Quick Project Search


| Back |

Department of Bio-Chemistry | Final Year Research Project Topics | Download Free Projects

  • 81. CHEMICAL/MINERAL COMPOSITIONS OF WATER EXTRACTS OF Hibiscus sabdariffa

    » ABSTRACT This work was carried out to investigate the chemical properties of the water extract of zobo (Hibiscus sabdariffa) drink using the modern atomic absorption spectrophotometer. Zobo drink is a popular drink in the Nigeria, especially in the northern part of Nigeria. The result of the analysis indicated that the drink is high in vital mineral nutrients required for the healthy growth by hum...Continue Reading »

    4,844 engagements | 

  • 82. EVALUATION OF ANTIOXIDANT POTENTIAL OF MONODORA MYRISTICA (AFRICAN NUTMEG)

    » ABSTRACT This work evaluates the antioxidant potential of Monodora myristica (African nutmeg). Monodora myristica extract was obtained by solvent extraction using n hexane and used as treatment on freshly prepared crude palm kernel oil and palm oil. Equal volume of oil samples were subjected to different concentration of extract treatment (0.2ml,0.4ml, 0.6ml, 0.8ml, 1.0ml using syringe. These oil ...Continue Reading »

    4,007 engagements | 

  • 83. EFFECT OF METHANOLIC LEAF EXTRACT ON ACALYPHA WILKESIANA ON WEIGHT PARAMETERS IN...

    » 2.1 MATERIALS 2.1.1 PLANT MATERIALS FOR ANALYSIS Fresh mature plants of Acalypha wilkesiana were collected from the natural habitat in October within Ambrose Alli University, Ekpoma, Edo State, Nigeria. The plant was authenticated in the Department of Botany, Ambrose Alli University, Ekpoma, Edo State, Nigeria. The leaves were picked, washed in distilled water air dried and weighed. The weight of ...Continue Reading »

    2,637 engagements | 

  • 84. THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJE...

    » THE EFFECTS OF DELAYS AND DISRUPTION ON THE COST OF BUILDING CONSTRUCTION PROJECTS IN NIGERIA (A CASE STUDY OF ENUGU STATE) ABSTRACT This project is purposely for determining the effects of delay and disruption on the cost of building construction project in Nigeria, ascertaining the cost, which aim at x raying unnecessary delay and disruption in the normal processes of procuring and prosecuting b...Continue Reading »

    3,861 engagements | 

  • 85. DETERMINATION OF PH VALUE OF PURE WATER SACHET AND BORE HOLE WATER

    » ABSTRACT This project work focused on the determination of the PH values of pure water sachet and sample of borehole water found in Benin city, Edo State. The five different pure water sample analyzed include ages, Maria, Faith, Mark, Uniben and Uncle Sam. The five different borehole sample analyzed include the area located at 8 Edo Street, Ugbowo, Block 25 Technical Estate No, 46 Jonathan Akpobar...Continue Reading »

    7,268 engagements | 


Can't find what you are looking for? Hire An IPROJECT Writer To Work On Your Topic.

Go to Hire A Writer Page

Searching makes things a lot easier.. Search for what you are looking for

Quick Project Search