iProject

ACCOUNTING INFORMATION SYSTEM AS A MEANS OF ENHANCING FINANCIAL MANAGEMENT OF TRANSPORT COMPANY

📄 Project Material📋 65 pages📚 Chapters 1–5💾 MS-Word & PDF

Chapters 1–5  |  ₦5,000

Get Complete Project Material Now
ABSTRACT

Accounting information system in a transport organization has been a great problem to the third world countries in general, which Nigeria as a country has its own share. This research work, “Accounting information system in a transport organization, suggests ways of minimizing the effects of the problems of inefficient accounting information. It is believe that an improvement in this regards will enhance the performance of the corporation. To enable the researcher find solution to the problem of this study, some questions were raised in the form of hypotheses, which were developed comprising the null and alternative hypotheses. The methods of data collection were primary and secondary data method. The data collected were analyzed by use of simple percentages while chi-square was used to test the hypothesis formulated for validity. Findings show that accounting information is an indispensible tool in the management of Nigeria Railway Corporation and the activities of unqualified and incompetent accounting officers are responsible for the performance of the accounts departments in Nigeria Railway Corporation. Based on the findings, the researcher concludes that the accountant should put more efforts especially when computing the financial statement since accounts fraud result from ignorant of proper accounting procedures. Since the financial statement are sources of document of accounting information, efforts should be made in generating more relevant, timely, effective and accurate accounting information necessary for prevention or detection of fraud.                  TABLE OF CONTENT         Title page---------------------------------------------------------------------------          i         Approval page----------------------------------------------------------------------        ii         Dedication ---------------------------------------------------------------------------       iii         Acknowledgement -----------------------------------------------------------------       iv          Abstract ------------------------------------------------------------------------------       v         Table of content---------------------------------------------------------------------       vi CHAPTER ONE        1.0      Introduction-----------------------------------------------------------------       1         1.1      Background of the study--------------------------------------------------     1          1.2      Statement of problem-----------------------------------------------------       4          1.3      Objective of the study-----------------------------------------------------       5          1.4      Research questions--------------------------------------------------------       6 1.5      Hypothesis of the study---------------------------------------------------- 7 1.6      Significance of the study--------------------------------------------------- 8 1.7      Scope and limitation of the study---------------------------------------- 8 1.8      Definition of terms---------------------------------------------------------- 9 CHAPTER TWO: LITERATURE REVIEW        2.0      literature review----------------------------------------------------------      11 2.1     The concept of accounting information system----------------------- 16 2.2     The importance of accounting information---------------------------- 19 2.3     The users of accounting information------------------------------------ 20 2.4     Criticism of accounting information system in Nigeria         Railway                        Corporation Enugu------------------------------------------------------------ 21 2.5     The output of an information and the users.---------------------------- 24 2.6     The outline of the information generation  process and source document---------------------------------------------- 28 2.7     Application of computer system---------------------------------------------33       2.8     Accounts department in the Nigeria Railway Corporation Enugu    36 2.9     Functions of the accounts department------------------------------------ 38 2.10  Officers of the accounts department--------------------------------------- 38 2.11  Accounting officers and heads of department----------------------------39 2.12  Disagreement between accounts officers and heads of department  39 2.13  Accounting system in Nigeria Railway Corporation--------------------  40 2.14  Capital expenditure budgeting------------------------------------------------42 2.15  Expenditure checking section-------------------------------------------------46 ReferenceCHAPTER THREE: RESEARCH DESIGN AND METHODOLOGY 3.1    Research design--------------------------------------------------------------- 55 3.2    Sources of data ---------------------------------------------------------------- 56 3.3    Research instrument---------------------------------------------------------- 57 3.4    Reliability and Validity of research instrument------------------------- 58 3.5    Population --------------------------------------------------------------------- 58 3.6   Sample size/ techniques----------------------------------------------------- 60 3.7   Administration of research instrument----------------------------------- 63 3.8  Method of data analysis------------------------------------------------------- 64 3.9  Decision criterion for validity of hypothesis------------------------------ 65       CHAPTER FOUR: DATA PRESENTATION AND ANALYSIS…………           68          4.1   Data presentation-----------------------------------------------------------        71         4.2   Testing of hypothesis-------------------------------------------------------       87 CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATIONS         5.1   Summary of findings---------------------------------------------------------     96 5.2    Conclusion---------------------------------------------------------------------- 98 5.3    Recommendation------------------------------------------------------------- 98          Bibliography-------------------------------------------------------------------------      100 Appendix ----------------------------------------------------------------------------- 102 
  CHAPTER ONE INTRODUCTION

1.1 BACKGROUND OF THE STUDY

The Nigerian Railway Corporation (NRC) has been in existence for years. It is regarded the largest transport corporation in Nigeria and has a high network operations. The Nigerian railway corporation is One Hundred and Fourteen years (114) old and it runs a unilaterally designed track system of 1067mm charge gauge. Only 30km of its track distribution is in double track and that is within Lagos area. Nigerian Railway Corporation actually commenced rail business activities with the construction of the first rail line from Lagos to Ibadan 193m between 1998 and 1901. By 1964 when the construction of 640km Kano-Maiduguri rail line, then known as Bornu extension, was completed, the present core of the railway network hard been put in place.  Presently, the railway system is made up of 3’505 route kilometers and 4332 track kilometers. In addition to this is the 19km 1067mm gauge extension from Port-Harcourt to one deep sea port and the 277km standard gauge rail construction of 1435mm from Ajaokuta to Warri. Nigerian railway was transformed from its first and initial name. “Government Department of Railway” to Nigerian Railway Corporation in 1955 through the instrumentality of the statutory act of parliament which, apart from changing the name of the railway industry in Nigeria, equally conferred on it absolute monopoly as the institution recognized by law to carry out railway services.  The general aim and object of the statutory act of parliament of 1955 for Nigerian railway is to recognize same as carrying out its function of effecting “carriage of passenger and goods in a manner that will offer full value for money, meet cost of operation, improve market share and quality of services, ensure safety of operation and maximum efficiency, meet social responsibility in a manner that will meet the requirements of rail after, trade, commerce, industry and general public”. The headquarters of the corporation is located at Ebute-metta in Lagos state while the entire network is for administrative convenience, divided into seven autonomy districts viz.Lagos (Ebute-Metta junction), west (Ibadan), north (Zaria), east Enugu), North-west (Minna), north- central (Kanfanchem) and North-east (bauchi)  The railway system has been undergoing same rehabilitation and modernization with the full political and financial support of the federal government through the federal ministry of transport. The rehabilitation of the railway system includes  track spot removal of Lagos to Kano and Maiduguri to port-Harcourt, supply of 25 new locomotive engines from brazil south America to boost the registry motive power base of the corporation, up grading of the signaling and telecommunication system from manual to semi automatic, as well as rehabilitation of carriage and wagon workshops, re-equipping the workshops, supply of service support (spare part consumables), strategic rebranding of the corporation, rehabilitation of stations and marshalling yards inter alia.  Equally, new railway lines are being constructed in standard gauge (1435mm). These include: Ajaokuta-Warri of 277km, Kaduna-Abuja (Idu) line of 186km while the scope of work for Lagos-Ibadan segment is under review together with its cost implications. The Nigerian Railway Corporation has contributed amenably towards the improvement of social life and the development of the national economy. This is through to be extended to every part of the country that is the haven stages which will lead to permanent prosperity confident was such an ultimate triumph of the railways.  However, regardless of the huge success made by the corporation, it is facing a hard time. 

This Project is for You If:

Yes, This Is My Situation — Send Me the Complete Material

Here's everything you get with the complete project package:

✔Chapters 1–5 (Word & PDF)
✔Abstract & Table of Contents
✔References, Citation & Bibliography
✔Fully Editable Microsoft Word Format
✔Original, Plagiarism-Free Content
✔Delivery Within 24 Hours
Complete package —₦10,000₦5,000
Price may return to ₦10,000 at any time.

See Our Conversations With Students on WhatsApp

Students sharing their experience after using our service

Urgent delivery confirmed
Urgent delivery confirmed
Payment received and project delivered
Payment received and project delivered
Quality work and a repeat order
Quality work and a repeat order
Returning customer appreciation
Returning customer appreciation
Customer appreciation
Customer appreciation
I’ve Seen Enough — Get Me This Project Material

What Other Students Are Saying

“The process was actually fine and I got my project quickly. The only thing I didn't really like was that I would have preferred they sent it via WhatsApp instead of email, because email took a bit of checking on my side. But once I got it, everything was already complete and I just edited small parts before submitting.”
Zina
Kenpoly
“My supervisor rejected my Chapter 1 and 2 and I was honestly lost. I got a material here and it already had everything arranged properly. I just adjusted it to my topic and resubmitted. The difference was clear immediately.”
Favour
Nekede
“My supervisor almost finished me 😭 He rejected everything and said I didn't understand basics. I downloaded something here, used it to restructure my work, and resubmitted. That was how I escaped serious stress.”
Nnamdi
Absu

Can't find what you're looking for?

Search thousands of project topics across every department.

Related Project Materials

See More Accounting Final Year Research Project Topics & Materials »

Frequently Asked Questions

Is this project original and plagiarism-free?
Yes. All project materials on iProject are original, well-researched, and crafted to be plagiarism-free. They are intended as academic guides and reference materials.
What format will I receive the material in?
You will receive the complete project in both Microsoft Word (.docx) and PDF formats, making it easy to edit and submit.
How soon will I get it after payment?
Once payment is confirmed, the material is delivered within 24 hours to the email address supplied at checkout.
Can I edit the content to fit my own case study?
Absolutely. The Word format is fully editable, allowing you to modify the content, swap out case studies, and adapt the material to your specific research context.
All My Questions Are Answered — Download the Complete Project
Message us