iProject

AUTOMATIC HAND DRYER WITH TEMPERATURE DISPLAY

📄 Project Material📋 65 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Download Complete Project Now

AUTOMATIC HAND DRYER WITH TEMPERATURE DISPLAY

 

ABSTRACT

This project deals on the design and construction of automatic hand dryer with temperature display facility which is capable of drying a wet hand placed under its vent goes of automatically. It corporate a temperature sensing and displays unit which displays the temperature of the blown out air. This system is designed in top-down methodology using passive and active components sensors (LM35 & LDR) at the input to sense temperature and hands respectively. The control unit is made up of signal conditioning unit, voltage comparator and frequency generator, and decimal counting unit. The output interface comprises transistor, driver, actuator, Electromagnetic relay and a –digit seven segment Display. The sensor are installed at the front of the blower and this device dries with warm air only. When a hand is placed under the vent to block the line of sight of the LASER Diode and LDR, the blower gets actuated and blows warm air. As the hand is removed, the blower stops automatically along side the temperature display. The principle behind the work of this system is that the hands must be opaque enough to block the line of sight of the opto coupler. This removes the stress, time and dangers associated with push button type. The result being automatic hand dryer with temperature display.

 

TABLE OF CONTENT

Title page       -           -           -           -           -           -           -           -           -           i

Certification page    -           -           -           -           -           -           -           -           ii

Approval page          -           -           -           -           -           -           -           -           iii

Dedication     -           -           -           -           -           -           -           -           -           iv

Acknowledgement               -           -           -           -           -           -           -           v

Abstract         -           -           -           -           -           -           -           -           -           vi

Table of content       -           -           -           -           -           -           -           -           vii

List of tables             -           -           -           -           -           -           -           -           -          ix

List of figures           -           -           -           -           -           -           -           -           x

 

 

Chapter One

1.1.           Introduction -           -           -           -           -           -           -           -           1

1.1.1.     Problem statement   -           -           -           -           -           -           -           1

1.1.2.     Aim and objectives              -           -           -           -           -           -           2

1.1.3.     Justification of the study   -            -           -           -           -           -           -           3

1.1.4.     Scope of the project             -           -           -           -           -           -           -           3

1.1.5.     Project report organization-           -           -           -           -           -           3

 

Chapter Two

2.1. Literature review          -           -           -           -           -           -           -           4

2.1.1. Analysis of the existing system      -           -           -           -           -           5

2.1.2. Theories and models relevant to the design -       -           -           -           6

 

Chapter Three

3.1. Automatic hand dryer with temperature display     -           -           -           9

3.1.1. Description of the system building blocks            -           -           -           9

3.1.2. Block diagram development into working circuit            -           -           9

3.1.3 System design specification             -           -           -           -           -           -           10

3.1.4. Power supply unit     -           -           -           -           -           -           -           11

3.1.5 Principle of operation of the system           -           -           -           -           -           12

3.1.6. System design calculation               -           -           -           -           -           13

3.1.7 The control logic circuit        -           -           -           -           -           -           14

3.2   The Ne555 timer                      -           -           -           -           -           -           14

3.3   Other System components     -           -           -           -           -           -           22

 

Chapter Four

4.1. Implementation, testing and result                 -           -           -           -           38       

4.1.2   Testing           -           -           -           -           -           -           -           -           38

4.1.3. Result -           -           -           -           -           -           -           -           -           39

4.1.4 Packaging        -           -           -           -           -           -           -           -           40

4.1.5. Bill of engineering quality   -           -           -           -           -           -           40

 

Chapter Five

5.1. Summary of achievement        -           -           -           -           -           -           42

5.2. Conclusion        -           -           -           -           -           -           -           -           43

            References    -           -           -           -           -           -           -           -           44

           

LIST OF TABLES

3.1 The system components list     -           -           -           -           -           -           -           35

4.1 Bill of engineering quantity -  -           -           -           -           -           -           -           40

LIST OF FIGURES

2.1       Physical layout of seven segment             -           -           -           -           -          -           8

2.2       Schematic diagram of seven segment       -           -           -           -           -           8

3.1       Block diagram of the system         -           -           -           -           -           -           10

3.2       Block diagram of the Regulated    -           -           -           -           -           -           12

3.3       Ne555 timer  -           -           -           -           -           -           -           -           -          14

3.4.      Internal block           -           -           -           -           -           -           -           -          15

3.5.      Pin out diagram -      -           -           -           -           -           -           -           -          15

3.6       Standard Ne555 astable circuit sensor     -           -           -           -           -           17

3.7       The blower    -           -           -           -           -           -           -           -           -          18

3.8       The LM35 integrated circuit sensor -       -           -           -           -           -           19

3.9       The LM35 wired circuit board       -           -           -           -           -           -           20

3.10    Voltmeter      -           -           -           -           -           -           -           -           -          21

3.11    Diagram of transistor           -           -           -           -           -           -           -          22

3.12.   Diagram IC linear voltage regulator 75xxICs      -           -           -           -           23

3.13    Photo-resistor -         -           -           -           -           -           -           -           -          24

3.14    The symbol for a photo resistor -  -           -           -           -           -           -           25

3.15    Voltage comparator ICs      -           -           -           -           -           -           -          27       

3.16    A typical Resistor    -           -           -           -           -           -           -           -          29

3.17    Resistor connected in parallel       -           -           -           -           -           -           31

3.18    Resistor in series      -           -           -           -           -           -           -           -          31

3.19    A typical electrolytic capacity -    -           -           -           -           -           -           32

3.20    A transformer           -           -           -           -           -           -           -           -          33
3.21    A typical PN junction Diode          -           -           -

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Instant Email Delivery
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Computer Engineering Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Delivery is instant. Once payment is confirmed, the material is sent directly to your email address. You can also download it immediately from the checkout page.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us