EFFECT OF INTERFACE ON THE QUALITY OF PETROLEUM PRODUCT IN MULTI PURPOSE PIPELINE SYSTEM

📄 Item Type: Project Material| 📋 65 pages| 📚 1–5 chapters| Amount: ₦5,000

EFFECT OF INTERFACE ON THE QUALITY OF PETROLEUM PRODUCT IN MULTI PURPOSE PIPELINE SYSTEM

📄 Project Material 📋 65 pages 📚 Chapters 1–5 💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now
ABSTRACT

Interface on petroleum product in multi-purpose pipeline system refers to as the zone of demarcation between two products where mixing occurs.  Generally, interface is a boundary layer, so the boundary between two products when they are pumped in succession is known as interface.

In Nigeria Petroleum Industries like NNPC (PPMC) make use of multi-purpose pipeline system. This is where interface comes in petroleum products.  Interface as defined above plays a lot of economics importance in petroleum product in multi purpose pipeline system three main products were specifically considered in this research project which also were the main products in Nigerian petroleum, they are PMS, AGO and DPK.  During the pumping of this products from refinery to depot station, they are not allowed to get in contact with each other because of lack of tolerance, due to this, they are pumped in successions and in-between two products in pipeline, interface solution comes into play the role of intermixing.

The main objective of this research project was to determine the effect of interface on the quality of products in multi-purpose pipeline.  Generally, interface if properly handled has no effect on the quality of petroleum products in multi-purpose because it is a product itself, but because of lack of proper handling, some effects are now uncounted.  The chief problem here is contamination, when interface is not properly handled, it results to the product, therefore the degree of this product were studied with distillation unit, flash point tester and hydrometer used to effect the degree.  The distillation unit was used for ASTM 36 test which confirm the products off or on.  Specification various classes of interface were analyzed, properties and factors affecting interface length were all considered.

The cost of accomplishment for the research project was N6500.00.

Contaminants which was the major problem on the quality of petroleum product in multi-purpose system and the methods used in rectifying the contamination were analyzed in this research project.  Some experimental tests which were carried out to determine the degree of contamination on which the quality of the petroleum products will be certified, when compared with that of standard showed only slight difference.  As the ASTM D86 distillation curve was gotten from the ASTM D86 test distillation carried out on the three grade of products.  The curve shows that the higher the temperature, the more the products vaporized.  The effect of pipeline vandalization on the interface arrival were treated.  Alleviation on contaminants, characteristics, advantages and disadvantages of petroleum products in multi-purpose pipeline were all treated to improve the quality.

TABLE OF CONTENTS

Chapter one

Introduction

Chapter two

Literature review

Historical development

Classes of interfaces

Products characteristics and properties

Factors affecting interface length

Effect of pipeline vandalization on the interface arrival

Advantages and disadvantages of petroleum product pipeline

Contamination limits

Disposal of interface contamination

Contaminants/impurities contained in the products

Methods used in purifying petroleum contaminated product

Chapter three

Experimental procedure

Chapter four

Results

Chapter five

Discussion

Chapter six

Conclusion and recommendation

Chapter seven

Reference

Chapter eight

Appendix

CHAPTER ONE

1.0       INTRODUCTION

Nigerian Pipeline and Depot Operations comprises of two main products; Viz: white and black products which are further broken down into:

1.         White products

a.                   Premium Motor Spirit (PMS)

b.                  Automative Gas Oil (AGO)

c.                   Dual Purpose Kerosene (DPK)

d.                  House Hold Kerosene (HHK)

e.                   Aviation Turbine Kerosene (ATK)

2.         BLACK PRODUCTS:

a.                   Locally Produced Crude

b.                  Gulf Crude

c.                   Bonny light

d.                  Ughlli Quality Control Crude

e.                   Imported Crude

f.                   Lagomar Crude

g.                  Arabia Light Crude

In consideration of three major sub-products in white products, namely, PMS, DPK, AGO.  These products travel through the pipeline network from one location storage facilities to another. However, as the products are traveling through the pipeline network, there will be a point or phase where two products will mix together.  The pint of the mixture is referred to as interface or when any two products are pumped in succession through a multi-product pipeline, the zone of demarcation between them where mixing occurs is called the interface.  These three products (DPK, AGO & PMS) are being used in our every day live, that is they are being used in some heavy duty machines, cars, lorries, generators and for domestic uses.

These products are being monitored when they are traveling through the pipeline by checking their point or zone of mixture (interface) with this type of checking, it will be hardly to obtained a contaminated products.

It is implied that once interface has correctly monitored and cut into its tank, there will be no room for a low quality products; so that when concumed by the public will no impose larger to human health, life, property and the environment generally.

Further more, almost all production industries uses these products in the machine operation to enhance smooth, production and efficiency of their machine.  The interface is of two classes; viz critical and non-critical interface, these two types are treated in the literature review.

This Project is for You If:

  • You are writing your final year project for the first time and don't want to make costly mistakes
  • This is your exact topic, or very close to what your supervisor gave you
  • Your supervisor has rejected one or more chapters and you don't know what to fix
  • You are stuck on Chapter 3 or data analysis and nothing is making sense
  • Your deadline is close and you are still far behind
  • You can't find enough materials anywhere for your topic
  • My project supervisor is very strict and I don't want to have any problem with my project work — I need a well structured and referenced project
  • I saw my school project requirement and I am confused on where or what to do
  • Everyone in my class has submitted their project and I haven't even started yet
  • My supervisor rejected my research methodology and I don't know what to do
  • I thought my topic was simple and easy but on Chapter 2 I cannot find any material and my work is due for submission
  • I have the content somehow but my references and bibliography are all over the place and I don't know how to arrange them properly
  • I am combining school with work and I genuinely do not have the time to write everything from scratch — I just need something to work with
  • My supervisor changed the topic I wanted and approved another one — I am confused on where to start from
  • I am scared of submitting something that will be flagged for plagiarism — I need something original that I can use as a proper guide
  • I have been browsing the internet for days looking for materials on this topic and I cannot find anything useful anywhere
  • This is not my first time doing this project — I have carried it over before and I cannot afford to do it again
  • I have written some chapters already but I am stuck midway and need to see how others handled the same topic
Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

Chapters 1–5 (Word & PDF)
Abstract & Table of Contents
References, Citation & Bibliography
Fully Editable Microsoft Word Format
Original, Plagiarism-Free Content
Delivery Within 24 Hours
Complete package ₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

I've Seen Enough — Get Me This Project Material

What Other Students Are Saying

↩ View More Reviews

Can't find what you're looking for?

Search thousands of project topics across every department.

Frequently Asked Questions

Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project