iProject

AUTOMATED OF STOCK CONTROL AND SALES SYSTEM

๐Ÿ“„ Project Material๐Ÿ“š Chapters 1โ€“5๐Ÿ’พ MS-Word & PDF

Chapters 1โ€“5 ย |ย  โ‚ฆ5,000

Download Complete Project Now

CHAPTER ONE

 

1.0Â Â Â Â  INTRODUCTION

1.1Â Â Â Â  BACKGROUND OF THE STUDY

In business reactions, stocks are the assets of the organization in terms of materials, goods products that need to be replenished at its re-ordered level. Therefore, stock control process is the operation of continuously arranging receipts and documents relating to the materials to ensure that stock balance are adequate to support the current rate of consumption with one regards to economy. There are some problems associated with stock process of organizations, which include inadequate control of information, that is, there was no free flow of information relating to the stock, also accuracy in the financial information status, and as a result of these problems therefore calls for the computerized approach to stock keeping, monitoring and sales analysis.

 

1.2Â Â Â Â  STATEMENT OF THE PROBLEM

The following are the specification statement of the problem that necessitated the project:

(a)Â Â Â Â Â Â Â  Customers time is wasted during search for an item in stock.

(b)Â Â Â Â Â Â Â  Fraud and arithmetic error normally occurs in the use of bin card.

Therefore, using a computerized approach for stock keeping, monitoring and sales analysis, it will helps in reducing customer’s complains.

 

1.3Â Â Â Â  PURPOSE OF THE PROJECT

Here are objectives of the project:

(a)Â Â Â Â Â Â Â  To reduce the lost of processing each unit of item

(b)Â Â Â Â Â Â Â  To ensure that goods in stock are made know to the approach department

(c)Â Â Â Â Â Â Â  To ensure that stock are replenished at re-order level as at when due.

 

1.4Â Â Â Â  SIGNIFICANCE OF THE PROJECT

(a)Â Â Â Â Â Â Â  It point out the important of operating research in management secession.

(b)Â Â Â Â Â Â Â  It makes the analysis of goods in stock faster and gasser management control.

(c)Â Â Â Â Â Â Â  It makes decision making at managerial level easy and faster

 

 

1.5Â Â Â Â  SCOPE OF THE PROJECT 

The following are the scope of the project:

(a)Â Â Â Â Â Â Â  It considers how the customer consumes goods.

(b)Â Â Â Â Â Â Â  It cores the sues record of stock in store

(c)Â Â Â Â Â Â Â  It considers how goods are collected and received the store

 

1.6Â Â Â Â  LIMITATIONS OF THE PROJECT

Here are some limitations of the project:

(a)Â Â Â Â Â Â Â  Lack of materials

(b)Â Â Â Â Â Â Â  Time constraints

(c)Â Â Â Â Â Â Â  In ability to get the data to be in time.

(d)Â Â Â Â Â Â  Power failure

 

1.7Â Â Â Â  DEFINITION OF TERMS

(1)        Stock Record: These are the documents which record, from day to day, full particulars of individual’s receipts, and issues balances of stock.

(2)Â Â Â Â Â Â Â  Stock Taking/Checking: This is the process of physical verification of the quantities and condition of goods.

(3)        Re–Order level: This is the quantity between the maximum and minimum stock figuring at which it is necessary imitate Porsches requirement for new supplies.

(4)Â Â Â Â Â Â Â  Maximum Stock Level: Is the level at which stock should not be allowed to increase. In fixing this level, the best possible excepted conditions are used.

(5)        Minimum Stock Level: Is the level at which stock should not be allowed to full. The level must be wait – watched with cure because it is an indication of real change of “Stockâ€ย but which may result into production of sales stoppage.

This Project is for You If:

Yes, This Is My Situation โ€” Send Me the Complete Material

Here's everything you get with the complete project package:

โœ”Chapters 1โ€“5 (Word & PDF)
โœ”Abstract & Table of Contents
โœ”References, Citation & Bibliography
โœ”Fully Editable Microsoft Word Format
โœ”Original, Plagiarism-Free Content
โœ”Instant Email Delivery
Complete package โ€”โ‚ฆ10,000โ‚ฆ5,000
Price may return to โ‚ฆ10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
Iโ€™ve Seen Enough โ€” Get Me This Project Material

What Other Students Are Saying

โ€œThe process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.โ€
Zina
Kenpoly
โ€œMy supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.โ€
Favour
Nekede
โ€œMy supervisor almost finished me ๐Ÿ˜ญ He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.โ€
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Computer Science Final Year Research Project Topics & Materials ยป

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered โ€” Download the Complete Project
Message us