cock system.

3.        To advent the computer software and advanced time keeping techniques.

4.        To keep track of the time and ensure logical ways to monitor and record an employee’s time.

5.        To choose a system that suits the needs such as biometric time clocks, punch time chalks and computer based time clocks etc.

1.4  OBJECTIVES OF STUDY

        The main aims and objectives of this study is to study is to put to rest the cumbersome and hectic nature of employee time clocking system.

The manual time clock system, though time saving and error-free, but computer to correct the inadequacy and to make the time keeping record to be advanced.

Furthermore, on this study, the company rules and time clocking technology keep changing in order to keep employee instead in check, with the advent of new technology, like clocking in and out using noting but finger prints, such employee behavior is now a thing of the past.

1.5  SCOPE OF THE STUDY

        This study is limited to only MALUM organization and to the staff and the non-staff.

Though, the scope above is in such away that the study can be carried out in one and only way that is computerizing the employee clocking system. This will help to modernized the inherent problems encountered by the staff of this organization

1.6  LIMITATION

The factors that militated against this study in the course of gathering facts and figures, went a long way in limiting the intended scope of this study as a result of these setbacks, the work resources was available.

There is the unavailability of library facilities, lack of contribution by men of the organization. These factors contribute immensely to the un-attainment of the desired objectives for the study.

Moreover, lack of manpower in this course of the study. Upon all this was able to was able to successfully complete the resources work and come out with acknowledge work.

1.7  ASSUMPTIONS

        The complete implementation and follow up of what is contained in this work will be to a large extent improve and enhance the activities in planning a computerized employee clocking system in the organization.

The workers will be paid according to the time. It is commonly placed near the main entrance or break room. An employee who is not paid for break time must clock out for a break and must also remember to clock in before resuming work after the break. Sometimes, it is found that employees try to use time clock to gain an advantage.

1.8  DEFINITION OF TERMS

Computer system software: A set of written instruction, which the programs use to computer system.

Visual program: This program will help you to construct and design your program in any kind of form your program required.

Computer: According to French (1992:2) “ a computer is advice like a machine that works under the control of stored programs, automatically accepting and storing, processing data to produce information that is the result of that processing”.

PROGRAM: Set of instructions which are logically related in sequence and which describes actions to be taken by the digital computer in providing a solution on to a given problem.

SOFTWARE: Is the general term used to describe all the various programs that may be used on a computer system together with their associated documentation their with their associated documentation.

HARDWARE: This is the general term used to describe all the electronic and mechanical elements of the computer together with those devices used with the computer.

OPERATION: The action carried out on an activity or process.

MODULES: This is the act of portioning software’s logically into elements that performs specific functions and sub functions.

DATA ENTRY: This is the standard input device through which the system gets more of the instructions and commands

This Project is for You If:

  • ✅You are writing your final year project for the first time and don't want to make costly mistakes
  • ✅This is your exact topic, or very close to what your supervisor gave you
  • ✅Your supervisor has rejected one or more chapters and you don't know what to fix
  • ✅You are stuck on Chapter 3 or data analysis and nothing is making sense
  • ✅Your deadline is close and you are still far behind
  • ✅You can't find enough materials anywhere for your topic
  • ✅My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • ✅I saw my school project requirement and I am confused on where or what to do
  • ✅Everyone in my class has submitted their project and I haven't even started yet
  • ✅My supervisor rejected my research methodology and I don't know what to do
  • ✅I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • ✅I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • ✅I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • ✅My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • ✅I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • ✅I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • ✅This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • ✅I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project